An ACSLite Case Study Riva Road in Annapolis, MD

Slides:



Advertisements
Similar presentations
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Advertisements

1. Green Lights Program Objectives Improve Quality of Synchronization in a Short Timeframe Noticeable Improvements to Motorists Appropriate Allocation.
Travel Time Estimation on Arterial Streets By Heng Wang, Transportation Analyst Houston-Galveston Area Council Dr. Antoine G Hobeika, Professor Virginia.
.nowNAZTEC 1. Overview AGENDA Benefits Algorithm Simulation 2 Case Studies Real-time adaptive traffic control system Adjusts signal timing based on current.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
ACS-Lite Offset Tuning Algorithm. Collect data from advance detectors on coordinated approaches Develop a Statistical Flow Profile correlated to the phase.
ACS-Lite Split Tuning Algorithm. Collect data Correlate data to signal phasing Perform analysis Implement phase split adjustments.
Peek – ACS Lite Deployment Quixote Traffic Corporation Peter Ragsdale August 17, 2006.
U.S. Department of Transportation Federal Highway Administration ACS-Lite FHWA Adaptive Signal Control Systems Raj S. Ghaman, P.E. Team Leader, Office.
1 Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 10/18/11.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
KC REGIONAL TRAFFIC SIGNAL COORDINATION. Agenda  National Perspective  OGL Video Overview  Mid – America Regional Council  Program Elements  What.
1 Travel Model Application for Highway Vehicle Emission Estimation Ho-Chuan Chen, Ph.D., P.E. King County Department of Transportation Seattle, Washington.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Customized Simulation Modeling Using PARAMICS Application Programming Interface Henry Liu, Lianyu Chu & Will Recker.
CIVITAS PLUS INTELIGENT TRAFFIC MANAGEMENT AND CONTROL IN THE CITY OF SKOPJE Lovren Markic, Site Leader Athens 24 April 2012.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
Columbus Computerized Traffic Signal System Eagan L. Foster, P.E. Transportation Division Columbus Public Service Department Where have we been? Where.
Assessment of Urban Transportation Networks by integrating Transportation Planning and Operational Methods /Tools Presentation by: Sabbir Saiyed, P.Eng.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
November 15, 2005 Dr. Robert Bertini Dr. Sue Ahn Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Traffic Safety and Operations Lab Dept. of Civil and Environmental Engineering University of Maryland, College Park Maryland State Highway Administration.
Walter Kulyk, P.E. Director, Office of Mobility Innovation Federal Transit Administration Session 11: ITS Research in the U.S. and Abroad 2007 ITSA Annual.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
FHWA - Pooled Funds Speed Summit By: Kurt Matias February 23, 2010
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
SCATS Field Experience at the Gary Piotrowicz PE, PTOE TRB January 11, 2004.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper # Presentation to the 18 th World.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Data Collection Plan / Experimental Design May.
1 Evaluation of Low-Cost Safety Improvements (ELCSI) Pooled Fund Study Roya Amjadi, Highway Research Engineer FHWA, Turner-Fairbank Research Center 10/24/08.
Advancing Traffic Signal Management Programs through Regional Collaboration T3 Webinar -- July 23, 2009 Jim Poston Regional Transportation Commission Reno,
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
Arterial Travel Times Using Bluetooth Detection Presented by Amit Sidhaye, P.E., PTOE Project Manager SIGNAL SYSTEMS & ITS ARLINGTON COUNTY May 16, 2013.
VDOT’s Operations Program Update and Opportunities July 17, 2015 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
ITS Virginia Annual Conference April 20, 2012 Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other product and company.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Traffic Signal Performance Measures. 2 by Grant S. Sanders, P.E. VDOT NWRO Regional Signal & Freeway Operations Engineer
Bell Road Adaptive Signal Control Technology (ASCT) Deployment Project
Kanok Boriboonsomsin, Guoyuan Wu, Peng Hao, and Matthew Barth
Thinking Inside the Box
Transportation Funding Deal Explained
FHWA’s Review of Hampton Roads’ Traffic Signal System
Estes Park Transportation Project Funding
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Bell Road Adaptive Signal Control Technology (ASCT) Deployment Project
GREEN WAVE TRAFFIC OPTIMIZATION
Traffic Engineering Division Nestor A. Flores, P.E., PTOE
Adaptive Signals & ALDOT
Transportation Research Board 2004 Annual Meeting
Irvine Traffic Research & Control Center (ITRAC)
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
Transit Signal Priority: Evolution
Transit Signal Priority: The Importance of AVL Data
Status Report on Rochester’s DMC Transportation Plan
ITE Midwestern District Conference June 20, 2017
School of Civil Engineering
What’s happening in la Habra?
Presentation transcript:

An ACSLite Case Study Riva Road in Annapolis, MD Kevin L. Newton, TSOS Traffic Engineer Anne Arundel County DPW Matthew J. Allen, PE, PTOE Wallace Montgomery (SWaM Certified) An ACSLite Case Study Riva Road in Annapolis, MD ITS: The Next Generation ITSVA Annual Conference Richmond, Virginia April 19-20, 2012

Agenda Project Introduction and Overview CMAQ Funding ACSLite Basics Riva Road ACSLite Deployment Before & After Study Lessons Learned Questions

An ACSLite Case Study Riva Road in Annapolis, MD Project Introduction

Project Introduction and Overview

Project Introduction and Overview

An ACSLite Case Study Riva Road in Annapolis, MD CMAQ Funding

CMAQ Funding Congestion Management and Air Quality Grant 80% Federal contribution - 20% County match County fronts money and is reimbursed Documentation requirements Initiated Grant process - Fall 2008 Received Approval - July 2009 Completed Before Studies - March 2010 ACSLite System On-line - November 2010 Completed After Studies - March 2011

CMAQ Funding Project Costs Initial Estimate $141,200 (County share $28,240) Network Equipment Requirements ≈ $40,000 Engineering Studies ≈ $27,000 Total Project Costs ≈ $218,000

An ACSLite Case Study Riva Road in Annapolis, MD ACSLite Basics

ACSLite Basics ACSLite – Adaptive Control System Developed by FHWA Siemens University of Arizona Purdue University Test sites in US CA, FL, OH, TX CA, OH, TX, MD

ACSLite Basics Closed loop signal system Recommend fiber connectivity System continuously monitors signals and traffic flow Adjusts Real Time System Offset Times Signal Split Times Signal Cycle Lengths are not adjusted

ACSLite Basics Evaluate & Monitor Provide Refinements 3 Levels of Optimization Time of Day Runtime Refiner Transition Manager

ACSLite Basics Typical ACSLite Field Application

ACSLite Basics Riva Road ACSLite Field Application

ACSLite Basics ACSLite Screen Shot – Detector Status

ACSLite Basics ACSLite Screen Shot – Pattern Status

ACSLite Basics ACSLite Screen Shot – Phase Timing Status

An ACSLite Case Study Riva Road in Annapolis, MD Riva Road ACSLite Deployment

Riva Road ACSLite Deployment Wait for the completion of Fiber installation Installed 20 new Video Detector Cameras Upgraded signal controllers to accept network connectivity (NTCIP) Installed dedicated ACSLite computer Assisted by RGA, LLC / Siemens County Signal Technicians County Information Technology Technicians

An ACSLite Case Study Riva Road in Annapolis, MD Before & After Study

Before & After Study CMAQ evaluation requirements Select Measures of Effectiveness (MOEs) Travel Time and Delay Vehicle Emissions Minor Street Queues Analyzed two “Corridors”

Before & After Study

Before & After Study Riva Road Corridor Travel Time (sec) Ave Speed (mph) Riva Road Corridor Total Delay (sec) Emissions (grams*)

Riva Rd / Forest Dr Corridor Before & After Study Travel Time (sec) Ave Speed (mph) Riva Rd / Forest Dr Corridor Total Delay (sec) Emissions (grams*)

An ACSLite Case Study Riva Road in Annapolis, MD Lessons Learned

Lessons Learned Would we do it Again? Accurate Baseline System “Groundhog Day Effect” Detection, Detection, Detection Infrastructure/Communications Link Emissions Computations Use of Technology for Data Collection Would we do it Again?

An ACSLite Case Study Riva Road in Annapolis, MD Questions?

An ACSLite Case Study Riva Road in Annapolis, MD Kevin L. Newton, TSOS Traffic Engineer Anne Arundel County DPW Matthew J. Allen, PE, PTOE Wallace Montgomery (SWaM Certified) MAllen@WallaceMontgomery.com 410-494-9093 An ACSLite Case Study Riva Road in Annapolis, MD ITS: The Next Generation ITSVA Annual Conference Richmond, Virginia April 19-20, 2012