TBL quadrupole mover prototype development

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Efforts By : Ankit Puri Project Supervisor : Fangpo He.
Experience of the Spanish collaboration with TBL F. Toral on behalf of the Spanish Collaboration with TBL CERN, CTF3 Collaboration Technical Meeting, 6/5/2010.
Mechatronics Linear Motors Advantages : Precise High forces Few parts video Disadvantages : Limited stroke Space occupancy Cost Complex to build/assemble.
MECHANICAL DESIGNS. What is mechanical design? All the mechanical hardware used in the machine is called mechanical design. Precision machines are essential.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
DESIGN OF A TESTING MACHINE FOR MICRO-DEVICES Follow up to Clément Gabry’s master thesis on Structural Resistance of Silicon Membranes 1 12/10/2014CERN.
Scanner – part II. Anna Micherdzinska Qweak Collaboration Meeting, TRIUMF, 24 July, 2007 Outline 1.Design constraints 2.What we bought a.Parameters b.Signal.
1. Invent Yourself: PhysicsIYNT 2015, Belgrade, CROATIA 1. Invent Yourself: Physics Precise Weighting Tibor Basletić Požar.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
MOTION CONTROL ISAT 303 Typically involves accurate control of distance, speed (angular velocity or both.
Measurement report of Boostec girders 1/13 Sylvain GRIFFET, 15/11/2010 Measurements performed on the 28th of October 2010 with the Laser Tracker LTD500.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Team: Wolfgang Burkert, Haimo Jöhri, Uwe Barth Mechanical precision and vibration behavior of mechanical supports Johan Wickström GFA-ATK.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
5/7/2007 TS_CLIC_AB M.Taborelli, TS-MME High precision machining and metrology for structures: achievements and open questions M.Taborelli.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
SC Quadrupole Discussion Chris Adolphsen. Comments from Fernando Toral on SC Development for XFEL and ILC.
Presentation 7/05/2015 Giordana Severino ESR2.2, WP2 CERN Supervisors Marco Buzio Academic supervisor Prof. Pasquale Arpaia.
Phobos Magnet Status Leslie Rosenberg & Patrick Decowski, MIT Technical Advisory Committee November 1998.
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
Jeff T. Collins Undulator Support/Mover System 20 October 2005 LCLSLCLSLCLSLCLS LCLS Undulator Support/Mover System.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Preliminary Design of a Magnetic Measurement System for the Detector and Production Solenoids of the Mu2e Experiment Charles Orozco University of Illinois,
Two-beam module layout
16 T dipole in common coil configuration: mechanical design
Oleksiy Dolinskyy December 1st, 2014
High Precision Stretched Wire Bench
on behalf of the CLIC active pre-alignment team
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
DEVICE FOR THE IMPLANTATION OF NEURAL ELECTRODE ARRAYS
Blinking Orbital Prosthesis
TBL, Status, Plans, Experiments
EuroCirCol: 16T dipole based on common coils (DRAFT)
Robot Report “Emerson” Crawford Hampson EEL5666: IMDL April 8, 2010
EuroCirCol: 16T dipole based on common coils
16 T dipole in common coil configuration: mechanical design
Magnets for the ESRF upgrade phase II
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
SCU Next Phase Meeting July 8, 2014.
On the accuracy of port assembly at Wendelstein 7-X
Motion Control on ESS Test Beam Line
Presentation transcript:

TBL quadrupole mover prototype development J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, J. A. Rodríguez, CERN CERN, 22/01/2008

Outline Technical specifications Layout Fabrication and assembly Tests Future work Conclusions

Technical specifications Challenges: Compact design High accuracy Moderate price for series production

Layout (I) Horizontal actuator Actuators based on 5-phase step motors with integrated screws and electromagnetic brakes. Precision linear guides. Mechanical micro-switches: home position and end-of-movement detectors. Vertical actuator

Layout (II) Vertical actuator The inclination of the wedge enhances the vertical force, allowing a smaller motor to lift a given weight, and improving position resolution. There is a vertical linear guide, which leans on the horizontal actuator, and so makes vertical and horizontal movements independent. Drawback: the required overall length of the screw for the requested vertical stroke increases.

Fabrication and assembly

Tests at CIEMAT (I) Drivers can properly power the motors 50 m away. No problems to achieve the requested speed for the nominal mass. Preload is critical to minimize the backlash: spring for the horizontal movement; the own magnet weight for the vertical one. Reproducibility achieved for horizontal movement. However, first tests showed that left side movement was not accurate during vertical movement.

Tests at CIEMAT (II) We checked the micrometers accuracy. We found no clues for the problem when moving short distances: random errors. However, errors showed saturation for long distances.

Tests at CIEMAT (III) CM SOLUTION: the center of mass was out of the symmetry axis, due to the position of the micrometers. We are concerned about the reproducibility of few-micron movements (<10 micron). We cannot measure them with enough accuracy. We have found some problems with the reliability of the end-of-movement switches. They have a metallic sheet to detect the position of the mover which does not seem repetitive.

Tests at CERN CERN control system is successfully powering the mover. It is based on a PLC. No problems in the horizontal movement: 1 micron reproducibility! About 10 micron errors and backlash in the vertical movement: more measurements are necessary. End-of-movement sensor stiffness must be improved. Tests are still on-going.

Future works End-of-movement sensors improvements. Tests should be performed also with a dummy quadrupole. Resonances due to the water cooling vibrations are possible. The mover support on the girder is still being designed. The mover design will be updated with the detected mistakes before starting series production (15 units more). The aim is to finish by the end of 2008. The assembly will be likely done at CIEMAT.

Conclusions TBL quadrupole mover has been successfully designed, fabricated and tested at CIEMAT. The actuators are based on stepping motors with integrated linear screws. It is at CERN for acceptance. Some minor problems detected with the end-of-movement sensors and the vertical movement reproducibility. The design must be updated to start with the series production, which should be delivered by the end of 2008.