Bidder’s conference – 21st May 2013

Slides:



Advertisements
Similar presentations
Series L Air conditioners for Laboratories.
Advertisements

Heating, Ventilating, and Air-Conditioning
Heating, Ventilating, and Air-Conditioning
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
RETROCOMMISSIONING AIR HANDLING SYSTEMS
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
MECHANICAL ASPECTS OF MICHIGAN UNIFORM ENERGY CODE MIAM DOHERTY INN CLAIRE, MICHIGAN MARK RILEY.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
HVACR116 – Trade Skills Mechanical Drawings.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Settings & Adjustments. Settings & Adjustments.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
World Health Organization
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
World Health Organization
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
IT-4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the New Building 107 Technical Specification M. Battistin, M. Nonis /
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
MEDICIS Safety Alarms Systems
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
IT-4189 Supply and installation of a cryogenic distribution system
ZONING (see section 17.0) Zoning alternatives Constant Volume (CV)
Session 10 –roundtable – Labs and Controls Systems
Heating, Ventilating, and Air Conditioning
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
CEDAR Detector Ventilation System Review
COOLING & VENTILATION INFRASTRUCTURE
East Area Cooling & Ventilation Status
Status of the cryogenic system for B180
Low temperature chiller Market Survey
Lecture Objectives: Finish with HVAC systems
9/18/2018 Bids CONTRACTING Khamis…..
Heating, Ventilating, and Air-Conditioning
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Documentation Chris Scanlon and Ritendra Bhattacharya
Testing Plan and Status
Receiving Inspection on incoming goods
PSS verification and validation
Objective Revie the Cooling Cycle Learn about air distribution systems
Atefeh Sadeghzadeh Control engineer – Target safety and control
Presentation transcript:

Bidder’s conference – 21st May 2013 IT3937/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems for SR4 Facility Bidder’s conference – 21st May 2013 Y. Body / EN-CV

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

INTRODUCTION: CERN

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

INTRODUCTION: SR4 Facility

INTRODUCTION: SR4 Facility

INTRODUCTION: SR4 Facility

INTRODUCTION: SR4 Facility

INTRODUCTION: SR4 Facility – Former ventilation system

INTRODUCTION: SR4 Facility – Former ventilation system Cut Top view

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

NEW VENTILATION SYSTEM Two AHUs: one in R-401 and one in R-404 R-403 Alcove used for decompression R-401 R-404 R-403

R-401, R-404 alcoves NEW VENTILATION SYSTEM Air Handling Unit Sepcial shape part between AHU and mixing chamber including the air tight access door Return air grille (UQGN) Fresh air intake (UQCF) Fresh air damper (UVUM) Return air damper (UVUM) Pre-filtration (UFPZ)

R-403 alcove NEW VENTILATION SYSTEM Retrun air exhaust (UQCF) Return air grille (UQGN) Return air dampers (UVUM) Openings closure

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

(same principle for UIAC-00076) TENDER DOCUMENTS: Technical Specification – Items supplied by CERN CERN 400Vac CERN main power supply (same principle for UIAC-00076) Control sofware done by CERN based on Contractor’s function/malfunction analysis, I/O list, PID and electrical diagrams

TENDER DOCUMENTS: Technical Specification – Design criteria and conditions

TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations Halogen forbiden AHUs: total amount of halogeneted material to be indicated in the tender

TENDER DOCUMENTS: Technical Specification – Responsibility for the Design

TENDER DOCUMENTS: Technical Specification – Documentation

TENDER DOCUMENTS: Technical Specification – Documentation

TENDER DOCUMENTS: Technical Specification – Documentation The Contractor shall use a tool developed by CERN (as per section 2.11.4)

The software can be downloaded at TENDER DOCUMENTS: Technical Specification – Documentation and CMMS tool The software can be downloaded at https://edms.cern.ch/document/1245858/1

Example of a Part (fan) in Parts-Admin software TENDER DOCUMENTS: Technical Specification – Documentation and CMMS tool Example of a Part (fan) in Parts-Admin software CMMS Class code: Parts are grouped in large groups (Valves for example). Each group is a Class and has a defined code. CERN has a list of valid Classes. Each Category has a code. CMMS Category code: Classes are divided into smaller groups (Butterfly valves for example). These groups are called Categories. CERN has a list of valid Categories. Each Category has a code

TENDER DOCUMENTS: Technical Specification – Delivery schedule

TENDER DOCUMENTS: Technical Specification – Tests 1. I/O testing with basic PLC standard software suite (done by the Contractor) Power available in the cubicles and all equipment cabled to the PLCs Supplier able to charge the basic PLC configuration and test all I/Os from within the software   2. I/O testing with CERN software (done by CERN with presence of Contractor) Test report from phase one validated by CERN Setup of instrumentation is finished (scaling of analog probes, pressostats, …) All hardware responding to commands Contractor able to force all I/Os electrically 3. Functional testing with CERN software (done by CERN with presence of Contractor) All hardware and instrumentation operating according to specifications (failsafe positions on dampers, electrical equipment protections all working, etc) Ability to run the units and test regulation loops 4. Commissioning (done by CERN with the presence of Contractor) Installation able to work at the design envelope conditions (nominal flow and power, …)

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

TENDER DOCUMENTS: Annex 1 – Panel of the AHUs

TENDER DOCUMENTS: Annex 1 – Measuring section

TENDER DOCUMENTS: Annex 1 – Electrical heaters

Copper pipe with a thickness of 0.89 mm allowed TENDER DOCUMENTS: Annex 1 – Chilled water coils Copper pipe with a thickness of 0.89 mm allowed

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

TENDER DOCUMENTS: Annex 2 – Instrumentation

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

TENDER DOCUMENTS: Annex 3 – Electricity

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

TENDER DOCUMENTS: Annex 4 – Identification

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

As per section 4.7.1 of the Technical Specification TENDER DOCUMENTS: Annex 5 – Tests and Inspection performed on Contractor’s Premises As per section 4.7.1 of the Technical Specification

INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS PLAN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE

TENDER DOCUMENTS: Annex 6 – DQE

TENDER DOCUMENTS: Annex 6 – DQE - update

Thanks for your attention!