Bidder’s conference – 21st May 2013 IT3937/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems for SR4 Facility Bidder’s conference – 21st May 2013 Y. Body / EN-CV
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
INTRODUCTION: CERN
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
INTRODUCTION: SR4 Facility
INTRODUCTION: SR4 Facility
INTRODUCTION: SR4 Facility
INTRODUCTION: SR4 Facility
INTRODUCTION: SR4 Facility – Former ventilation system
INTRODUCTION: SR4 Facility – Former ventilation system Cut Top view
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
NEW VENTILATION SYSTEM Two AHUs: one in R-401 and one in R-404 R-403 Alcove used for decompression R-401 R-404 R-403
R-401, R-404 alcoves NEW VENTILATION SYSTEM Air Handling Unit Sepcial shape part between AHU and mixing chamber including the air tight access door Return air grille (UQGN) Fresh air intake (UQCF) Fresh air damper (UVUM) Return air damper (UVUM) Pre-filtration (UFPZ)
R-403 alcove NEW VENTILATION SYSTEM Retrun air exhaust (UQCF) Return air grille (UQGN) Return air dampers (UVUM) Openings closure
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
(same principle for UIAC-00076) TENDER DOCUMENTS: Technical Specification – Items supplied by CERN CERN 400Vac CERN main power supply (same principle for UIAC-00076) Control sofware done by CERN based on Contractor’s function/malfunction analysis, I/O list, PID and electrical diagrams
TENDER DOCUMENTS: Technical Specification – Design criteria and conditions
TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations Halogen forbiden AHUs: total amount of halogeneted material to be indicated in the tender
TENDER DOCUMENTS: Technical Specification – Responsibility for the Design
TENDER DOCUMENTS: Technical Specification – Documentation
TENDER DOCUMENTS: Technical Specification – Documentation
TENDER DOCUMENTS: Technical Specification – Documentation The Contractor shall use a tool developed by CERN (as per section 2.11.4)
The software can be downloaded at TENDER DOCUMENTS: Technical Specification – Documentation and CMMS tool The software can be downloaded at https://edms.cern.ch/document/1245858/1
Example of a Part (fan) in Parts-Admin software TENDER DOCUMENTS: Technical Specification – Documentation and CMMS tool Example of a Part (fan) in Parts-Admin software CMMS Class code: Parts are grouped in large groups (Valves for example). Each group is a Class and has a defined code. CERN has a list of valid Classes. Each Category has a code. CMMS Category code: Classes are divided into smaller groups (Butterfly valves for example). These groups are called Categories. CERN has a list of valid Categories. Each Category has a code
TENDER DOCUMENTS: Technical Specification – Delivery schedule
TENDER DOCUMENTS: Technical Specification – Tests 1. I/O testing with basic PLC standard software suite (done by the Contractor) Power available in the cubicles and all equipment cabled to the PLCs Supplier able to charge the basic PLC configuration and test all I/Os from within the software 2. I/O testing with CERN software (done by CERN with presence of Contractor) Test report from phase one validated by CERN Setup of instrumentation is finished (scaling of analog probes, pressostats, …) All hardware responding to commands Contractor able to force all I/Os electrically 3. Functional testing with CERN software (done by CERN with presence of Contractor) All hardware and instrumentation operating according to specifications (failsafe positions on dampers, electrical equipment protections all working, etc) Ability to run the units and test regulation loops 4. Commissioning (done by CERN with the presence of Contractor) Installation able to work at the design envelope conditions (nominal flow and power, …)
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
TENDER DOCUMENTS: Annex 1 – Panel of the AHUs
TENDER DOCUMENTS: Annex 1 – Measuring section
TENDER DOCUMENTS: Annex 1 – Electrical heaters
Copper pipe with a thickness of 0.89 mm allowed TENDER DOCUMENTS: Annex 1 – Chilled water coils Copper pipe with a thickness of 0.89 mm allowed
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
TENDER DOCUMENTS: Annex 2 – Instrumentation
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
TENDER DOCUMENTS: Annex 3 – Electricity
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
TENDER DOCUMENTS: Annex 4 – Identification
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
As per section 4.7.1 of the Technical Specification TENDER DOCUMENTS: Annex 5 – Tests and Inspection performed on Contractor’s Premises As per section 4.7.1 of the Technical Specification
INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE
TENDER DOCUMENTS: Annex 6 – DQE
TENDER DOCUMENTS: Annex 6 – DQE - update
Thanks for your attention!