Handling new SI/WI proposals

Slides:



Advertisements
Similar presentations
WF on PBCH Coverage Enhancement
Advertisements

Zamtel Call Centre Tender PreBid Workshop 10 th March 2014.
1. 2 NHS PS - Who Are We?  A new Ltd Company - launched April 2013  100% owned by the Secretary of State for Health  3,535 assets, valued at around.
WF on BS MMSE-IRC receiver
Copyright © 2002 Open Mobile Alliance Ltd. All Rights Reserved. Open Mobile Alliance Open Approach to the Mobile Industry Copyright © 2002 Open Mobile.
R4-15XXXX Way forward on coexistence evaluation methodology for NB-IOT in-band and guard band operation Qualcomm, Huawei, Nokia Networks, ZTE, Intel, Ericsson,
WF on Support of EBF/FD-MIMO Features in TM9
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
20 September 2004 C R4 0 Proposed Process for TSG-C Work Items Source Alberto Gutierrez Motorola
3GPP TSG RAN WG2 meeting #92 Nanjing, China 23-27, May 2016 R
National Junior Honor Society Leadership Positions
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
1 Presentation Title 3GPP WORK ON 5G Presenter Erik Guttman Session
Presentation to the Portfolio Committee on Communications on the:
Agreements and discussion points on Access Control
Summary of SLS for RRM NTT DOCOMO
NR workload management
5G considerations in Russia
3GPP TSG-RAN WG4 Meeting #84bis
MAC calibration results comparison
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
WF on new NR CG sequences for PUCCH
Initial workplan on NR spectrum
Wayforward on Rel-15 NR Study Items
Plotting the course to 5G – Leading Carrier 5G
WF on NR spectrum NTT DOCOMO, INC. R
Summary of proposals on CBG-based retransmission
ITU-R Ad-Hoc Contact person
Summary of offline discussion for PDCCH structure
3GPP RAN1 #90 meeting summary on LAA Enhancements
Way forward on UE EIS Spherical Coverage and Beam Correspondence
Way forward on power sharing for LTE-NR NSA operation
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
R WF on channel raster Nokia,.
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
Intel Corporation, Apple
Way forward on DL ACLR&ACS for WP5D LS
WF on beam reporting CATT, Intel R1-17xxxxx
R WF on channel raster Nokia,.
TSG-RAN WG1 Meeting #60bis
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Motivation for WI on "LTE-based V2X Services"
Way Forward on Coexistence Evaluation Methodologies for LAA
RP Motivation for New WI (RP ): NB-LTE for Low Complexity Radio Access Network for Cellular Internet of Things Alcatel-Lucent, Alcatel-Lucent.
Explanation of draft TP IP Radio Network Development Department
Discussion and Way Forward NB IoT UE Differentiation
Erik Guttman, Chairman of 3GPP TSG SA Samsung Electronics
SAE C-V2X Technical Committee
and LMAP liaison Document Number: IEEE R0
Organizational Chart as of February 2017
Roger Marks (Huawei) capable 5 November 2018
Roger Marks (Huawei) May 2018
WF on LTE-NR Coexistence
Summary of workshop on NR unlicensed
Roger Marks (Huawei) capable 12 September 2018
IEEE TGw September Agenda
Roger Marks (Huawei) capable 16 January 2019
Regulation for Smart Grids
Evaluating Progress Towards Achieving Targets Identified in the Communication on Halting the Loss of Biodiversity to 2010 and Beyond Member State Contribution.
Roger Marks (Huawei) capable 13 March 2019
Roger Marks (Huawei) capable 9 January 2019
WNG SC Agenda Date: Authors: January 2018 July 2013
Month Year doc.: IEEE yy/xxxxr0 May 2019
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
on the overall 5G-NR eMBB workplan
Pictograms.
Overview of 3GPP and 5G standards
Month Year doc.: IEEE yy/xxxxr0 May 2019
Presentation transcript:

Handling new SI/WI proposals Source: RAN Chairman

General Principles Primary focus to be put on ensuring proper Objectives&Scope that correspond to true market needs Real TU estimates to be included that are ‘signed off’ by the lead WG Chairman Proposed new WI/SI shall omit Rapporteur information, the Supporting Companies information, the lead WG information Lead WG information and Supporting Companies to be filled in upon full stabilization of the Objectives&Scope Rapporteur information to be filled in upon approval of WI/SI Role of and expectation towards the eventual Rapporteur To serve as a neutral facilitator of the work Not represent any company proposal or position for the WI/SI Organize end ensure necessary cross-WG correspondence Accurate and honest status reporting (open issues, TUs, etc…) Strictly restrict the number of Rapporteurs for a WI/SI to a single person  Rapporteurship does not in any way represent a company’s leadership or the amount of innovation of a company for a certain WI/SI!

Next Steps for Rel16 proposals All WI/SI proposals to comply with General Principles Work areas with multiple proposals at RAN#78 to be consolidated led by a Moderator over the RAN_Drafts exploder: MIMO (NR & LTE), moderator: Samsung NR Voice (including fallback), moderator: Huawei IoT / eMTC evolution (LTE & NR), moderator: Ericsson Broadcast (NR & LTE), moderator: Qualcomm NR V2X, moderator: Vodafone NR Positioning, moderator: Intel NR flexible duplex, moderator: LG NR Power Consumption, moderator: CATT (for the standalone aspects start after March) NR URLLC Enhancements, moderator: Nokia (to be started after March) NR Mobility, moderator: Intel (to be started after March) Other miscellaneous NR enhancements/leftovers, moderator: Docomo Note: individual SI/WI is needed for each individual item, i.e. no umbrella WI/SI! Other proposals are also encouraged to be further developed on the RAN_Drafts exploder Next checkpoint: RAN#79 (March/2018) General target for approval: RAN#80 (June/2018)

Practical Steps until June/2018 Both the individual as well as the consolidated WI/SI proposals are encouraged to be further developed over the RAN_Drafts reflector Role of the Moderator for consolidating the new work areas: To serve as a neutral facilitator for the consolidation of the new work area into SI(s) and WI(s) Not represent any company proposal or position during consolidation  Being a Moderator does not in any way represent a company’s leadership or the amount of innovation of a company for the work area Goals for moderation: Determination of a core set of objectives carrying support of a wide majority Capturing other objectives with scattered support in [] Determining TUs for all potential objectives Next checkpoint at RAN#79 (March/2018): moderator to submit summaries where applicable RAN#80 to approve a set of new SIs/WIs at RAN#80 (June/2018) This set will be a subset of all consolidated and individual proposals

Thank you!