LOI Backup Document: R&D

Slides:



Advertisements
Similar presentations
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Advertisements

5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Hybrid Status Carl Haber 12-Aug-2008 UCSC. 6 x 3 cm, 6 chips wide 10 x 10 cm, 10 chips wide 1 meter, 3 cm strip, 30 segments/side 192 Watts (ABCD chip),
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
25/06/2015Robert King, Oxford University - Graduate Seminar Series 1 Electronic speckle pattern interferometry at the SLHC.
Y. Unno, 2007/2/26 sLHC sensor R&D Module Plans (Nobu) Manufacturing plans, including financing (Nobu) Sensor Specs (Nobu)

ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Martin Gibson (RAL), Richard Holt (RAL), Dave Lynn (BNL), Peter Phillips.
Mitch Newcomer Representing work at RAL, Liverpool, BNL and Penn.
Stave General Meeting Intro and Status on: BCC, Co-Cure, ASIC req, HSIO Carl Haber 6-May-2011.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Y. Ikegami, T. Kohriki, S. Terada Y. Unno (KEK), K. Hara (Univ. of Tsukuba) G. Barbier, F. Cadoux, A. Clark, D. Ferrere, S. Gonzalez-Sevilla, D. La Marra,
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Agenda for Stave Working Mtg CH. Organization Status reports – Mechanical and material – DC-DC – Electrical test – HSIO Working sessions: DAQ, powering,
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Serial Powering System Architecture Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of the SP Community Acknowledgement: many figures prepared.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
Rutherford Appleton Laboratory Particle Physics Department 1 Serial Powering Scheme Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of RAL.
Sergio Díez Cornell, Berkeley Lab (USA),
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Dummy Modules The next step is to build and test 10 thermal modules for tests and distribution. What do we want to test? Thermal performance and variation.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Phase-II strips update S. Díez, 22 Mar S. Díez, Phase-II strips update Outline  Recent activities at Berkeley (What’s new since January)  US stavelet:
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
Serial Power Distribution for the ATLAS SCT Upgrade John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Richard Holt (RAL),
01/10/2009 Y. Ikegami, KEK RD09, Florence1 Development of low-mass, high-density, hybrid for the silicon microstrip sensors in high track density environment.
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Si Sensors for Additional Tracker
Berkeley status Aug 10th, 2012.
Summary LBNL LSWG meeting
Technical Design for the Mu3e Detector
ATLAS ITk Short-Strip Stave prototypes with 130nm chipset
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
Constructional requirements from ITk-Strips
Database requirements from ITk-Strips for DAQ loads
Adapting the via last Design
Equipment for Assembly – UK Experiences
WG4 – Progress report R. Santoro and A. Tauro.
Work packages status in Torino and perspectives
Tracker Outer Barrel Silicon
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
Presentation transcript:

LOI Backup Document: R&D Feb Stave Mtg 2012

Topics Overview of systems needs for R&D: The R&D needed for the tracker falls into a number of broad categories, detailed below. Mechanical: The basic element of the tracker is a stave, built up from a thermo-mechanical stave core. The stave core is composed of various carbon based materials, adhesives, and cooling structures. These materials and their fabrication and assembly is an R&D topic. The staves are mounted on light carbon fiber barrels, also a topic of R&D. Sensors: This covers the design of prototyping of silicon strip sensors. Cooling: This covers the basic cooling system, cooling plant, and requirement. Electrical: This covers the FEE, hybrids, modules, and data transmission within the stave. Powering: This covers the alternative powering schemes, serial and DC-DC, and their control, monitoring, and power protection aspects. This also covers the HV distribution and monitoring within the stave. Services: This covers all the off-stave services, in particular optical vs copper, cable plant and cable use/re-use scenarios, and coolant distribution. Assembly: This covers the processes for manufacturing during production including hybrids, modules, cores, flex, staves, and module mounting. Alignment: This covers mechanical alignment and monitoring with is not part of the assembly process. Trigger: This covers the application of the stave tracker to a Level 1 track trigger.

Ongoing Status Reports Stave Core Fabrication: Tim Jones and David Lynn Petal Core Fabrication: Carlos Lacasta Mechanical Bus Co-Cure: Georg Viehhauser and Carl Haber Supermodule Mechanics: Frank Cadoux DECLINED P-type Sensor Development: Nobu Unno, Hartmut Sadrozinski Cooling Studies: Georg Viehhauser Development of the ABC-next 130 nm Chip: Francis Anghinolfi Development of the Hybrid Controller Chip: Mitch Newcomer DONE Development of the SPP Serial Powering Chip: Mitch Newcomer Development of the DC-DC Conversion ASIC and PCB Package: Georges Blanchot Hybrid: Ashley Greenall Module: Tony Affolder Stavelet Test Program: Peter Phillips Petal Electrical Program: Ingrid Gregor Supermodule Electrical Test Program: Didier Ferrere DECLINED Digital Data Transmission on the Stave and the BCC Chip: Carl Haber DONE Power Protection and Serial Powering: David Lynn and Mitch Newcomer DONE Cabling and Services Survey and Analysis: Sergio Diez Cornell Hybrid Assembly Process: Ashley Greenall Module Assembly Process: Tony Affolder Stave Mounting Process: Martin Gibson DONE Low Mass Tape Development: Tony Weidberg DONE HSIO Data Acquisition System: David Nelson and Carl Haber Alignment R&D: Richard Nickerson Level-1 Track Trigger R&D ROI based: NEED Author Level-1 Track Trigger R&D Self Seeded: Maurice Garcia-Sciveres

Pending R&D Needs HV Multiplexing: David Lynn DONE Additional Cabling Studies: Sergio Diez-Cornell Optical Data Transmission to the Stave: Tony Weidberg The Petlet Program: Ingrid Gregor Application of the RCE system to stave DAQ Su Dong