Top 10 Considerations for Implementing a Parking Guidance System James Maglothin, P.E., PMP Neill Hurley, CAPP Walker Parking Consultants June 29, 2015
Agenda PGS Industry Background Types of PGS Defining the Success of Your PGS Top 10 Design Considerations
PGS Industry Background Recent History of the PGS Industry Present-Day PGS Trends and Activity
Types of PGS Types of PGS Multi-facility PGS By Facility By Level By Zone By Space Multi-facility PGS
Defining the Success of Your PGS How is success defined? Set measurable goals Communicate goals to stakeholders Assess performance against goals How does design influence success? Achieves goals Does not drive up costs unnecessarily
Top 10 PGS Design Considerations Top 10 Design Considerations – Each element has cost and operational impacts Customer Service Features and Functionalities Operational Features and Functionalities Web Site and Mobile Application Interfaces Detection Technology Sensor and Indicator Placement Infrastructure Procurement Contractor Vetting Installation Commissioning
Customer Service Features Dynamic Signage
Customer Service Features Find Your Vehicle
Operational Features Flexible Parking Space Assignments Premium Parking Areas Time Violation Alerts Citation Officer Notification License Plate Hotlist Reporting Automatic Dimming/Power Off Integration with Facility Lighting System
Website and Mobile App Interfaces Browser-Based vs. Client-Based Applications Broadcast Real-Time Space Availability Find Most Convenient Parking for Destination
Detection Technology Inductive Loops Ultrasonic Video Analytics License Plate Recognition Infrared Laser
Sensor and Indicator Placement Facility Count Level Count By Zone By Individual Space
Infrastructure Embedded Conduit Surface Mounted Conduit Sensor and Signage Communication
Procurement Functional Specifications RFP vs. Bid Process Include a Pre-Proposal Conference/Site Walk Value Based vs. Price Based Selection
Contractor Vetting Competitive Landscape US vs. Worldwide Presence Installations of Similar Size and Complexity Components Client References Consider system cost vs. risk
Installation New Construction Existing Construction
Commissioning Measure Performance Against Clearly Defined Metrics Software Acceptance Tests Device Acceptance Tests System Acceptance Tests
Thank You ? Questions