Ocean Prediction Networking

Slides:



Advertisements
Similar presentations
NordKyst-800m The Norwegian Coastal Model Bjørn Ådlandsvik Institute of Marine Research Opnet, Geilo, May 2010.
Advertisements

C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
SEE_INNOVA Smart Innovation Voucher CREATE-NET’s experience Budapest, November 11 th 2014 Paola Baruchelli.
Marine Core Service MY OCEAN WP18.3 – Assessment and Users Requirements for “Marine Safety” Task : Assessment and requirements for “Marine Safety”
I- Nord, september 2008 i-Nord An Integrated System for Surveillance of the Arctic Oceans Olav Rune Godø (Havforskningsinstituttet)
Learning Objectives Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
ECOOP Consensus Meeting, Erdemli, March 2005 ECOOP WP13: Demonstration & Evaluation of ECOOP Monitoring Forecasting and Information System  Goals:  Demonstration.
73 rd ExCo ECES Lleida 2012 EUWP_ECES Carlos López- EUWP Chair 1.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
2 nd Wind Seminar 28 September Project The Wind Atlas for South Africa project is an initiative of the South African Government - Department of.
LenCD Governance Charter Final DRAFT LenCD Partners Meeting Kigali 10./11. February
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Results of the Thematic Monitoring Group 2 Development of Skills within Companies, particularly SME’s.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
FLAVIUS Description of Overblog, Qype, TVTrip - WP5 Evaluation and dissemination.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
S 1 Annual Meeting 2013 Core theme 5 Status and updates Chiara Bearzotti NACLIM project manager.
RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running.
LAW&ICT Shared Virtual Campus, Zaragoza Meeting, October model for technical support to LAW&ICT Shared Virtual Campus: a proposal Selahattin Kuru.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Henning Wehde I IMR I 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP 2 Strengthening regional.
African Centre for Statistics United Nations Economic Commission for Africa Data compilation and management proposal for Africa Statistical Commission.
21 November 2013 Brussels Cristina Padeanu -PATIENT EVIDENCE WORKSHOP - JOINT ACTION ON PATIENT SAFETY AND QUALITY OF HEALTH CARE (PASQ) PROJECT.
Project monitoring Official visit of the Grant Agency on Strengths of the project: professional results, progress compliance with work plan.
Work package WP1 Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project:
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
EUNetPaS is a project supported by a grant from the EAHC. The sole responsibility for the content of this presentation lies with the author(s). The EAHC.
HQVET High Quality of Vocational Education and Training - European best methods for improving VET system Meetings, Tasks and Responsibilities This project.
1 Project Coordinators’ meeting March 2010 NATIONAL TEMPUS OFFICES (NTOs) & HIGHER EDUCATION REFORMS.
WP 9 Ecosystem modelling and data assimilation The overall objective is to improve forecasts of the pre-operational systems with quantitative evaluation.
Progress Report on Quality Issues SIPUS – Strengthening of Internationalisation Policies at Universities in Serbia February 18, 2015 Belgrade, Serbia.
Unit 2. Reading Assignments On the Unit 2 Reading Page, click the link to take you to this article: "Podcasting: A new layer of communication" by Tom.
WP 5 – Dissemination of Project-related Information WP leader – UNI Dr. Vladan Pavlović Assistant professor English Department, Faculty of Philosophy University.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Using ‘Informs’ at Newcastle University Library Moira Bent Jenny Campbell March 2004.
WEB 434 Week 3 Individual Web-Based Supply Chain Paper Individual Web-Based Supply Chain Paper Write a 2-3 page paper, explaining web-based supply chains.
Fostering cooperation among the science and industry in Jelgava and Siauliai (LLIII-160) Liene Rulle Project manager Jelgava City Council.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
WP4 Models and Contents Quality Assessment
SAMIRA Andrei Diamandi
Norwegian Research School in Global Health (NRSGH)
MODULE 15 – ORGANISATIONAL COMMUNICATION
Norwegian Forum for Global Health Research
INTAROS – Integrated Arctic Observation System
General Situation (Overview)
Management - coordination
CBP Strategic Communications Plan
Lasse H. Pettersson, ARCONOR project coordinator
ARC MFC: En havovervåkings- og varslingstjeneste for nordområdene
Project budget, documentation,payments and reporting
Behavioral Based Interview STARS
Partner’s name Name of the person who attends the meeting
COMMUNICATION STRATEGY Supporting a dynamic community of practice
Marine Strategy Framework Directive Competence Centre
Organisation Météorologique Mondiale Pour une collaboration active dans le domaine du temps, du climat et de l’eau OMM Operating principles of the WMO.
Dr. Drini Imami Agricultural University of Tirana
IPET-OPSLS/CCl-17 relevant issues before EC-70
Social Dialogue on Education and Training ESF Committee 10 March 2011
General Information on the Partnership Centre for IODE Ocean Data Portal Dr Sergey Belov, et al. Partnership Centre for the IODE Ocean Data Portal Review.
United States Report to the SAON Board Martin Jeffries
Day 1: Introduction to Ramp Tools
REPORT OF THE AGENDA ACTIVISTS
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
ESSNet SERV 2 Implementing Shared SERVices
Rannis Kick off meeting 29. January 2019, Oslo
DG Justice and Consumers
WP7 – Related activities
Presentation transcript:

Ocean Prediction Networking Velkommen OPNet Ocean Prediction Networking

OPNet Overall objective: To strengthen and formalize collaboration among Norwegian institutes involved in research and development related to marine forecasting Commissioned by: RCN (Research Council of Norway) Subcontractors: IMR, NERSC, NIVA

OPNet Specific objectives: To monitor and discuss existing forecast products and their performance to help improving the tools and the methods used to produce the ocean forecasts. To develop common validation tools that can be run to provide measures of the forecast skill. To develop our understanding of the strength and weaknesses of the different model modules used by the partners. To implement and operate a web-page for dissemination of forecasts, and forecast performance, e.g. skill measures.

OPNet: WP1 WP1: Seminars. Two day seminars At least two researchers from each of the partners must attend. Representative from a selected user groups and from foreign national groups by invitation Agenda: To discuss ocean prediction products, tools and methods, i.e., data assimilation methods, numerical methods, numerical model implementation results originating from other projects of relevance for ocean prediction. Deliverables: Minutes summarizing recommendations made.

OPNet WP2 WP2: Development and dissemination Automatic validation product or skill measures of the model forecast. Display products on a website Deliverables from this WP are manuscripts documenting and explaining the products. The first of these will document the validation system and its implementation.

Resources: Institute Res.Sci. Other Total met.no 318 240 558 IMR 182 32 214 NERSC NIVA SUM 864 336 1200