Implementation of Progressive Energy Efficiency Projects with Local Electrical Utility and California Energy Commission Grant Funding AWWA Cal-Nevada AFC.

Slides:



Advertisements
Similar presentations
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Advertisements

The Power to Make a Difference PPL Electric Utilities April 2010.
Opportunities for Demand Response in California Agricultural Irrigation Gary Marks iP Solutions Corp. 10/15/2012.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
JOINT LEGISLATIVE AUDIT COMMITTEE HEARING SENATE BUDGET and FISCAL REVIEW COMMITTEE Delivering Energy Savings for California AMERICAN RECOVERY & Karen.
Paul A. Weghorst Executive Director of Water Policy
Upskilling Ontarians for Maximum Energy Efficiency Building Capability for a Conservation Economy November 7, 2013 Bryan Young, Manager Channel Strategy.
Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
In-conduit Hydropower: Public Sector meets Private Inventions
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
WESTERN UNDERGROUND COMMITTEE 2015 Spring Conference 65 th ANNIVERSARY 1950‐2015 Welcome Remarks Bill Chiu Director of Engineering – T&D Southern California.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Serves Local Distribution Companies Manages Small Business Lighting for 18 LDCs Largest evaluator of Retrofit Programs - 26 LDCs TRC tool and support.
Electric Utility Perspective on the Water-Energy Nexus Jack Sahl, Director Environment and Resource Sustainability Southern California Edison August 28,
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
JOINT UTILITY LOW INCOME PUBLIC MEETING California Alternate Rates for Energy (CARE) Programs Pacific Gas and Electric Company San Diego Gas & Electric.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
Request for Proposals: Energy Conservation Projects December 17, 2015.
Joint Agency Energy Action Plan Meeting December 15, 2009 San Francisco, California American Recovery and Reinvestment Act: Delivering Energy Savings for.
1 Your Utility Services: The Bottom Line Facilities Managers Meeting November 5, 2015.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
California Avocado Commission Workshop Fallbrook, California May 17, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
1 | emwd.org Fiscal Year 2015 / 16 Fourth Quarter Enterprise Performance Measures Update John Ward September 7, 2016.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
Massachusetts Clean Energy Center Budget Overview
What is OneWater? “One Water is an integrated planning and implementation approach to managing finite water resources for long-term resiliency and reliability,
Danube Water Conference 2017, Vienna
APTA Sustainability Workshop 2016
Irvine Ranch Water District Distributed Energy Storage Case Study
Self-Generation Incentive Program (SGIP)
Energy Savings Performance Contracts & Energy Service Companies
Frank Dick, PE Aaron Kraft Wastewater Engineer Project Manager
Energy Efficiency Obligation Scheme : Funding Energy Efficiency
Go LNG LNG Value Chain for Clean Shipping, Green Ports and Blue Growth in Baltic Sea Region.
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
NC AWWA-WEA 97th Annual Conference
Colorado Department of Public Health and Environment April, 18, 2008
6/12/2018 Grant Programs Review.
Distributed Energy Strategy - Solar PV

South Carolina Town of Kiawah Island June 7, 2016.
The Transition to a High DER Future
APTA Sustainability Workshop 2016
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Challenges and opportunities on Islands’ decarbonisation
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
SoCalGas Energy Efficiency Incentive Programs,
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Final Environmental Impact Report
Technical Press Briefing LIFE Sub-programme for Climate Action Commission proposal for a new LIFE Regulation ( ) 12 December 2011.
Chino Basin Water Bank Development
WATER SAVING PRODUCTS & PROGRAMS
Lake Elsinore Hydro Project
Presentation transcript:

Implementation of Progressive Energy Efficiency Projects with Local Electrical Utility and California Energy Commission Grant Funding AWWA Cal-Nevada AFC 2017 October 25, 2017

Cucamonga Valley Water District Dynamic, growing organization whose sole purpose is to provide high quality, safe and reliable water and wastewater services, while practicing good stewardship of natural and financial resources. Culture and Values Service Water People

Service Rancho Cucamonga, portions of the cities of Upland, Ontario and Fontana, and some unincorporated areas of San Bernardino County 190,000 customers 47-square-mile 45,000 water connections 35,000 sewer connections

Water 2016 Production (CY) 41,600 Production Facilities Ground Water – 29,400 AFT 29 wells Canyon Water – 1,200 AFT 3 Local Canyons Imported Water – 11,000 AFT 3 Surface Water Treatment Plants Production Facilities 69 Booster Pumps 35 Reservoirs 85 MG Storage

Water - Wells

Water - Boosters

Water - Distribution

People 130 Employees Innovative, empowered, and provide exceptional customer service Servant-oriented organization and provides Service Beyond Expectation to all customers

Energy Efficiency Philosophy Provide a high quality, sustainable water supply that is safe, reliable, and delivered at a cost-effective price Transitioning the Production System Operation Strategy: Demand Based to Efficiency Based Leverage utility programs, grants and incentives to achieve innovative and verified energy savings while boosting performance of their system in ways that may be replicated by other agencies. Leveraging nearly $333,000 (grant/incentive) funding with anticipated annual savings of $449,000

Working Toward This Goal CVWD Production and Controls Staff Third Party Consulting Honeywell Southern California Regional Energy Network (SoCalREN) Authorized by the California Public Utilities Commission - 2012 to harness the collective power of residents, businesses, and the public sector to achieve an unprecedented level of energy savings across Southern California. Identify energy saving measures and work side-by-side from design through construction All services provided by SoCalREN are provided at no cost Arrange financing and handle the utility rebate incentive process on your behalf. Provide access to on-call, high-quality energy retrofit construction professionals through the National Joint Powers Alliance (NJPA).

Project Timelines/Value 2017 2015 2014 2012 Optimize Well Pump Sequencing Optimize Booster Pump Sequencing Optimize Booster Pump Sequencing 3 and 3a Pump Efficiency Improvements Automated Demand Response

2010-2012 Automated Demand Response Southern California Edison’s (SCE) Technical Assistance Technical Incentives (TATI) Grant Goal Control System Upgrade/Participation in ADR Events Project Description $570K Grant Value 76 PLCs 6 Touch Screens 52 Radios 72 Antennas 6 Permanent Towers Timeline Concept: 11/10 Build: 8/11 3rd Party Verification: 2/12

2010-2012 Automated Demand Response Results: FYE 2013 CPP Quantity: 12 Peak Hours 14:00 – 18:00 ADR Quantity: 2 Hours: 14:00 – 17:00 Aggregator Payments 2011 FYI 5 Sites - $13,482.94 2012 FYI Combination - $67,356 2013 FYI 22 Sites Automated Demand Response - $162,071.23 CVWD upgraded its control system (Programmable Logic Controllers, communications, and Human Machine Interface) in an effort to provide a structure to incorporate an energy efficiency operations strategy

Pump Efficiency Improvements Goal Evaluate existing equipment for reasons of inefficiency and restoration of OEM specifications, or implement a design change to meet current system conditions Project Description CVWD worked together with The Energy Network using an SCE customized incentive of $0.08/kWh and $150/kW capped at 50% of project cost Thirteen vertical turbine pumps (4 wells/9 boosters) identified as operating outside of the acceptable plant efficiency (Boosters < 72%, Wells < 71%) Pull and repair the identified pumps Three requests for proposals/three separate contractors to pull and repair the pumps

Pump Efficiency Improvements Results Each contract was completed on time, within budget, and efficiencies were brought up to acceptable levels Installed Measure Cost $720,986 Verified Incentives: $184,556 Verified Savings: 2,191,098 KWh/Year

Optimize Booster Pump Sequencing 3 and 3a Goals The seven (7) booster pumps located at Stations 3 and 3A were identified as potentially benefiting from optimization of the booster pump sequencing with a goal of operating the optimum amount of vertical turbine pumps in the most efficient sequence Project Description The two pump stations boost well water from Reservoir 3 and 3A to Zone 4 Pump Station 3A Boosters 1 - 539.9 kWh/AF 2 - 543.7 kWh/AF 3 - 593.0 kWh/AF Pump Station 3 Boosters 1 - 377.2 kWh/AF 2 - 392.4 kWh/AF 3 - 402.0 kWh/AF 4 - 364.0 kWh/AF Design of subzone 4 in zone 5

Optimize Booster Pump Sequencing 3 and 3a Results Installation of 3 pressure regulating valves and booster sequencing programming This project was recognized as an area in need of stabilization and a capital improvement project was designated to address the pressure stabilization Installed Measure Cost $249,650 Verified Incentives: $56,543 Verified Savings: 2,191,098 KWh/Year

Optimize Well Pump Sequencing – In Progress Goals 24 well pumps identified as potentially benefiting from sequencing Provide more frequent data to re-evaluate the pump sequencing Project Description Operational Efficiency determined by kWh/Acre Foot Installation/Integration of individual electrical sub-meters Energy data, system demand and water quality data to provide an operations strategy which incorporates an energy efficiency control strategy

Water - Wells

Optimize Well Pump Sequencing – In Progress Results Installed Measure Cost $94,800.00 Estimated Incentives: $36,974.16 Estimated Savings: 462,177 KWh/Year

Optimize Booster Pump Sequencing – In Progress Goals 47 booster pumps and 9 well identified as potentially benefiting from sequencing Project Description Re-evaluate the pump sequencing in order to more efficiently meet system demand Booster pumps with lower energy intensities used to meet a greater portion of the system demand Installation/integration of electrical sub meters for each of the identified pumps This metered data was incorporated into the control scheme and is being used to give another metrics variable in system operation Results Installed Measure Cost $128,000 Estimated Incentives: $54,925 Estimated Savings: $74,600/Year

Water - Boosters

Energy Efficiency Progress With the completion of energy efficiency measures 1 and 2 the District has realized a decrease in ground water pumping costs from $245/Acre Foot (FY2015) to $190/Acre Foot (FY2017)

Innovation CVWD identifies areas capable of optimization and searches for methods to leverage resources to achieve a maximum benefit CVWD/SoCalREN partnership provided a method to leverage technology in a way which increased both efficiency and reliability CVWD provided resources contributing in the areas of design, installation, and integration of the controls.

Mission/Vision Provide high quality water while practicing good stewardship As good stewards CVWD is constantly looking for the highest value in projects. Value is rated with metrics including project cost, return on investment, and long term gains Through innovative processes, we were able to bring two groups of people together and develop projects which increased employee knowledge in the area of operations. This increased knowledge not only resulted in a successful high value project, but also increased the reliability of service.

Thank You Michael Maestas Water Production Manager Cucamonga Valley Water District Mikem@cvwdwater.com