Product Evaluation Review Questions.

Slides:



Advertisements
Similar presentations
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Advertisements

Presented by: Kathryn Hodges, NH
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
ISO 9001 : 2000.
OH 2-1 Agenda Sign in for all classes to earn credit for class Sign up for Presentations A test final test question will come from each of the group presentations.
Conditions of the Contract for Construction
PROCEDURES FOR SELECTING THE CONTRACTOR
1.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for the Evaluation of.
Marketing BY: CHEREESE LANGLEY. Nature of work Formulate, direct and coordinate marketing activities and policies to promote products and services, working.
5-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Product Evaluation ACT Objective O Emphasize the importance of proper product evaluation and selection O Develop insight into effective procedures,
Leaders Manage Daily Operations
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
Quality Cost Quality Cost- those cost associate with the non achievement of product or service quality. Types Prevention Cost –Planning, Document, Control,
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
المحاضرة الثالثة. Software Requirements Topics covered Functional and non-functional requirements User requirements System requirements Interface specification.
Chapter 12 Developing and Managing Products 12 | 3Copyright © Houghton Mifflin Company. All rights reserved. Objectives Understand how companies manage.
Interior Design Chapter One SOLVING THE PROBLEM After the research and data have been collected and articulated in the written program can the developments.
Engineering Design Introduction to Mechanical Engineering
Chapter 7 Selection Group 7 August 24, Employee Selection Selection is the process of choosing from a group of applicants those individuals best.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
BCN 4708 Fall 2008 Chapter 4 Drawings and Specifications.
Innovation Division. Innovation Its embedded novelty, providing qualitative increase in the efficiency of processes or products demanded by the market.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 9 Slide 1 Unit 9 Specifications and Commercial Construction.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Proposal COM (2010) 395 final: Concrete recommendations from the health and safety perspective Stefano Boy, Engineer Paolo Derosas, Lawyer European Trade.
Lecture 2. An Overview of Engineering Design JANUARY 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
4 Fire Prevention, Code Enforcement, And Fire And Life Safety Education Unit 4.
Product Evaluation Review Questions. 1. Product evaluation begins when: a.The characteristics of specific products are examined and assessed b.Final bids.
Level 2 Unit 1 Exploring the Engineering World Engineering Diploma Level 2 Unit 1 Exploring the Engineering World An Approach to Unit Delivery and Assessment.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
MGT601 SME MANAGEMENT. Lesson 31 Quality Control – II.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
PAUL GRIMSHAW. FIRE ISSUES IN LITIGATION Leaky Building Litigation – Traditional Defendants Council Builders Developers Architects Cladding manufacturers.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
PRODUCT DEVELOPMENT Student Notes. PRODUCT DEVELOPMENT  Is the process of creating new or improved products  Involves brainstorming, designing, building,
Title Page Title Page Add a picture of your project here.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
CHANGING PROJECT DELIVERY SYSTEMS
Dr. Lu Yuan, CSP Prejob/Pretask Planning and Accident Investigation and Reconstruction OSHE 382, Spring 2016 Dr. Lu Yuan,
Contractor Review and Prequalification
AUDITING BUSINESS PROCESSES Part Five. AUDITING BUSINESS PROCESSES Part Five.
Software Configuration Management
An Overview of Engineering Design
IAEA PERSPECTIVE ON THE FUTURE OF NUCLEAR POWER
Inspection and test data analysis
Contract Award Procedures
Add a picture of your project here
Table of Contents: Design
Skills & Employability Conference Kent
SOCIAL BUILDING PERFORMANCE ASSESSMENT: The next essential step
Market and Menu Assessment
Methods of Specifying Review Questions.
LEA 432 Enthusiastic Study/snaptutorial.com
HRM 300 PAPER Perfect Education/ hrm300paper.com.
Environmental Product Declarations
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
An Overview of Engineering Design
Maintenance Apart from safety, maintenance is needed to keep plant in an acceptable condition. Maintenance of this kind must be reviewed on an economic.
Presented By Melissa Lee Assistant Purchasing Agent Tarrant County
An Overview of Engineering Design
HRM 300 PAPER Dreams Come True / hrm300paper.com.
RISK ASSESSMENT.
HRM 300 PAPER best future education / hrm300paper.com.
HRM 300 MART best future education / hrm300mart.com.
Presentation transcript:

Product Evaluation Review Questions

1. Product evaluation begins when: The characteristics of specific products are examined and assessed Final bids are received The contractor submits samples The architect is hired to design a building

1. Product evaluation begins when: The characteristics of specific products are examined and assessed Final bids are received The contractor submits samples The architect is hired to design a building

Knowledge of materials and their characteristics 2. An essential qualification of the architect/engineer in product evaluation is: Knowledge of materials and their characteristics Knowledge of system characteristics Knowledge of methods for alleviating or eliminating potential problems All of the above

Knowledge of materials and their characteristics 2. An essential qualification of the architect/engineer in product evaluation is: Knowledge of materials and their characteristics Knowledge of system characteristics Knowledge of methods for alleviating or eliminating potential problems All of the above

Ventilation, Service, and Aesthetic properties 3. What are some functional product characteristics that should be investigated? Ventilation, Service, and Aesthetic properties Stain resistance, Operational characteristics and Illumination Material cost, Durability and Accessibility Fire safety, Replaceability and Accessibility

Ventilation, Service, and Aesthetic properties 3. What are some functional product characteristics that should be investigated? Ventilation, Service, and Aesthetic properties Stain resistance, Operational characteristics and Illumination Material cost, Durability and Accessibility Fire safety, Replaceability and Accessibility

All of the following are performance requirements EXCEPT: Interface characteristics Life safety Standards Waste products and discharge

All of the following are performance requirements EXCEPT: Interface characteristics Life safety Standards Waste products and discharge

Manufacturer’s product data, technical manuals 5. All of the following are major sources of proprietary information EXCEPT: Manufacturer’s product data, technical manuals Trade shows, television commercials Guide specification, SPEC-DATA, Sweet’s Catalogue File Manufacturer’s representatives, Product directories

Manufacturer’s product data, technical manuals 5. All of the following are major sources of proprietary information EXCEPT: Manufacturer’s product data, technical manuals Trade shows, television commercials Guide specification, SPEC-DATA, Sweet’s Catalogue File Manufacturer’s representatives, Product directories

6. Five major aspects to be considered in the evaluation of a product are: Product characteristics, Manufacturer, Installation, Costs, Maintenance Availability, Product characteristics, Costs, Maintenance, Manufacturer Material Cost, Life Cycle Cost, Installation Cost, Litigation Cost, Contractor Costs Case studies, Failures, Problems, Legislation, Errors, and Omissions

6. Five major aspects to be considered in the evaluation of a product are: Product characteristics, Manufacturer, Installation, Costs, Maintenance Availability, Product characteristics, Costs, Maintenance, Manufacturer Material Cost, Life Cycle Cost, Installation Cost, Litigation Cost, Contractor Costs Case studies, Failures, Problems, Legislation, Errors, and Omissions

Where has it been used and under what conditions? 7. What question should the A/E ask about the performance history of a particular product? Where has it been used and under what conditions? How long has it been on the market? Has it been properly engineered and researched? What is its maintenance record? All of the above

Where has it been used an under what conditions? 7. What question should the A/E ask about the performance history of a particular product? Where has it been used an under what conditions? How long has it been on the market? Has it been properly engineered and researched? What is its maintenance record? All of the above

If they are used in a low budget project 8. Under what conditions would items of lesser importance and expense warrant thorough research? If they are used in a low budget project If those items would have a major impact under safety and liability responsibility If only one or two research sources are available for data To ascertain if the product exceeds the manufacture’s claims

If they are used in a low budget project 8. Under what conditions would items of lesser importance and expense warrant thorough research? If they are used in a low budget project If those items would have a major impact under safety and liability responsibility If only one or two research sources are available for data To ascertain if the product exceeds the manufacture’s claims

List the manufacturer’s qualifications List all acceptable products 9. In what way can you ensure a product by a certain manufacturer will be used? List the manufacturer’s qualifications List all acceptable products List all performance characteristics List all legal requirements

List the manufacturer’s qualifications List all acceptable products 9. In what way can you ensure a product by a certain manufacturer will be used? List the manufacturer’s qualifications List all acceptable products List all performance characteristics List all legal requirements

Availability of skilled workers Size of existing building’s openings 10. Which factors about the installation of a product affect it’s selection? Size conditions Availability of skilled workers Size of existing building’s openings Odors in existing buildings All of the above None of the above

Availability of skilled workers Size of existing building’s openings 10. Which factors about the installation of a product affect it’s selection? Size conditions Availability of skilled workers Size of existing building’s openings Odors in existing buildings All of the above None of the above

11. What are the three steps in product evaluation? Establish product suggestions, Identify possible products, Do post occupancy evaluations Establish cost parameters, Receive bids, Select product Establish low bidder, Identify products low bidder used, Require submittals Establish product requirements, Identify possible products, Evaluate products

11. What are the three steps in product evaluation? d. Establish product requirements, Identify possible products, Evaluate products possible products, Do post occupancy evaluations Establish cost parameters, Receive bids, Select product

Answers a d b c e