Seawater Desalination

Slides:



Advertisements
Similar presentations
The State of Brackish Groundwater Desalination in Texas Jorge A. Arroyo P.E. Innovative Water Technologies.
Advertisements

F4- Delivering results-based finance Latin America and the Caribbean Carbon Forum 2014 Bogotá, Colombia, Sept 4 th, 2014 Claudia Barrera, WBG.
Direct Potable Reuse (DPR) – Has It's Time Come? 1 DPR.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Barbara Canales, Port Commissioner Where the World Comes to Prosper with Texas.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
Workshop – Local Financing, Role of ESCo Gavin Slater City Energy & Carbon Manager, Glasgow City Council
Policy Position Statement.  Ground Water Replenishment (GWR) - by Monterey Regional Pollution Control Agency (MRWPCA) and Monterey Peninsula Water Management.
Project 2020 Strategic Planning Process
Eric S. Petersen Partner Hawkins Delafield & Wood LLP New York, NY United States Conference of Mayors Mayors Water Council Meeting Washington,
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Desalination, With a Grain of Salt: A California Perspective Desal Response Group Aquarium of the Pacific October 2006.
1 Emergency Financial Response: Drought Rates May 15, 2014.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
Presentation to Community Reference Group Thursday 7 February 2013 Patterson Lakes Community Centre.
Orange County Voter Perceptions: Water and Desalination Survey Analysis October 14, 2008.
The State of Seawater Desalination in Texas Jorge A. Arroyo P.E. Innovative Water Technologies.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
Monterey Peninsula Water Supply Project April 23, 2012.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
1 The Tampa Bay Water Surface Water DBO Joe Ortiz U.S. Conference of Mayors November 19, 2008.
July 2007 AMTA Event Type “Theme” Location - Date Improving America’s Water Through Membrane Filtration & Desalting America’s Authority in Membrane Technology.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Financing for Environmental Compliance U.S. EPA Office of Compliance A step-by-step guide to help communities finance environmental infrastructure.
Los Angeles Department of Water and Power Seawater Desalination Update by: Alvin Bautista, P.E. October 2007.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
Overview of Desalination Trends and Jaffna Project
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Portfolio Management December Vision To achieve a flexible, responsive and synchronized portfolio that meets the short and long term needs of.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Stage 2 Light Rail Transit Program “In the ground ready”
Integration of Temperature Control into the Supply Chain
Progress Briefing - Energy Initiative
APTA Sustainability Workshop 2016
Nikolay Voutchkov, PE, BCEE
Starting a Business Understand the procedures and requirements for starting a business.
3.03 Starting a Business Objective 3.03 Understand the procedures and requirements for starting a business.
CIFA 2016 Workshop Performance Based Infrastructure
Recycled Water Project – Sharon Heights GCC
Memorandum of Understanding with GE Osmonics, Inc
WATER for TEXAS Water for the Future
KEYNOTE STAGE SPONSOR.
Alternative Project Delivery: Lessons Learned and Yet to be Learned
APTA Sustainability Workshop 2016
Starting a Business Understand the procedures and requirements for starting a business.
3.03 Starting a Business Objective 3.03 Understand the procedures and requirements for starting a business.
P3 Conference 2018 Sam Beydoun Bureau Chief
The Oregon Approach to Innovation in Infrastructure
PROJECT DELIVERY METHODS
Controlling Project Cost and Schedule
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Brackish Water Desalination Project
Delta Water Supply Project
The Role of Private Sector in Capital Budgeting
Executive Project Kickoff
Claude “Bud” Lewis Desalination Plant
Lower Laguna Madre Estuary Program
Presentation transcript:

Seawater Desalination Corpus Christi Seawater Desalination Desalination Summit 2 November 2017

What Motivated Initial Interest in Seawater Desalination? Period of prolonged drought and increased economic activity… Desire to reduce risk of water rationing / curtailment to industrial operations Concern that available water supply was impacting competitiveness of region in attracting new industry and expansions Interest in diversifying and strengthening the region’s water supply through development of a drought-proof source

Desal Group Partners – “The Stakeholders” Corpus Christi Regional EDC City of Corpus Christi San Patricio MWD Port of Corpus Christi Chemours Cheniere Energy CITGO Flint Hills Resources Lyondell-Basell OxyChem Sherwin Alumina Valero voestalpine Texas AEP Texas Talen Energy Engineering and Technical Consultants: Lead: Freese and Nichols, Inc. Team: Jorge Arroyo, Water Globe Consultants, The Louis Berger Group, The Banister Group, Assistant Energy Manager, Naismith Engineering, Olivarri and Associates

Siting

Configurations Developed/Assessed Desalination Plant – 6 options (4 @ 20 MGD; 2 @ 10 MGD) Distribution Pipeline Arrangement – 12 options Gulf Discharge Pipeline ($70+ million) Organizational Structure (Public, Private, Blend) Pre-Procurement Development Strategy (Early or Late Exit) Financing Options (Public, Private) Project Delivery Methods (DB, DBO, DBOM, DBFOM, etc.) DB: Design-Build DBO: Design-Build-Operate DBOM: Design-Build-Operate-Maintain DBFOM: Design-Build-Finance-Operate-Maintain

Concept 10-30 MGD (dependent on demand profile) Expandable Running at full output all the time (no throttling) Desalinated water treated to potable standards Delivered to the Regional Water System Seek funding through SWIFT Procurement method: Design-Build, or Design-Build-Operate Inner Harbor La Quinta Both Cost to Produce ($/1000 gal) $ 3.78 $ 3.76 $ 3.77 Cost to Distribute ($/1000 gal) $ 0.24 $ 0.21 $ 0.22 Delivered Cost of Desalinated Water ($/1,000 gal) $ 4.02 $ 3.97 $ 3.99 Cost of Capital: 3%, 30-yr 25% Contingency Power at 5¢/kw-hr Project development, administration, organizational costs and studies estimated in the $10-12 million range for 20 MGD project…scaled down to $8 million for 10 MGD project

Timing Is Everything! Supply Demand Lead Time Key Factors Affecting Project Timing Supply Demand Lead Time

Development Approach SWIFT 2 SWIFT 1 Pre-Development Procurement, Contracting, Delivery Bid package Statement of qualifications Request for proposals Selection Contracting Water purchase agreement Delivery SWIFT 1 Pre-Development Project procurement methodology Concentrate mgmt strategies Site selection and surveys Source water characterization Confirm plant size and point of delivery Infrastructure integration plan Intake / Outfall concept design Power supply agreement File owner’s permit applications Trigger Ready

Thank You Questions