Performance of Slide-jack tuner in STF-2 Cryomodule

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Motors/actuators SSR1 (325MHz) slow/coarse tuners Piezoelectric actuators for SSR1 (325MHz) fine/fast tuner Presented by Yuriy Pischalnikov 02/06/2012.
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
2014/3/25TTC Meeting Radiation measurement and comparison between VT/CM tests at KEK-STF Kirk.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
Tuner & LLRF of ILC Sun YI (孙毅)、 Wang Guangwei (王光伟) Lin Haiying (林海英)、 Qiu Feng (邱丰) Dec.7, th workshop of KEK/IHEP on ILC.
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
ALCPG11 1 Comparison of Tuner Performance in S1-G Cryomodule Rocco Paparella, on behalf of S1-Global team.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
20 October 2010 – C.Pagani IWLC S1-Global Tuner Performance Study Carlo Pagani, on behalf of INFN Milan team.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov for FNAL Tuner team.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Recent Result for the STF-2 Cryomodule Operation
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
at STFC Daresbury laboratory
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
S1-G for TTC meeting Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
S1-G cryomodule assembly status
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
XFEL Tuner system non-conformities Detected At saclay
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Yamamoto WG3: ML-SCRF Parallel Session,
High Gradient Cavities: Cost and Operational Considerations
ESS – RF checks up to cavity operation readiness in tunnel
Progress in Asia Hitoshi Hayano,KEK,
Tuner system for CEPC MI Zhenghui 2016/09/14
KEK injector cryomodule
5K Shield Study & HL Measurements
Construction and First Coo-down Test of cERL Injector Cryomodule
TTC meeting, Milano Global Design Effort
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Cavity Degradation Experience at S1-Global
Presentation transcript:

Performance of Slide-jack tuner in STF-2 Cryomodule w/ Piezo Performance of Slide-jack tuner in STF-2 Cryomodule Dec/3/2015 WG4 in TTC Meeting 2015 @SLAC Kirk

Specification of Tuner/Piezo in STF-2 Tuner type Slide-jack # of Tuner/Piezo 12 Attachment Position Center (String 1, 3) / End (String 2) Frequency range ~530kHz Cavity expansion ~2.2mm Piezo Max. voltage 1000V (500V@opr.) >200Hz Tuner Piezo center type end type Dec/3/2015 WG4 in TTC Meeting 2015 @SLAC

Cavity/Tuner combination in CM1/CM2a Module CM1 CM2a String # 1 2 3 Cavity # 4 5 6 7 8 9 10 11 12 Cavity name MHI-14 MHI-15 MHI-17 MHI-18 MHI-19 MHI-20 MHI-21 MHI-22 MHI-24 MHI-23 MHI-25 MHI-26 Tuner type center End Piezo common type MHI-14 MHI-15 MHI-17 MHI-18 MHI-19 MHI-20 MHI-21 MHI-22 MHI-24 MHI-23 MHI-25 MHI-26 BPM/Quadrupole Cavity string 1 Cavity string 2 Cavity string 3 Dec/3/2015 WG4 in TTC Meeting 2015 @SLAC

Inspection/Assembly/Drive check Incoming inspection  assembly work  Drive check/measurement Dec/3/2015 WG4 in TTC Meeting 2015 @SLAC

Every tuner enables cavity to set 1.3GHz exactly. Tuner drive test at 2K Every tuner enables cavity to set 1.3GHz exactly. Dec/3/2015 WG4 in TTC Meeting 2015 @SLAC

Piezo drive test at 2K 500V 0V ! 500V 0V Piezo #4 did not work properly due to discharge trouble. The other eleven piezo worked very well. Dec/3/2015 WG4 in TTC Meeting 2015 @SLAC

Replacement of Piezo in Cryomodule After this trouble, we replaced Piezo. Dec/3/2015 WG4 in TTC Meeting 2015 @SLAC