Service reference ABU DHABI, United arab emirates IND 36 months

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Managing the Health and Safety of Contractors
A Joint Code of Practice Objectives and Summary Presentation
East Hampton High School July 2013 – July 2014 Design Phases.
HEAT TRACING SPECIALIST
Special Inspections
Maximo extension to worldwide Suppliers for complete data integrity
SOGAT 2012 The Shah Gas Development Project
C MKT Overview of CH2M HILL US Civil Nuclear Industry Programme in Romania September 2009.
Managing a Successful Mechanical System project Following design – what next?
Ensure Vendor/Engineer of Choice Product Quality
COMPANY PROFILE +66 (0) , +66 (0) , +66 (0) , +66 (0) /65 Moo 4 Tumbol Tubma Amphur Muang Rayong 21000
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
© Business Review - Arabian Peninsula January 24, 2010 / Slide 1 ABB Contractors Business Partners John Hartnett May, 2010.
Contractor Safety Management
“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building.
Chapter 9 - Quality Systems Team #2: Cindy Guthrie, Amy Randolph and Robin Tomer.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Process Engineer’s Role in Project Management Dr Abdullah Malik.
WELCOME The Fixed Fire Suppression Systems. We carry out the supply installation & Annual required maintenance in regard to the fixed.
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
SHE Code 34: Electrical Safety Safety, Health and Environment (SHE) Group.
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Construction Specifications
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Research Prototype to Production
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
James Denton-Brown Industrial & Ports Practice Leader Bechtel Civil-San Francisco 1 Khalifa Port and Khalifa Industrial Zone-Abu Dhabi Middle East Case.
Construction of a Transfer Station
Capital Insight Pty Ltd ABN SYDNEY MELBOURNE BRISBANE Staff Training 11 March 2009 Health Infrastructure’s.
1 PORTFOLIO OF SOLUTIONS EAB POWER ENGINEERING LTD CO.KG.
Chapter 6 Requirements for a Maintenance Program.
THE CONSTRUCTION TECHNOLOGY CONSULTANTS Lowther-Rolton Established 1987 Safety Quality Leadership Innovation Commitment The Methodology and Benefits of.
Alfa Electrochlorination Specialists. Alfa Electrochlorination Specialist LLC was established in Abu Dhabi, United Arab Emirates on July 2004, founded.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Perator ualification. Stroud Diving & Hydrography Marine Engineering Systems Co, Inc Stroud Diving & Hydrography Marine Engineering Systems Co, Inc Bob.
The Descon Group operates four major business lines
Maintaining Safety Standards
Project Project Objective Component 1 Component 2 Component n …
Maintaining Safety Standards
Electrochlorination Alfa Electrochlorination Specialists Electrochlorination
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
A New Quality Program for the Water Industry
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
Global Connections Day Building Safety Service Provider
Construction & Civil Work
ChE 473K Plant Design R. Bruce Eldridge.
Leading Indicators and Dashboarding for Advanced Work Packaging
SHE Code 34: Electrical Safety
In Abu Dhabi.
Leo Associates Services
بازاریابی و بازرگانی زمستان 93.
DTF implementation Roles and responsibilities
Always follow Night driving rules
SI The API Source Inspector(SI) roles Manage client expectations
ISO 9001:2000 Management System Overview
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

Service reference ABU DHABI, United arab emirates IND 36 months PROJECT Third Party Inspection Services during the Engineering, Procurement and Construction (EPC) of Floating Marine Service Stations at Yas Island and Khalifa Bridge, Abu Dhabi CLIENT ADNOC Distribution BUREAU VERITAS ROLE The scope of SERVICES relates to “Quality Control/ Inspection/ audits and Design Review” at EPC Contractor facilities and at the Construction site during design, fabrication of project materials, equipment and package units and during installation and erection of same. Bureau Veritas scope of services is divided into the following categories: Engineering Design Review - to ensure that the EPC Contractor is complying with the design requirements in accordance with International Codes on materials, equipment or site operation. Site Inspection - perform inspection at construction site during installation as per approved ITP to ensure EPC deliverables meet ADNOC Distribution requirement. Auditing Service - to perform audit of quality records, procedures, inspection/ test. results and documentation packages including as built documentation, etc.. as per COMPANY instruction IND 36 months © Copyright Bureau Veritas