Nakamura, Takaharu / Fujitsu

Slides:



Advertisements
Similar presentations
Grid-of-Beams (GoB) Downlink Multi-User MIMO
Advertisements

GSC: Standardization Advancing Global Communications Evolution of TD-SCDMA China Communications Standards Association (CCSA) Chicago, May 29th to 2nd June,
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
Way forward for LTE DL 4Rx AP SI on RF
© NOKIAProduced as informative material for 3GPP RAN WG1 meeting No. 2 Downlink Shared Channel - DSCH DSCH associated with a dedicated channel (DCH) Downlink.
LTE-A Carrier Aggregation
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#75 Meeting Arrangement May, 2015 Fukuoka, Japan Tuomo Säynäjäkangas.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#76 Meeting Arrangement Aug, 2015 Beijing, China Tuomo Säynäjäkangas.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#77 Meeting Arrangement Nov, 2015 Anaheim, CA, US Tuomo Säynäjäkangas.
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
Mobile Broadband Evolving to OFDM + MIMO
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement May, 2016 Nanjing, China Xutao Zhou.
1 Presentation Title 3GPP WORK ON 5G Presenter Erik Guttman Session
Technology training (Session 6)
1210 MHz of harmonised spectrum (ECC framework)
CT WG6 status report to TSG CT #75
Draft WF on single Tx switched UL
Status Report RAN WG6 to TSG-RAN #73
IEEE Presentation Submission Template (Rev. 9) Document Number:
WF on NR spectrum NTT DOCOMO, INC. R
Status Report RAN WG6 to TSG-RAN #73
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
Way forward on emissions scaling
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
3GPP PCG#2_05 Moscow, Russia, 6 October 2008
RAN5#57 RF Group Timetable – v1
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
Way forward on DL ACLR&ACS for WP5D LS
Nakamura, Takaharu / Fujitsu Issam Toufik/ MCC technical support
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
SA WG6 status report to TSG SA#77
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on UE mandatory channel bandwidth for NR bands
Evaluation Model for LTE-Advanced
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Motivation for WI on "LTE-based V2X Services"
WF on LTE-NR DC with UL coexistence
RP Motivation for New WI (RP ): NB-LTE for Low Complexity Radio Access Network for Cellular Internet of Things Alcatel-Lucent, Alcatel-Lucent.
Explanation of draft TP IP Radio Network Development Department
EXECUTIVE SUMMARY CA combinations are divided into intra-band (contiguous and non-contiguous) and inter-band. Aggregated carriers can be adjacent or non-adjacent.
Antennas Topologies Directly connecting two duplexers together can affect each other’s filter characteristic, thereby losing the isolation that is needed.
Work Plan for IEEE m Standard & IMT-Advanced Submission
3GPP Status.
Erik Guttman, Chairman of 3GPP TSG SA Samsung Electronics
I-Kang Fu, Paul Cheng, MediaTek
WF on LTE-NR Coexistence
IEEE MEDIA INDEPENDENT HANDOVER
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
Functional Requirements for EHT Specification Framework
Mark Epstein Senior Vice President Qualcomm
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
ITU-R Liaison Group Report - Session #65 Opening Plenary
IEEE IMT-Advanced Review Process
WiGig technologies IEEE ad/ay
Strawmodel ac Specification Framework
ITU-R Liaison Group Report - Session #65 Opening Plenary
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
on the overall 5G-NR eMBB workplan
Functional Requirements for EHT Specification Framework
ETSI BRAN Update (IEEE Co-Existence Workshop)
Presentation transcript:

Nakamura, Takaharu / Fujitsu RP-100728 TSG-RAN meeting #49 San Antonio, TX, US, Sep.14-23, 2010 RAN-WG4 Report Nakamura, Takaharu / Fujitsu Chairman Issam Toufik MCC technical support

Meeting summary / statistics and Work load analysis (Incl Meeting summary / statistics and Work load analysis (Incl. CR summary, WI/SI status etc.) *tdoc and CR statistics are as of Sep 11

Special election of vice chair A special election for the position of a Vice Chairman of RAN WG4 was held during RAN4#56 in August. Dr. Dawei Zhang (China Mobile Com. Corporation / CCSA) was elected as a new vice chair of RAN4. We thank for Dr. Christian Bergljung (Telefon AB LM Ericsson / ETSI) for his every endovor as a vice chair of RAN4.

Working agreement on UMTS800 Eu The working agreement in RAN#48: CR0530r1 to TS 36.101 "E-UTRA; User Equipment (UE) radio transmission and reception" v9.3.0 in RP-100683. Modification in table 7.3.1-2 for the case E-UTRA Band 20 for the 10MHz channel bandwidth was the point. No voting would be necessary in RAN#49 since the interested parties had intensive discussions during the week of RAN4#56 in Madrid and agreed the way forward. Side information: CR617r1 to TS36.101 (in R4-103463) agreed in RAN4 as a separate category F CR, which further clarifies the receiver requirement.

Meeting statistics - One ordinary & one AH meeting were held since the last RAN plenary meeting - One ordinary and two ad-hoc meetings are planned before the next plenary. - RAN4 officials: Chair: Mr. Takaharu Nakamura, Fujitsu / ARIB Vice Chair: Mr. Edgar Fernandes, Motorola / ETSI Vice Chair: Dr. Dawei Zhang , China Mobile / CCSA MCC Support: Dr. Issam Toufik, ETSI Meeting Date Place Host Delegates Tdocs AdHoc #10-03 28 Jun – 2 Jul Bratislava, SK EF3 around 100 377 R4#56 23 – 27 Aug Madrid, ES around 120 714 Meeting Date Location Host Band 13 AH 29-30 Sep. Chicago, US US Cellular AdHoc#10-04 11-15 Oct Xi’an, CN CATT RAN4#57 15 – 19 Nov Jacksonville, US NAF3 Welcome!

Adhoc #2010-03 in June 377 tdocs for limited subjects were submitted and handled. Tdocs agreed at the adhoc were reviewed in R4#56 and most of them were ratified (2 tdocs were replaced by revisited/updated version). Topics handled in the adhoc: Maintenance of closed WIs DC-HSDPA, DC-HSUPA, Conformance tests for Multi-Standard Radio (MSR), CSG reselection requirements, Enhanced Dual-Layer transmission for LTE Rel-10 WIs Carrier aggregation (IMT-A), Relay (IMT-A), 4 carrier HSDPA, UL-MIMO for LTE, Enhanced ICIC for non-CA in het-net for LTE , Fixed Wireless CPE, Two-antenna LCR TDD Type 1&2 UE Rx, UE OTA testing - LME Free Space test, MSR BS RF requirements for non-contiguous spectrum deployments, MIMO Testing in HSDPA New frequency bands / maintenance of existing bands (rel. independent) UMTS/LTE3500, L-Band LTE for ATC of MSS in North America, 2 GHz band LTE for ATC of MSS in North America, LTE TDD in 2600MHz for USA, Expanded 1900 MHz Band for UTRA and LTE, Band 20 maintenance, Band 12 maintenance Study Items Extending 850 MHz, Signaling and procedure for in-device coexistence interference avoidance

R4#56 in August Still higher work load in general. 714 tdocs were submitted. Decreasing gradually due to the adhoc discussions. Still higher work load is observed in several areas: Maintenance of the earlier releases etc. WIs/Sis which is planned to be completed by December were prioritized. Performance works in general were de-prioritized as the consequence. Sessions started from early morning (eg. from 8 am) and lasted till late evening. Some of the tdocs were covered only in the ad-hocs and some of the ad-hoc sessions were run in parallel. 73 tdocs were not handled and carried over to future meetings. As a whole, ad hoc in June and R4#56 have handled almost 1100 tdocs. Thanks for those participated from early morning to late evening sessions.

Work load analysis < R4#56 case > ‘Maintenance activities’ for earlier releases: almost 40% LTE-Advanced related works: 26%. Tdoc statistics in R4#56 Rel-7/8/9 maintenance work: 4% LTE maintenance: 24% MSR: 2% HNB: 7% LTE-Advanced (Rel-10): 27% Other Rel-10 18% New frequency bands 9 % Study items : 3 % Others: 6 % Number of tdocs per agenda items in R4#56

Work load analysis (cont’) < R4#56 case > - 73 tdocs out of 714 were ‘Not handled’. (Missing rate = 10.22%) - Simple linear interpolation tells us “RAN4 would need extra 2.1 days to cover all of its potential subjects’. (The meeting could be completed Monday morning next week).

Work load analysis (cont’) < Possible actions > Meeting arrangement plan: R4 AH in October: Limited technical discussions on Rel-10 WIs (eg. Core part of LTE-Advanced etc.) Possible parallel sessions R4#57 in November To review and ratify agreement in January AH. Possible parallel adhoc sessions Parallel Ordinary sessions (as a trial): Sessions to be chaired by the R4 officials. The parallel sessions would provide extra two or three meeting dates effectively. Earlier submission of your contributions would help the progresses very much.

CR summary Release 99 & Rel.-6 : No CRs  Rel-7: (Cat F:4) TEI-7 (Correction of CQI req.): 1 CR TEI-7 (LCR-TDD SEM): 1CR TEI-7 (64QAM for Repeaters): 2 CRs Rel-8 (Cat. B: 2, Cat F:31) LTE-RF (UE,BS,RRM) 25 CRs Freq. bands : 2 CRs Others: 9 CRs Rel-9 (Cat.B:4,Cat. D:1, Cat.F:57) LTE-RF 41 CRs MSR 22 CRs LCS for LTE 5 CRs Eu800MHz band 1 CRs TEI-9 13 CRs Others 15 CRs Rel-10 (Cat.B:9) LTE 2.6G TDD in US 9 CRs Number of agreed CRs (as per Release & category) Number of agreed CRs (as per WI)

WI/SI status summary (for information)

Work Item status (RAN4 leads) [1/3] Name SI/WI Compl. % E.C.D UMTS/LTE 3500 WI 60 → Dec. 2010 UE OTA conformance testing methodology- Laptop Mounted Equipment Free Space test 35 → 45 Sep. 2011 Four carrier HSDPA 40 → 60 (Core) 5 → 10 (Perf.) Core: Dec. 2010 Perf.: May 2011 LCR TDD Home NodeB Core: completed 20 → 50 (Test) (Core: Jun. 2010) Test: Dec. 2010 Fixed Wireless Customer-Premises Equipment (CPE) 20 → 40 (core) 0 → 0 (R5: Test.) Core: Sep. 2010 → Mar. 2011 → June. 2011 A-GNSS Minimum Performance for UTRAN 80 → 95 (R4) Sep. 2010 Carrier Aggregation for LTE(IMT-A) 15 → 30 (Core) 5 → 5 (Perf) Test: Jun. 2011 Enhanced Downlink MIMO 40 →80 (Core) 0 → 0 (Test)

Work Item status (RAN4 leads) [2/3] Name SI/WI Compl. % E.C.D LTE UL MIMO WI 55→ 70 (Core) 5 → 10 (Perf.) Core: Dec. 2010 Perf: Jun. 2011 Relays for LTE 15 → 20 (Core) 0 → 0 (Test) Test: Mar. 2011 Enhanced ICIC for non-CA based deployments of heterogeneous networks for LTE 15 → 40 (Core) 0 → 5 (Perf.) LTE TDD in 2600MHz for USA 20 → 100 (Core)  0 → 100 (Perf.)  Dec. 2010 → Sep. 1020? Add 2 GHz band LTE for ATC of MSS in North America 10 → 60 (Core) 5 → 10 (Perf.) Add L-Band LTE for ATC of MSS in North America 5 → 60 (Core) LTE Self Optimizing Networks (SON) enhancements 10 → (Core) MU-MIMO for 1.28Mcps TDD 0 → 0 (Perf) Perf: Mar. 2011 Performance Requirements for two-antenna 1.28Mcps TDD Type 1 and Type 2 UE receiver Core: Completed 25 → 45 (Perf.) (Core: Jun. 2010) Perf: Dec. 2010

Work Item status (RAN4 leads) [3/3] Name SI/WI Compl. % E.C.D Support of New Band Combinations for Dual-Band Dual Cell HSDPA WI New → 5 (Core) New → 0 (Perf.) Core: Mar. 2011 Perf: Sep. 2011 MIMO Testing in HSDPA New →20 (Perf.) Perf: Dec. 2010 LTE-Advanced Carrier Aggregation of Band 3 and Band 7 * New → 0 (Core) Core: Dec. 2011 Perf: Dec. 2011 Expanded 1900 MHz Band for UTRA and LTE New → 5 (Perf.) Core: Dec. 2010 Multi-standard radio Base Station RF requirements for non-contiguous spectrum deployments * The WI will be kept on hold for the time being.

Study Item status (RAN4 leads) Name SI/WI Compl. % E.C.D. Measurement of radiated performance for MIMO and multi-antenna reception for HSPA and LTE terminals SI 85 (Kept on hold) Dec. 2010* Extending 850MHz 35 → 45 Dec. 2010 * The SI for MIMO-OTA will be kept on hold by October 2010.

ITU-R related activities RAN4 reviewed the responses drafted by ITU-R ah and provided several feedbacks in the following LSs. R4-102796 LS to RAN, cc to ITU-R AH LS response to ITU-R WP5D on "REVISION OF RECOMMENDATION ITU-R M.1580-3 AND M.1581-3 (WORKING DOCUMENT TOWARDS M.1580-4 AND M.1581-4)" Telecom Italia R4-102797 LS to RAN, cc to ITU-R AH LS response to ITU-R WP5D on "REVISION OF REPORT ITU-R M.2039-1 AND WORK ON UHF SHARING STUDIES" Telecom Italia R4-103419 LS to ITU-R AH LS response on "COMPATIBILITY OF BROADBAND WIRELESS ACCESS SYSTEMS AND FIXED-SATELLITE SERVICE NETWORKS IN THE 3400-4200 MHz BAND" Telecom Italia Approved

Rel-7/Rel-8 maintenance Work load is decreasing however Rel-8 LTE needs maintenance work. Rel-7: TEI-7: Correction of CQI requirements: 1 CR to TS25.101, affects TS34.121-1 LCR-TDD SEM: 1CR to TS25.102, affects TS34.122 64QAM for Repeaters: 2 CRs to TS25.106, TS25.143 Rel-8 Tow Cat. B CRs: Introduction of CSG cell reselection requirements: CR for TS36.133 To verify UE autonomous search function for CSG cells. LTE_TDD_2600_US spectrum band definition additions to TS 36.307. (New freq. band) LTE-RF (UE,BS,RRM) 25 CRs Others: 9 CRs

Rel-9 maintenances Four Cat. B CRs (Introducing new test cases): One CR on LTE_TDD_2600_US spectrum band definition additions to TS 36.307 The following CRs would not affect actual requirements Two CRs (LCS_LTE test cases) for TS36.133: E-UTRAN FDD UE Rx – Tx Time Difference Measurement Accuracy test case E-UTRAN FDD Intra Frequency RSTD Measurement Accuracy test case One CR (MSR conformance test work) for TS37.141: Output power dynamics Other CRs: LTE-RF 41 CRs MSR 22 CRs* LCS for LTE 5 CRs Eu800MHz band 1 CRs TEI-9 13 CRs Others 15 CRs * LS to GERAN1 approved (R4-103395). The LS asks GERAN1 to review and endorse the GERAN-related parts of the CRs (for TS 37.104, TS37.141 and TS37.113).

Band 13 related The following tdocs were discussed. R4-103405 Summary of Ad-Hoc meeting for band 12 during RAN4 Alcatel Lucent R4-103270 B12* (modified by guard band changes) Motorola R4-102921 Release Independent Analysis of Band12 UE Interference Issues Samsung R4-102959 The Determination of Band 12 Filter Requirements Huawei R4-103404 The Adaptation of 1 MHz Guard Band for Band 12 Huawei R4-103192 Band 12: on requirements for Block D and E interferers Ericsson, ST-Ericsson R4-102958 Acoustic Wave Filters with Improved Frequency Characteristics for Better Use of the Spectrum Resources Huawei An adhoc session to seek the way forward is planned (Sep. 29-30, Chicago, IL, US)

New Frequency bands UMTS/LTE 3500 UMTS/LTE 3500 Work Item TR v0.8.0 was approved capturing all the agreed TPs in the adhoc in Bratislava in June. L-Band LTE for ATC of MSS in North America Work plans and TPs on BS requirements etc were approved. TR36.8xx (V0.3.1) capturing approved TPs approved (Tdoc 3462) 2 GHz band LTE for ATC of MSS in North America TPs for UE/BS requirements were approved. TR36.8xx (V0.3.0) approved (Tdoc 3427) LTE TDD in 2600MHz for USA All the necessary requirements have been agreed as TPs for the TR. CRs for RF requirements, RRM as well as EMCs have been agreed. The work item is completed. (3 months earlier than originally planned.) Extended 1900MHz Skeleton TR agreed in Bratislava Adhoc is formally approved (tdoc. 2765)

Rel-10 works (LTE-Advanced) Carrier Aggregation for LTE Good progress but would need further effort to finalize the work in time. Co-existence studies: Simulation outcomes based on #4 scenario captured in a Draft-CR in tdoc. 3304) and agreed. UE categories agreed as in R4-103417. A number of contributions for Activation/Deactivation of CC and response LS to RAN2 agreed (R4-103351). A way forward agreed as in R4-103433. UE RF requirements (TX-RX frequency separation, CA operating bands, CA Classes, Channel raster, minimum and OFF Tx power) agreed. UE TR TR 36.807v0.1.0 approved. (Tdoc. 3431) BS RF requirements (Occupied bandwidth, Channel arrangement, Operating band unwanted emission, ACS and narrow-band blocking, Receiver spurious emissions etc.) agreed. BS TR TR 36.808, V0.2.0 & V0.3.0 approved (Tdoc. 3140, 3432)

Rel-10 works (LTE-Advanced) Relays for LTE In R4#56, most of the technical discussion took place in an adhoc session. (See adhoc report in tdoc. 3440) Scenario description, propagation models and MCL, ACIR model, throughput performance model and simulation cases agreed. TP on relay synchronization requirements approved.

For the ITU-R submission (List of RAN4 TSs for LTE-Advanced) R4 to review the completion levels and work plans to complete them in time. TS Title Remarks TS 36.101 User Equipment (UE) radio transmission and reception TS 36.307 Requirements on UEs supporting a release-independent frequency band TS 36.104 Base Station (BS) radio transmission and reception TS 36.141 Base Station (BS) conformance testing TS 36.133 Requirements for support of radio resource management TS 36.124 EMC requirements for mobile terminals and ancillary equipment TS 36.113 BS and repeater ElectroMagnetic Compatibility (EMC) TS 36.106 FDD repeater radio transmission and reception t.b.c. TS 36.143 FDD repeater conformance testing TS 36.171 Requirements for Support of A-GNSS TS 37.104 E-UTRA, UTRA and GSM/EDGE; MSR BS radio transmission and reception TS 37.141 E-UTRA, UTRA and GSM/EDGE; MSR BS conformance testing TS 37.113 E-UTRA, UTRA and GSM/EDGE; MSR BS Electromagnetic Compatibility (EMC)

Rel-10 works (cont’d) Fixed Wireless Customer-Premises Equipment (CPE) AGNSS Minimum Performance Specification Development No contribution. Fixed Wireless Customer-Premises Equipment (CPE) CPE TP for TR36.807 approved. (tdoc R4-102759 ) Simulation assumptions for coexistence studies discussed. Four carrier HSDPA Frequency bands for 4C-HSDPA agreed. Several CRs for DC-HSUPA agreed (as a maintenance work). RRM requirements discussed. Discussion for performance requirements skipped due to lack of time 1.28 Mcps TDD Home NodeB RF requirements TR25.869 V0.3.0 approved. TPs on “Interference mitigation methods of 1.28Mcps TDD” approved.

Rel-10 works (cont’d) 1.28Mcps TDD Multi-carrier HSUPA [TDD_MC_HSUPA] Impact analysis on BS requirements, Performance impact of having different power per carrier in MC-HSUPA for the feature were discussed. Performance Requirements for two-antenna 1.28Mcps TDD Type 1 and Type 2 UE receiver Simulation results of DCH, HS-DSCH and control channels for the type1 UE receiver were reviewed. Enhanced Downlink Multiple Antenna Transmission for LTE [LTE_eDL_MIMO] MIMO Correlation Matrices to 8 Tx Antennas or Cross-Polarized Antennas discussed. Base Station Rated Output Power with 8 Transmit Antennas discussed. Uplink Multiple Antenna Transmission for LTE [LTE_UL_MIMO] UL MIMO Work Item TR approved as V0.1.0 64QAM EVM requirement, impact of UL SU-MIMO on PH mapping discussed. TP for UL MIMO channel mode (to Annex B in the TR) approved. Simulation Results on 10M BS Demodulation for 2 Tx reviewed.

Rel-10 works (cont’d) Enhanced ICIC for non-CA based deployments of het-net for LTE Timeline of the work plan, RRM requirements discussed. LTE Self Optimizing Networks (SON) enhancements No contribution was available to R4#56. Network-Based Positioning Support in LTE [LCS_LTE-NBPS] No contribution at R4#56. Minimization of Drive Tests for E-UTRAN and UTRAN [MDT_UMTSLTE] Initial discussion on measurements took place.] MIMO Testing in HSDPA [MIMO_HSDPA] Due to lack of time and because of the late contributions, no progress achieved. MU-MIMO for 1.28Mcps TDD No contributions was available at R4#56. UE Over the Air conformance testing- Laptop Mounted Equipment Free Space test [UEAnt_FSTest] In an adhoc session in R4#56, several measurement methods were studied. LTE-Advanced Carrier Aggregation of Band 3 and Band 7 [LTE_CA_B3_B7] There was a contribution which was not handled because the work was kept on hold.

Rel-10 works (cont’d) Support of New Band Combinations for Dual-Band Dual Cell HSDPA Time Line Proposal and the scope for the work discussed. Multi-standard radio Base Station RF requirements for non-contiguous spectrum deployments [MSR_NC] Skeleton TR in R4-103159 was approved. Discussions for the terminologies, deployment scenarios made. Small technical improvements and enhancements LTE Receiver performance using AMC discussed. Other Work Items Framework for DL-Beam forming demodulation requirements and its simulation assumption agreed. Correction to band 20 UE to UE Co-existence table agreed. (TEI) CRs to introduce operating band of 18, 19, 20 and 21 and correction of band 11 for relay specifications agreed. (TEI)

Study items Extending 850 MHz TR 37.806 v0.3.0 approved (tdoc. 3195) TPs for the TR (eg. Reference sensitivities etc) agreed. Uplink Tx Diversity for HSPA Study on Measurement of Radiated Performance for MIMO and multi-antenna reception for HSPA and LTE terminals Contributions were not handled since the study is kept on hold by October. Study on RAN improvements for Machine-Type Communications No contribution in R4#56. Other Studies Three contributions for “in-device coexistence in ISM band” discussed.

New WI prop. Review Following 2 new WI proposals were presented. Due to lack of the meeting time, no particular Q&A took place. R4-102995 UE demodulation performance requirements under multiple-cell scenario for 1.28Mcps TDD CMCC, CATR To introducedemodulation performance requirements under multi-cell scenario for 1.28Mcps TDD UE. (Single-cell scenario has already been specified): E.C.D.: tbd R4-103418 Interfrequency detected set measurements for UMTS Nokia To define signaling and performance requirements on UE detected set reporting in cell-DCH for inter-frequency measurements as for intra-frequency case which has been used to overcome neighbor cell list size limitation of 32 cells. : E.C.D.: RAN#50 (Dec. 2010)

R4-AH#10-04 (October) (Topics and LS handling in the adhoc)

T-docs handling in the ad-hoc Agreement to be reached in the Adhoc: - Brief review and formal ratification on the agreements will take place at the following ordinary meeting, i.e. R4#57. LS handling: - All of the incoming LSs that are associated to the agenda (topics) will be handled in the corresponding sessions. - If necessary and appropriate, the ad-hoc sessions will create and approve outgoing LSs WITHOUT e-mail approval process. Urgent topic(s) "Spurious emission band UE co-existence requirements” in TS36.101 (Rel-8) for Band 7 would need update in order to be incorporated into European harmonized standards. Experts and interested parties are encouraged to participate the adhoc.

Subject in the AH: Rel.10 WIs (1/4) 1 Work Items [Rel.10 and beyond] 1.1 Carrier Aggregation for LTE [LTE_CA] 1.1.1 Core requirements [LTE_CA-Core] 1.1.1.1 Deployment scenarios / Co-existing studies 1.1.1.2 UE categories 1.1.1.3 RRM (Radio Resource Management) aspects 1.1.1.4 UE RF requirements 1.1.1.5 BS RF requirements 1.1.1.6 Other core requirements 1.2 Relays for LTE [LTE_Relay] 1.2.1 Core requirements [LTE_Relay-Core]

Subject in the AH: Rel.10 WIs (2/4) 1.3 Four carrier HSDPA [4C_HSDPA] 1.3.1 Core requirements [4C_HSDPA-Core] 1.4 1.28 Mcps TDD Home NodeB RF requirements [HNB_LCRTDD_RF] 1.4.1 Performance requirements [HNB_LCRTDD_RF-Perf] 1.5 1.28Mcps TDD Multi-carrier HSUPA [TDD_MC_HSUPA] 1.6 Performance Requirements for two-antenna 1.28Mcps TDD Type 1 and Type 2 UE receiver 1.6.1 Performance requirements [2ant_UE_LCR_TDD-Perf] 1.7 Enhanced Downlink Multiple Antenna Transmission for LTE 1.7.1 Core requirements [LTE_eDL_MIMO-Core] 1.8 Uplink Multiple Antenna Transmission for LTE 1.8.1 Core requirements [LTE_UL_MIMO-Core]

Subject in the AH: Rel.10 WIs (3/4) 1.9 Enhanced ICIC for non-CA based deployments of heterogeneous networks for LTE 1.9.1 Core requirements [ECIC_LTE-Core] 1.10 LTE Self Optimizing Networks (SON) enhancements 1.10.1 Core requirements [SONenh_LTE-Core] 1.11 Network-Based Positioning Support in LTE [LCS_LTE-NBPS] 1.12 Minimization of Drive Tests for E-UTRAN and UTRAN [MDT_UMTSLTE] 1.12.1 Core requirements [MDT_UMTSLTE-Core] 1.13 MIMO Testing in HSDPA [MIMO_HSDPA] 1.13.1 Perf. part: MIMO testing in HSDPA [MIMO_HSDPA-Perf]

Subject in the AH: Rel.10 WIs (4/4) 1.14 UE Over the Air (Antenna) conformance testing methodology- Laptop Mounted Equipment Free Space test [UEAnt_FSTest] 1.15 Reference sensitivity requirements in lower SNR regions [TEI]

Subject in the AH: New bands 2 New frequency bands [Release independent] 2.1 UMTS/LTE 3500 [RInImp8-UMTSLTE3500] 2.2 Add L-Band LTE for ATC of MSS in North America 2.2.1 Core requirements [L_Band_LTE_ATC_MSS-Core] 2.2 Add 2 GHz band LTE for ATC of MSS in North America 2.2.1 Core requirements [S_Band_LTE_ATC_MSS-Core] 2.3 Maintenance of LTE TDD in 2600MHz for USA 2.3.1 Core requirements [LTE_TDD_2600_US-Core] 2.3.2 Performance requirements [LTE_TDD_2600_US-Perf] 2.4 Expanded 1900 MHz Band for UTRA and LTE [E1900] 2.4.1 Core part: Expanded 1900 MHz Band for UTRA and LTE 2.4.2 Perf. part: Expanded 1900 MHz Band for UTRA and LTE

Subject in the AH: Study items / Urgent topics from RAN#49 3.1 Study on Extending 850 MHz [FS_e850] 3.2 Study on Measurement of Radiated Performance for MIMO and multi-antenna reception for HSPA and LTE terminals [FS_HSPA_LTE_measRP_MIMO_multi-antenna] 3.3 Study on RAN improvements for Machine-Type Communications [FS_NIMTC_RAN] 3.5 Signaling and procedure for interference avoidance for in-device coexistence (IMS band) [FS_SPIA_IDC] 4. Urgent topics from RAN#47* 4.1 UE additional spurious emission requirements (TS36.101, Rel-8 maintenance) 4.2 Others (Reserved for additional work) *Reserved for any urgent topics to be agreed in RAN#49.

Proposals of Meeting arrangement Beyond RAN4 #57 (Nov. 2010)

Possible meeting operations Opt. 1 Permanent Parallel sessions (chaired by R4 chair & Vice chairs) Two parallel sessions (Mon after morning coffee – Thu evening) Opt. 1.1 Maintenance sessions / Rel-10 and beyond 1. Up to Rel-9 Maintenances 2. Rel-10 and beyond, Study items Opt. 1.2 Core part / Performance part 1. Core part 2. Performance part Opt. 1.3 RF requirements / RRM 1. Radio Resource Managements (UMTS, LTE, LTE-A) 1. RF requirements for UE and BS, and others Opt. 2 Main meeting + Parallel adhoc sessions* *Temporary adhoc sessions (Parallel to main sessions) Opt. 3 Single stream main meeting + evening Ahs** **Temporary evening parallel AH sessions (NOT parallel to main) (i.e. As of today: Limited meeting time, limited progress)

Future meetings (Meeting calendars)

Meeting Calendar for 2010 Meeting Date Location Host RAN #49 14 – 17 Sep San Antonio, US NAF3 RAN4 AH #2010-04 11-15 Oct Xi’an, CN CATT RAN4#57 15 – 19 Nov Jacksonville, US RAN #50 7 – 10 Dec Istanbul, TR EF3

Meeting Calendar for 2011 Meeting Date Location Host [RAN4 AH #2011-01] 17-21 Jan Austin, TX, US NAF3 RAN4 #58 21 – 25 Feb Taipei, TW HTC RAN #51 15 - 18 Mar US [RAN4 AH #2011-02] 11 – 15 Apr Shanghai, CN ZTE RAN4#59 9 – 13 May Kobe, JP JF3 RAN #52 31 May - 3 Jun Bratislava, SK EF3 RAN4#60 22 – 26 Aug Athens, GR RAN #53 13 – 16 Sep t.b.d. RAN#60bis 10-14 Oct RAN4#61 14 – 18 Nov RAN #54 6 – 9 Dec [EU]

Thanks. 隆