The GAIA mission: The Italian participation in the DPAC Consortium ASI contract I/037/08/0 First Progress Meeting (PM1) Progress Report Mario G. Lattanzi.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

GENIUS kick-off - November 2013 GENIUS kick-off meeting The Gaia context: DPAC & CU9 X. Luri.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
Global Business Blueprint Summary Presenters: Laurie Dempsey, CBP Lois McCluskey, eCP January 28, 2004.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
Understand Virtualized Clients Windows Operating System Fundamentals LESSON 2.4.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
WRAP Technical Support System Project Update AoH Call October 19, 2005.
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
JAVAPOSTM Java for POS Devices
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
Release & Deployment ITIL Version 3
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
Software Engineering Project Assignment 7 Group 3 IT-201.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
Hutch Neilson Princeton Plasma Physics Laboratory K-DEMO Project Meeting 26 June 2013 NFRI-PPPL K-DEMO Project Status and Plans Overview.
GENIUS. WP600 Support Activities Participants: University of Barcelona: 6PM CESCA (Center for Scientific and Academic Services of Catalonia): 24PM University.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
DoG Ticket Trouble Ticket Web App By: David, Gabe, Trevor Group 4.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
GIFINT Wp100 objectives Istituto di Fisica dello Spazio Interplanetario, INAF, Roma. GIFINT, WP100 Report. ESWW2, Estec, Nov 2005 Teledife (Italian.
Measured Progress ©2011 Guide to the Smarter Balanced IT Architecture Connecticut Assessment Forum August 14, 2012.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Public Health Reporting Initiative October 31, 2012.
Il ruolo della spettroscopia a grande campo per Gaia B. Bucciarelli - INAF/Osservatorio Astronomico di Torino S. Randich - INAF /Osservatorio Astrofisico.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
Management of Software Project CSM Review By:Nafas.
3GPP2-A GPP2-SCG3GAdHoc/ R1 1 Montreal.
MoW Report Group Name: TP21 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
IPDA Architecture Project International Planetary Data Alliance IPDA Architecture Project Report.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
Standard Design Process Overview
CARPE DIEM 4 th meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
Capital Facilities Program Update San Rafael City Schools August 8, 2016.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
DU15: Internal Photometric Calibration Dafydd Wyn Evans, IoA
HMA Follow On Activities
3. Update of Parthenos Entities Model
Supporting quality devices
HMA Follow On Activities
OASIS OPENC2 TECHNICAL COMMITTEE MEETING (Final Version)
HITSP 2009 TC Timeline Overview
GIADA Grain Impact Analyser and Dust Accumulator
Universitat de Barcelona / FBG
HMA SPS Mandatory I/F Development
Implementation Plan Ronald Drimmel (Project Manager)
Tennessee Longitudinal Data system (TLDS)
How to Successfully Implement an Agile Project
BioMedBridges – Work Packages 2 & 12
Ctclink executive leadership committee May 31, 2018
Reportnet 3.0 Database Feasibility Study – Approach
Project Management Method and PMI ® PMBOK ® Roles
Executive Project Kickoff
Project Kick-off <Customer Name> <Project Name>
NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Project Name Here Kick-off Date
Presentation transcript:

The GAIA mission: The Italian participation in the DPAC Consortium ASI contract I/037/08/0 First Progress Meeting (PM1) Progress Report Mario G. Lattanzi (Responsabile Scientifico) INAF – Osservatorio Astronomico di Torino ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

Main DPAC/ASI-level activities Activities at - c/o ALTEC Presentation Layout Main DPAC/ASI-level activities Activities at - c/o ALTEC Main updates/Changes in the Italian participation Documents and Technical Notes released in the period July-Aug 2008 ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008 2

Main DPAC/ASI-level activities (1/3) ECSS-level Documentation 1.1 Completion of SRS’ (SW Req. Spec.s) for AIM, BAM, and GSR (Affected WPs: GWP-M-340) 1.2 Contribution to SDP updates (CU2, 3, 4, 5, 7, and 8) (Affected WPs: GWP-T-010, M-340, M-230, M-301, M-335, M-437, M-450, T-513, T-514, M-710) 1.3 Preparation of SDD (SW Design Documents) ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

Main DPAC/ASI-level activities (2/3) 2. Software deliveries (Java) 2.1 IDT Cross-match (CU3) (to DPC-E/ESAC) (Affected WPs: GWP-M-350) 2.2 BAM device measurements simulator (CU2) (to DPC-E) (Affected WPs: GWP-M-230, M-340) 3. Recruitment of PC, IE, and PS for the DPAC PO at ESOC Final interviews at ESTEC on Sep 8. Italian candidate one of the three finalists comprising the PC (very) short list. (Affected WPs: IWP-M-100, M-001, T-010) ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

Main DPAC/ASI-level activities (3/3) Manning the DPAC management structures (DPACE, coodoination within CUs, Steering Committees) (Affected WPs: GWP-M-001, T-010, M-340 ) Contribution to CU and DU-level workshops, telecon,s and videoconf.s (Affected WPs: GWP-M-230, M-350, M-437, T-514, M-710, S-825, M-T01 ) Preparation of PM1 meeting (Affected WPs: IWP-M-100, GWP-M-T01, O-T10 ) Preparation of the draft contract to ALTEC for approval at next meeting of INAF Executive Board (CdA) (Sep 15 &16) (Affected WPs: IWP-M-100) Support to the Italian member of the GST (Affected WPs: IWP-M-100 ) Support to ASI representative in the MLA SC (Affected WPs: IWP-M-100 ) ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

Activities at - c/o ALTEC (Affected WPs: IWP-M-100, GWP-M-T01, O-T10, T-T02) DPC ALTEC project team establishment Account request for accessing GAIA portal and application servers. Review of the GAIA project documentation Participation to the DPAC teleconference on the DPAC End-to-End testing definition Meetings with the OATO team and interviews with single OATO scientists for the initial definition of the DPC-T scenario and functional architecture Preparation of DPC-T feasibility Study document ALTEC Environment preparation and Hosting of the OATO SGI computer for GSR development and test (including enabling remote access from OATO) ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

Main updates/Changes in the Italian participation Action Affected WP(s) Comment Martino (ALTEC) replaced Volpicelli (OATo) GWP-M-T01-0000 GWP-T-T02-0000 Planned change of WP managers ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

Documents and Technical notes released from July - to Aug ‘08. The reports and technical notes below constitute deliverables at each PM. The list provided presents the entire production (13 major reports) of the Italian activity for the period July – August 2008 and is part of this progress report to comply with the deliverable documentation table of the “Allegato 1” of the “Allegato Tecnico Gestionale” to the ASI contract. The actual documents can be retrieved from the Gaia Livelink site at ESTEC or downloaded from the page set up at the site of the Italian participation in Gaia at www.oato.inaf.it/astrometry/Gaia_Italia/index.html. Both sites are password protected. [If necessary, paper copies can be delivered to ASI.] ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

CU5 Van LEEUWEN F., BROWN A., …., CACCIARI C., …… PANCINO E. et al., 1 Jul 08, CU5 Internal Report 2008.07, Techn. Note, GAIA-C5-PR-IOA-FVL-027, 57 pgs CU5 DU Managers, 15 Jul 08, CU5 Software Requirements Specification, Techn. Note, GAIA-C5-SP-IOA-FVL-014-02, 82 pgs CU8 SORDO R., VALLENARI A., 15 Jul 08, Description of the CU8 Cycle 4 simulated data, Techn. Note, GAIA-C8-DA-OAPD-RS-003, 12 pgs ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

CU2 BABUSIAUX C., GRUX E., RUSSO F., ....., GARDIOL D., 9 Jul 08, GaiaSimu 4.1 User Guide, Techn. Note, GAIA-C2-TN-OPM-FC-001-04, 26 pgs GARDIOL D., BABUSIAUX C., CORCIONE L., LURI X., MASANA E., RUSSO F., SARTORETTI P., 2008, 1 Jul, Instrument Model Overview 4.0, Techn. Note, GAIA-C2-TN-INAF-DG-009, 14 pgs LOREGGIA D., BUSONERO D., 1 Jul 08, Optical performances over the CCD AF-R7C1: WFE simulation and PSF preliminary analysis, Techn. Note, GAIA-C2-TN-INAF-DL-003-1, 18 pgs ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

CU3 CROSTA M., GARDIOL D., KLIONER S., LATTANZI M.G., MIGNARD F., MORBIDELLI R., 5 Aug 08, The GAREX experiment protocol, Techn. Note, GAIA-C3-TN-INAF-MTC-002-1 2. CROSTA M., GARDIOL D., LATTANZI M.G., MIGNARD F., MORBIDELLI R., 5 Aug 08, Implementation of the GAREX protocol. Progress Report n. 1, Techn. Note, GAIA-C3-TN-INAF-MTC-003-1 GARDIOL D., LATTANZI M.G., 11 Aug 08, AVU/BAM Data Analysis Software Requirements Specifications, Techn. Note, GAIA-C3-SP-INAF-DG-004-04 ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

CU3 (cont.) 4. SPAGNA A., 31 Jul 08, IGSL XM 1.0 Algorithm and Software Description, Techn. Note, GAIA-C3-TN-OATO-ASP-001-01 5 . VECCHIATO A., 6 Aug 08, A more efficient algorithm for the derivation of the constants of notion in GSR1, Techn. Note, GAIA-C3-TN-INAF-AVE-003-01 ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008

DPAC management documents DRIMMEL R., MIGNARD F., 2008, Minutes of the sixth DPACE meeting, Techn. Note, GAIA-CD-MN-INAF-RD-015-1, 24 pgs 2. MIGNARD F., DRIMMEL R., 07 Jul 08, Minutes of the fourth DPACE telecom, Techn. Note, GAIA-CD-MN-DPAC-FM-037-1, 4 pgs ASI contract I/037/08/0 – PM1 PR - MGL ASI HQ, Roma, 5 Sep 2008