Job Performance Requirement 7-11

Slides:



Advertisements
Similar presentations
DISC BRAKE SERVICE Review parts & operation of disc brakes
Advertisements

SKA-Pak Plus Mobile Air Cart Con-Space Link
Dennis Fire Appliances Operations & use. PTO Step 1 Move slide cover towards the drivers seat to lock out the gearbox Step 2 Select drive on the gear.
2 Fire Fighter Qualifications and Safety Skill Drills.
Scott 4.5 Introductory SCBA.
AS100 Installation Air Tight Solutions The only solution AS100 Valve Stem Adapter Small O-ringLarge O-ring Standard Brass Valve Stem If you purchased your.
New SCBA Brackets Coming to a fire engine near you.
Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
SAFE PROPANE TORCH USAGE
ResQmax Line Deployment Kit -ResQmax Launcher- 5 nozzle protectors -2 Streamline Projectiles- O-ring kit -500’ 3mm line with container- Corrosion block.
Model DISASSEMBLY AND ASSEMBLY 1- Disassembly To replace the spring (11), or clean any of the internal components of the valve, proceed in the.
High Pressure Lifting Bags
Paratech Air Struts SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Los Alamos Fire Department
1 Fire Fighter Qualifications and Safety Skill Drills 2.
1 Skill Drill 2-7 Donning a Face Piece Step 1: Fully extend the straps on the face piece. Step 2: Place your chin in the chin pocket. 2 Step 3: Fit the.
PERSONAL PROTECTIVE EQUIPMENT State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
Job Performance Requirement Modified Gasner Bar Pack.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS DISC BRAKE OVERHAUL.
Valves.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
Components/purpose (Terminology) Engine Flywheel – keeps the engine running smoothly but also provides a flat smooth surface that the Centre Plate is pushed.
Fire Fighter Safety SCBA CHANGE/REFILL
Job Performance Requirement 7-3 Donning SCBA  Seat- Mounted Apparatus.
Gauge Installation and Removal Procedures By: Inmer Amaya.
Job Performance Requirement 7-1 Donning SCBA  Over the Head Method.
Chapter 18 The Clutch System.
Cooling Sytem Motorcycle Engineering (021)
”-10”.
All Models of KMDSI Helmets SIDE BLOCK / DEMAND REGULATOR
½”-10”.
14 Refrigerant Recovery, Recycling, and Recharging.
Manual Drivetrains and Axles
Teknik Kendaraan Ringan
Super Flow 450 Regulator.
DCDA4A 21/2” – 6”.
805Y, 805YD 21/2”-10”.
Engine Removal, Disassembly, Inspection, and In-Chassis Repairs
Shutting Down the Cutting Outfit
3000CIV 21/2”-10”.
½”-10”.
806, 806YD 3”-10”.
2 Fire Fighter Safety.
2 Fire Fighter Safety.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
5000SS 21/2”- 6”.
Job Performance Requirement 10-15
4D-100, 4D-600 2½”- 10”.
Job Performance Requirement 10-31
LF856 2½”-10”.
909 21/2”-10”.
DC4A 21/2” – 6”.
709DCDA 2½ ”-10”.
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Job Performance Requirement 10-9
Valve stem “gag” mechanism
C400, C400N, C400Z 21/2”-10”.
2000CIV 2½ ”-10”.
4000CIV 21/2”-10”.
950DA 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
Job Performance Requirement 10-33
DC4AN 2½” – 6”.
450DA 4”-10”.
909 RPDA 21/2”-10”.
709 3/4”-2”.
709 2½ ”-10”.
Job Performance Requirement 10-32
Automotive Engines Theory and Servicing
Presentation transcript:

Job Performance Requirement 7-11 Cylinder Replacement Procedure

A Place the SCBA unit on the ground with the cylinder valve toward you.

B Disconnect the high-pressure coupling from the cylinder. If the knob is difficult to turn, the high-pressure line may still be pressurized.

empty cylinder down out of the harness C Release the cylinder clamp or locking mechanism used on the unit and slide the empty cylinder down out of the harness back plate assembly.

D Inspect the O-ring on the seat of the high-pressure hose for any damage, scratches, or foreign matter. JPR 7-11D