Cabling Lengths and Timing

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
L1Calo Intro Cambridge Group, Dec 2008 Norman Gee.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
1 Status of receivers related activities Damien Prieur University of Pittsburgh 12/01/2010L1Calo Joint Meeting - Heidelberg.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting January.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Phases: to be 2 or to be B? The question of new timescales ● L1Calo phase 2 → phases B and C? ● Implications for design ● Example timescales ● Organising.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
L1Calo Databases ● Overview ● Recent Activitity ● To Do List ● Run types Murrough Landon 4 June 2007.
Online Database Developments ● Overview ● OKS database status and plans ● COOL database developments ● Validating calibrations ● Tools ● Summary Murrough.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Phase 2 L1Calo/Calo Interface ● Introduction ● Calo RODs ● Granularity and algorithms ● Calo-L1Calo links ● L1Calo design? ● Summary Murrough Landon 9.
Configuration and local monitoring
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
Online Database Work Overview Work needed for OKS database
Calibration Status Energy Calibration Stabilities/instabilities
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo Upgrade Phase 2 Introduction and timescales
L1Calo Requirements on the DPS
Run Control (and Other) Work
L1Calo Phase-1 architechure
L1Calo upgrade discussion
Online Database Status
BCTW calibration status and future
ATLAS L1Calo Phase2 Upgrade
Conditions Database Current conditions folders Proposed new folders
Online Software Status
Recent Online SW/DB Changes
Online SW, DB & Calibration
Nearly the end of a long story...
Online Software Status
Remaining Online SW Tasks
Level 1 (Calo) Databases
Online SW and Database Status
L1Calo Operations Summary
Online Software “To Do” List
The First-Level Trigger of ATLAS
Level-1 Calo Monitoring
Joint Meeting Wrap-up I’ve cheated Partially justified?
University of California Los Angeles
CPM plans: the short, the medium and the long
M. Krivda for the ALICE trigger project, University of Birmingham, UK
BESIII EMC electronics
Presentation transcript:

Cabling Lengths and Timing Murrough Landon 19 October 2007 Cabling Status LAr cable lengths Timing Strategy for Cosmics

Overview (Analogue cables)

Reminder of Cabling Status All analogue cables installed Connector screws to be replaced (at receiver/TCPP end) Connectivity tests to be completed Basic checks OK for LAr/Tile barrel All LVDS cables installed Last PPM crate connected up this week(?) Tests (endcaps) to be completed Some temporary Glink fibres installed Final fibres arriving this week (>3 month delay) Installation to be arranged (about 320 fibres)

LAr Cable Lengths (Delays) LAr long cables were tested with the Saclay tester Same system as used to test our short analogue cables Measures “length” (ie total signal delay), cross talk, etc Michel Mathieu and Alain LeCoguie have processed all the test results (for the long cables) Results in Excel spreadsheets (maybe DB?) Summary histograms Document destined for EDMS (in progress) Summary Barrel cables: 140-250ns (5-10 BC) Endcap cables: 240-320ns (9-13 BC) This is about 2 BC (10m) less than expected But it looks like TileCal cables may be as long as expected...

LAr Long Cables (Total Delays)

LAr Long Cables (Delay Dispersion)

How to Time in the Input Signals? To provide a trigger we need to align all the input signals from Tile, LAr barrel and endcaps PPM has provision for fine (ns) and coarse (BC) delays For physics (collisions) we need both of these For cosmics, we only need the timing to BC accuracy But with an offset around phi to coincide top/bottom towers How to do this before beam? Cosmic muons (~1Hz)are hard to see in TileCal and even harder in LAr Pulser signals are easy to see and can be at high rate But no correlation between Tile and LAr pulsers And possibly not between different LAr partitions?

Timing and Delay Overview

Cosmics Timing Procedure (1) Start with TileCal: laser pulser and cosmic trigger Use TileCal laser to pulse all TileCal towers Except for a couple used to provide the cosmic trigger Get L1A via standard CTP route Should have the same trigger timing as a real cosmic Keep readout pointers fixed (whole L1Calo system) Set real time delay at PPMs to align TileCal signals in the fixed readout window Add extra delay to cope with endcap towers being later Status: this was done last week Results need checking and refining Not using PPM readout pointer scan SW to update DB as (at the moment) that aligns the readout pointers not the real time delays

Cosmics Timing Procedure (2) Use L1Calo to trigger on TileCal laser pulses Should now get same L1Calo L1A timing for any tower Set up suitable trigger menu (tau) L1Calo trigger needs an RoI maximum So rely on variations in energy seen by different towers Or disable 3 in 4 towers and cycle through them all Adjust delay of L1Calo L1A at the CTP to match that from the TileCal cosmic trigger Hopefully we dont need to change the TileCal cosmic trigger timing as that would affect everyone Status: tried to send L1A to CTP But problems with CMM firmware (intercrate link) Firmware needs fixing (also cp0 problem?) Meanwhile be less ambitious and try using just one CP crate?

Cosmics Timing Procedure (3) Set LAr timings using LAr pulser and L1Calo trigger Keep readout pointer window fixed Keep L1Calo L1A timing at CTP fixed Send LAr pulses to get L1Calo trigger Typically from the earliest tower until all are aligned Set real time delay of LAr signals at PPM inputs so they are aligned in the readout window Now have Tile and LAr signals aligned with each other Might see the occasional large cosmic shower in LAr? Chaouki sees them in the receiver monitor system Provide some kind of cosmic trigger for weekend runs? Status: to be done Try this during M5 exercise As with step 2, needs CMM to provide L1A to CTP