Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
The hand-held unit doesn‘t work properly Fault analysis of MANKAR-CARRY No fluid running out of the atomiser The switch valve is defective The filter is.
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
This task covers: a. Removal b. Cleaning and Inspection c. Installation INITIAL SETUP: Equipment Condition  Front axle spindle removed. Materials/Parts.
ADVANCED SIMULATION OF ULTRASONIC INSPECTION OF WELDS USING DYNAMIC RAY TRACING Audrey GARDAHAUT (1), Karim JEZZINE (1), Didier CASSEREAU (2), Nicolas.
SAISINUC SOFTWARE ENVIRONMENT Data tools: import, check, export, use DDEP , October 8-10 Marie-Martine Bé, Charlène Bisch, Christophe Dulieu, Mark.
ENDORSING RADIATION PROTECTION IN ACADEMIA AND UNIVERSITY HOSPITALS, THE INTERNATIONAL STANDARDS Egypte workshop | Akli HAMMADI | PAGE 1 CEA | 10 AVRIL.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Refurbished Booster RF John Reid October 24, 2012.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Manufacturing contracts for RFQ
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
SERVICE TRAINING EXPERT ALPHASTAR 1132 © MAO-SE-TC 1132_SE_EX_Handout_EN_12_  Collision protection switch  Collision protection switch retrofit.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
1 & 2 JUNE 2015 – LLRF – BEAM DYNAMICS WORKSHOP URIOT Didier What is taken into account in simulations LLRF – Beam dynamics Workshop.
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Chapter 16 GMAW and FCAW: Equipment Assembly and Adjustment Miller Electric Mfg. Co.
Joël Surget / Pierre-Francois Honoré
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Strategy and Status of Reference Cavities for European XFEL
S1G Experiment Schedule Plan
A SUBCELL BASED INTERFACE RECONSTRUCTION METHOD TO DEAL WITH FILAMENTS
Medium beta cryomodule demonstrator M-ECCTD
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
Documentation (XFEL Naming convention, uploading…)
Definition of work flow for string DESY Example on critical operation
X-FEL linear accelerator
Acceptance criteria for cleanroom infrastructure
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
Brake System Problem Diagnosis & ABS Service Tips
Performance of Slide-jack tuner in STF-2 Cryomodule
WP 3 coordination meeting Saclay May 2008
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
Main Coupler R&D at DESY
MID: A MetaCASE Tool for a Better Reuse of Visual Notations
Lubricate Shoe Support Pads
Retreatment of Superconducting Cavities for the European XFEL
COSI Evaluation of non-nuclear material balance with the COSI software
3rd Workshop on dynamic fuel cycle Timothée Kooyman, DEN,DR,SPRC,LE2C
F. Peauger (mainly for CM components)
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Incoming inspection of the cavities at saclay
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Trinity Mexico Boring Bar Repair Report
Quality assurance and Quality control organisation
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
CEA: Status of CEA Activities on the SRF cavities and cryomodules
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

XFEL Tuner system non-conformities Detected At saclay 2015 XFEL Tuner system non-conformities Detected At saclay WG Tuner TTC 2015 @ SLAC / Thierry Trublet – CEA Saclay

XFEL Tuner system non-conformities detected at Saclay– TTC 2015 @ SLAC Introduction In the context of the XFEL project, CEA is in charge of assembling the 100 linac cryomodules 72 cryomodules have been delivered up until now The XM100 will be delivered at the end of April 2016 CEA has contracted with ALSYOM for assembly 600 tuner systems have already been assembled XFEL Tuner system non-conformities detected at Saclay– TTC 2015 @ SLAC

Tuner Incoming inspection and preparation Tuner systems are delivered pre-assembled in plastic bags The incoming inspection is performed when the store keeper prepares the set for the work station. He partially disassembles the set XFEL Tuner system non-conformities detected at Saclay– TTC 2015 @ SLAC

Non-conformities detected during incoming inspection Part repair return discard missing Hinge axle 38   3 Piezo axle 40 1 12 Framework Circlip Ø8 2 Ball bearing Ø24 37 Tuner mechanics Silver coated screws 469 117 Pressure screw Piezo system 8 Frequency tuner drive unit normal 4 XFEL Tuner system non-conformities detected at Saclay– TTC 2015 @ SLAC

Non-Conformities repaired at Saclay Ball bearings seized => Repaired by polishing with abrasive cloth Oxidation on silver coated screws => First we used ultrasonic cleaning => Later we received an exemption to use as is Adjustment issue for bearing assembly => Repaired by polishing with abrasive cloth Circlip groove not deep enough => Returned to DESY XFEL Tuner system non-conformities detected at Saclay– TTC 2015 @ SLAC

Non-conformities Detected during Assembly One piezo axle seized => repaired at Saclay Piezos did not charge correctly (in shipment area) => used as is The result of the motor & piezo test on cavity 1 was not correct. The reset did not work for piezo 2.  Turn1 : 1.398v (piezo1) 0.921v (piezo2)  Turn2 : 3.015v (piezo1) 1.511v (piezo2)  reset : -0.011v (piezo1) -1.364v (piezo2) Piezo charged negatively (x5) => Used as is but cabling on flange reversed During LVDT(linear variable differential transformer) check, piezo 2 in Pos.6 has a negative charge instead of positive. After 1 turn : -0,765 V After 2 turns : -1,540 V XFEL Tuner system non-conformities detected at Saclay– TTC 2015 @ SLAC

Non-conformities in assembly Cable damaged during piezo system installation (replaced) Tuner mechanism parallelism defect (used as is) Motor stop issue (the motor changed direction by itself…) => The assembly procedure was changed. The problem was due to the location of the limit switch Problem at DESY: Polarization was reversed on all the piezo 2’s of XM67. => No explanation was found (between DESY/CEA/INFN) All the checks done at Saclay during assembly were OK XFEL Tuner system non-conformities detected at Saclay– TTC 2015 @ SLAC

Production des cryomodules XFEL - Journées AFF-CSS @ Aussois 2015 Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 xx xx | F. +33 (0)1 69 08 99 89 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019 DSM Irfu DIR Production des cryomodules XFEL - Journées AFF-CSS @ Aussois 2015