2016 SFEG Restoration Update

Slides:



Advertisements
Similar presentations
Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Adobe Upper Reach 5 Conceptual Plan Issues December 9, 2003 Workshop.
Advertisements

Washington Department
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
WRIA 8 Plan Updates 3-Year Work Plan and 10-Year Start List WRIA 8 Salmon Recovery Council March 18, 2010.
Salmon Recovery Funding Board (SRFB) 2008 & WRIA 8 Three Year Work Plan WRIA 8 Salmon Recovery Council March 20, 2008.
March SRSRB Meeting.  The purpose of this discussion is to provide early feedback to project sponsors  Five Application Submitted 1. South Touchet RM.
2010 Squak Valley Park Restoration Project City of Issaquah.
Measure M2 Freeway Environmental Mitigation Program.
California Integrated Waste Management Board 1 Agenda Item 5 (Committee Item F) September 8, 2008 Agenda Item 5 (Committee Item F) September 8, 2008 Consideration.
Amy Sheldon Watershed Coordinator February 3, 2004.
1 EEC Board Policy and Research Committee October 2, 2013 State Advisory Council (SAC) Sustainability for Early Childhood Systems Building.
Ross Valley Flood Control and Watershed Program Marin County Flood Control and Water Conservation District ~ Flood Control Zone 9 ~ Marin County Department.
Incorporating Spatial Heterogeneity in Temperature into Climate Vulnerability Assessments for Coastal Pacific Streams NOAA, UW, USGS This project will.
Protect & Restore Northeast Oregon/Southeast Washington Project Number ISRP – Geographic Review May 1, 2013.
TEMPLATE DESIGN © Student and Landowner Education and Watershed Stewardship (SLEWS) Program in Napa A program of the Center.
Daniel Oppenheimer Tamarisk Coalition May 20, 2014.
Kara Salazar Center for Earth and Environmental Science Indiana University-Purdue University Indianapolis
Feedback from engagement and consultation for physical condition River Basin Management Planning Unit.
Clackamas River Basin Council Lower Columbia River Conservation and Recovery Plan Implementer’s Perspective August 19, 2013.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Molalla River Knotweed Mapping, Outreach and Control Program Clackamas Soil & Water Conservation District.
Skagit County Natural Resource Stewardship Program.
Basin Implementation Planning SOUTHWEST BASIN ROUNDTABLE July 16, 2014.
NAWCA WFF Cons Grant NAWCA Walton Family Foundation Conservation Grant Update Brief History & Context Early 2009 > Initial discussions with WFF through.
Chesapeake Bay Trust 2007 Urban Greening Initiative Grant Program (formerly the Community Greening Initiative)
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Landowner Assistance Programs in Florida Gainesville, Florida September 24, 2010.
Friends of Marsh Creek Watershed “ C r e e k s C o n n e c t C o m m u n i t i e s ”
Preservation, Conservation and Restoration of North Carolina’s Water Resources CWMTF March 7, 2008.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
Farmland Preservation Partnership Opportunities with North Carolina Land Trusts J. Frank Parker Preserve, Pitt County North Carolina Agricultural Development.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
SFEP/EPA Proposal Background- prior NBWA grant EPA Funds and Process SFEP Process EPA Approval and Schedule NBWA Proposal-$1.5 Million Other Funds.
Flathead River to Lake Initiative Conservation and restoration through a diverse collaborative effort Part I – How it began Part II – Conservation Successes.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Photo courtesy of Michelle L. McConnell, Consultant Puget Sound Nearshore Ecosystem Restoration Partnership Puget Sound Nearshore Ecosystem Restoration.
Seattle City Light Stewardship Program Background: SCL stewardship work was contracted with SFEG to be conducted on the City’s lands purchased under the.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Outreach Programs and the Strategic Plan. Education Programs JSS: 6 th - 8 th grade Kids in Creeks: K-12 Salmon in the Classroom: 4 th grade Mount Vernon.
Regional Peer Learning Workshop: Accelerated Landscape Restoration Siuslaw Stewardship Model and Collaborative Engagement.
CITY OF STOCKTON CITY COUNCIL AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: 9.02Public Facilities.
Lower Merion Township Parks & Recreation Plan Implementation Plan.
Willamette River Initiative Willamette and tributary restoration through large-scale floodplain forest re-vegetation and in-stream habitat improvement.
Kennett Township land Stewardship Initiative
Fish Passage Barriers & Salmon Recovery
Brandywine Valley Association’s Red Streams Blue Program
Thorp Mill Ditch Assessment ( )
Presented By: Fran Borcalli, P.E. Program Manager
Jeff Marcus NC Longleaf Pine Restoration Director
Funding from the Local Perspective
Mulberry Watershed Management Plan
Washington County Parks and Open Spaces
Funding from the Local Perspective
Winter Water: A hot topic for cold fish.
Public Outreach and Education for Fish Passage
Dolores River Restoration Partnership Meeting
2017 SFEG Restoration Update
Stream Management Implementation Program Schoharie Watershed Advisory Committee Meeting October 24th, 2018.
Nonpoint Source Program
Colorado’s Forest Action Plan Mike Lester, State Forester and Director
BAIRWMP Update 10/1/2010 Background Prop 50 Supplemental funding
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Design and Engineering Services
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

2016 SFEG Restoration Update Sue Madsen 3/22/2016

Goal 4: Restoration Work Planning 4.1 Focal Area Plan, map (done) 4.3 Identify funding priorities by focal area GIS intern Robin Dittrich completed draft project focal area maps and impairment analysis this month currently working on integrating with outreach committee 4.4 Maintain project and partnership list (up next)

Goal 5: Restoration Implementation 5.2 Engage in at least 2 projects funded through the Lead Entity process 5.3 Correct Fish Passage barriers 5.4 Ensure adequate skills, expertise and resources

Objective 5.2 Engage in Lead Entity process 2015 Skagit SRFB Round – Successful grant applications: Pressentin Park Phase 2&3 - $1,775,590 Partnership with Skagit County Parks Hamilton-Carey’s Slough Preliminary Design Phase 1 -$200,000 Partnership with City of Hamilton, Skagit Land Trust Skagit Side channel barrier designs $77,688 Partnership with SLT, Private landowner, WDFW and Skagit County Public Works Skagit Basin Riparian Restoration $133,000 Partnership with SRSC, SLT, SCL

Objective 5.2 Engage in Lead Entity process 2016 Skagit SRFB Proposal – Collaborative riparian stewardship Partnering with Skagit County, USIT, TNC, SCL Have identified multiple properties in need of planting, maintenance and invasive control Lower Day Creek Slough SCL/Faber Hobbit Corners – SCL, TNC Hansen –USIT, Skagit County Parks

Objective 5.3 Correct Fish Passage Barriers Completed design for one of the floodplain barrier projects and secured $130,000 in funding from PSE to complete work in 2016 Working with SRSC, Skagit County, USIT to update Skagit fish passage barrier database and identify high priority projects Have reviewed and worked with landowners to submit 3 FFFPP applications in 2016

Goal 5.4 Ensure adequate skills, expertise &resources Bengt Miller moved up to Stewardship Director (Dec. 2015) Rachel West – has accepted preliminary offer of Riparian Coordinator position (3/22) Interviews for Habitat Restoration Coordinator scheduled for 3/29/16 Current techs are Andy Beckman, Kyle Koch Current WCC IP is Shannon Jones

SFEG Current Project Summary Riparian Planting & maintenance= 13 grants/contracts, 59 active project sites Barrier removal design and construction = 4 grants/contracts, 2 active project sites Off-channel habitat restoration = 2 active grant/project sites Feasibility studies = 1 active grant/contracts (1 pending) Stewardship =2 active projects; many properties

Board Tour Friday April 15, 2016 Meet at SFEG nursery at 08:30. Come early for brief nursery tour Lunch at HMSP Return to nursery by 4:00 pm Tentative Tour Stops EF Walker Creek – planting site and bridge Lower Day Creek Slough past & future planting, bridge Upper Day Slough – 2016 bridge HMSP – past side channel restoration Other????