Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
WF on BS MMSE-IRC receiver
Way forward on TBS determination in initial partial subframes
WF on Support of EBF/FD-MIMO Features in TM9
WF on MCOT and CWS for LBT priority classes
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
WF on SIB1bis Transmission
Way forward on RAN2 aspects of multiple PRB operations
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
Overview of open issues in
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
3GPP TSG-RAN WG4 Meeting NR#3 Nagoya, Japan, 18 – 21 Sep, 2017
Summary on Beam Recovery Mechanism
Way Forward on UE measurement definition and capability
Summary of SLS for RRM NTT DOCOMO
Offline Discussion on remaining details about RACH Procedure
WF on UL Transmission for Difficult Band Combinations in LTE-NR DC
Draft WF on single Tx switched UL
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
QCL configurations in above 6GHz and the necessary RS QCL linkeages
WF on NR spectrum NTT DOCOMO, INC. R
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
WF on single Tx switched UL
Proposals on remaining issues on PDCCH structure
Summary of offline discussion for PDCCH structure
Proposals on remaining issues on search space
Single Tx switched UL Qualcomm, Intel DRAFT RP GPP RAN #77
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
Way forward on UE EIS Spherical Coverage and Beam Correspondence
3GPP TSG RAN WG1 Meeting #90bis
Summary on Beam Recovery Mechanism
R : SRS Enhancements for LTE-A
R WF on channel raster Nokia,.
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
WF on transmit diversity for DFTsOFDM
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on Radio Link Monitoring in NR
Motorola Mobility, Lenovo, …
WF on UE mandatory channel bandwidth for NR bands
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Motivation for WI on "LTE-based V2X Services"
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
WF on 4Tx UL Codebook For CP-OFDM
WF on UL Beam Management
WF on UL Beam Management
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
WF on CB-group based retransmission
Explanation of draft TP IP Radio Network Development Department
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
WF on LTE-NR Coexistence
3GPP RAN1 status on NR-Unlicensed
Status of NR-U - Wi-Fi coexistence
Presentation transcript:

Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel] 3GPP TSG RAN WG1 Meeting #88 Athens, Greece, 13th - 17th Feb 2017 Agenda item 8.1.2.2.1 R1-1703557 WF on beam indication Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]

Background RAN1#86 Agreements: Beam management = a set of L1/L2 procedures to acquire and maintain a set of TRP(s) and/or UE beams that can be used for DL and UL transmission/reception, which include at least following aspects: Beam determination= for TRP(s) or UE to select of its own Tx/Rx beam(s). Beam measurement = for TRP(s) or UE to measure characteristics of received beamformed signals Beam reporting = for UE to report information of beamformed signal(s) based on beam measurement Beam sweeping = operation of covering a spatial area, with beams transmitted and/or received during a time interval in a predetermined way.

Background RAN1 NR ad hoc Agreements: For reception of DL control channel, support indication of spatial QCL assumption between an DL RS antenna port(s), and DL RS antenna port(s) for demodulation of DL control channel FFS: signaling method Note: Indication may not be needed for some cases: For reception of DL data channel, support indication of spatial QCL assumption between DL RS antenna port(s) and DMRS antenna port(s) of DL data channel FFS: which DL RS(s) to use for this purpose Different set of DMRS antenna port(s) for the DL data channel can be indicated as QCL with different set of RS antenna port(s) Option 1: Information indicating the RS antenna port(s) is indicated via DCI FFS: whether the information indicating the RS antenna port(s) will be assumed only for the scheduled “PDSCH” or until the next indication Option 2: Information indicating the RS antenna port(s) is indicated via MAC-CE, and will be assumed until the next indication Option 3: Information indicating the RS antenna port(s) is indicated via a combination of MAC CE and DCI At least one option is supported FFS: whether to support either or both options FFS: whether the information indicating the RS antenna port(s) for DMRS ports for DL control channel also applies to DMRS ports for DL data channel

Motivation MAC CE signalling can provide good reliable and reasonable latency and is suitable for beam indication for UE-specific PDCCH Note: Beam management for common PDCCH should not involving signalling The beam indication for PDSCH beam management needs to be dynamic in order to support transmission schemes, such as the dynamic TRP selection

Proposal 1 NR beam management should include the aspect of beam indication. The beam indication is defined as: Beam indication= for NW to inform UE of the Tx beam(s) related information.

Proposal 2 Beam indication based on DCI signalling (DL grant) is supported for unicast PDSCH reception The information indicating the RS antenna port(s) which is QCL-ed with DMRS antenna port(s) is assumed only for the scheduled PDSCH The information indicates the RS antenna port(s) which is QCL-ed with DMRS antenna port(s) from set of RS antenna port(s) FFS the indication is assumed only for the scheduled PDSCH or until next indication When the above information is included, FFS if there should be a scheduling offset FFS: How the set of RS antenna port(s) which is QCL-ed with DM-RS antenna port(s) is configured, e.g. RRC, or RRC+MAC CE FFS: Beam indication for receiving fall back unicast PDSCH FFS: Beam indication for receiving (UE-group) common PDSCH for RRC connected UE Candidate signalling methods for beam indication for a NR-PDCCH (i.e. configuration method to monitor NR-PDCCH) MAC CE signalling RRC signalling