Report on Working Group # 2 The MU2E detector

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
MFT Progress Report Ginés Martínez García for the MFT project ALICE mini-week, Sep 1 st -5 th 2014.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Standard electronics for CLIC module. Sébastien Vilalte CTC
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
12/2/2015S.Miscetti - ROMA11 S.Miscetti Laboratori Nazionali di Frascati Mu2e Italian Meeting 12/2/2015 University La Sapienza, Roma.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
Waveform Digitizer Review Franco Spinella 30/5/2016.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Profiler Mechanics Update
Physics and Calorimeter Requirements
Wander baldini on behalf of the SHIP Muon Group
Mauro Raggi PADME Kick-off meeting Frascati, 20th-21st April 2015
University of Wisconsin
Detector building Notes of our discussion
Mu2e crystals qualification
ESR for the muon DT Minicrate System
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
ASTRI camera status Giovanni LA ROSA
Calorimeter Mu2e Development electronics Front-end Review
Technical Design for the Mu3e Detector
Ti/SS transitions A.Basti INFN-PISA*
Update on the SVD construction
Claudia Cecchi University of Perugia and INFN
- PANDA EMC Readout System
Production Firmware - status Components TOTFED - status
CCS Hardware Test and Commissioning Plan
Recent progress of PureCsI+APD readout
Status of works on the Collaboration Contract between IHEP and FAIR
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
T1 Electronic status Conclusions Electronics Cards:
SciFi option for neutrino target tracker
CMS November Upgrade Week
Development electronics SIPM-MU2e
Vertex Detector Mechanical R&D Design Questions and Issues
Mu2e status for CSN1 referees
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
CMS Goal of the experiment
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
GLAST Large Area Telescope
RPC Detector Control System
Calice Tile-HCal and Tail-catcher/Muon Tracker
Status of the ESS High Power RF Systems
Presentation transcript:

Report on Working Group # 2 The MU2E detector S.Miscetti LNF INFN Frascati MUSE Scientific Board meeting 15-Sep-2017

Calorimeter: Status (1) PRE-Prod of Crystals completed PRE-Prod od MU2E SiPMs completed PRE-Prod of FEE preamplifier completed PRE-Prod of MB , NIM-version done  V1 design completed, in production x 5 PRE-Prod of WD. V1 design completed  First board in Pisa. V2 (versatile link + DCDC converter) under planning V3 (SmartFusion2  PolarFire ) being discussed FEE  WD cables being modified with better connector. Much more reliability  much higher cost Module-0 completed Test beam of Module-0 done Getting ready for slice test with all final components S. Miscetti | MUSE SB meeting 15 Sep 2017

FEE-MB + WD status First prototype (V1) of 20 ch digitizer done (DIRAC). Design of Mezzanine board 20 chs also completed. Production underway. Changes for digitizer V2: Optical drivers selected by Mu2e does not work after 4 krad TID  CERN Versatile Link ?? New DCDC converter (LTM8033  LTM8053). It has lower efficiency than LTM8033 but works up to 150 krad. Changes for digitizer V3: Only existing FPGA radiation tolerant at acceptable cost (350 Euro/each) was the Microsemi SmartFusion2  tested from tracker group. Not reprogrammable after 10 krad. Internal delay increases after 60 krad New family of FPGA Polarfire, disponibile Q4, works up to 600 krad  compatible cost. S. Miscetti | MUSE SB meeting 15 Sep 2017

Calorimeter: Status (2) CRR review for CsI and SiPMs done 19 June 2017  Comments/Recommendations received (0) Review the limit on energy resolution , hold (1) Measure SiPM outgassing, done (2) Perform a stress test of SiPMs, done DOE IPR-review done end of July Tender for crystals and SiPMs completed  2 vendors for CsI (Siccas, St.Gobain)  1 vendor for SiPM (Hamamatsu) PO are ready  production will start end of the year Preparation of QA site in progress at SIDET S. Miscetti | MUSE SB meeting 15 Sep 2017

SiPM Holder outgassing measurement 4 SiPM holders tested (2 HPK SiPMs, 2 FEE chips, Faraday cages/holders) Thermic glue used to join SIPMs to holders. Measurement were taken for almost 3 week  Heating for 72 hours at 45 °C. After 480 hours (20 days) We have reached: 1 x 10-5 mbar x liters/sec The final calorimeter system has about 1400 full-holders. Total SiPM/FEE contribution for outgassing is obtained as: Qtot1 = 1 x 10-5 mbar x liters/s x 1/4 (4 full-holders) x 1400 = 3,5 x 10-3 mbar x liters/sec Qtot = Qtot1 x 0.75 (Torr/mbar) = 2,6 x 10-3 Torr x liters/sec  Comparable with CsI outgassing S. Miscetti | MUSE SB meeting 15 Sep 2017

SiPM Thermal Test We have stressed the MPPC with thermal cycles between 20 and -10 ○C We used a Temperature Chamber in SiDet Lab-B borrowed for 1 week. 30 min per Thermal Cycle; Not relevant variation observed in the leakage current after 15 cycles. It will be part of our QA S. Miscetti | MUSE SB meeting 15 Sep 2017

QA assembly area at FNAL S. Miscetti | MUSE SB meeting 15 Sep 2017

Mechanics Preparation of tenders for Disk support + CF ring and plate. Tenders for crates, back disk (PEEK) and cooling in 2018. New version of SiPM holder exists. A lot of improvements. Plan is to have most of the pieces at end of 2018. Crystal and SiPM assembly beginning of 2019. S. Miscetti | MUSE SB meeting 15 Sep 2017

The Mu2e calorimeter deliverables D2.1 (Technical Design Report) Month 12 D3.3 (Design of the Mu2e Laser system) Month 18 D4.2 (Development of Mu2e simulation code) Month 32 D2.2 (Production DB for crystals and sensors) Month 36 D2.5 (Assembly of the first calorimeter disk ) Month 42 Delay on deliverable for Laser system. Still some delay but work has started. C. Ferrari and I had a great meeting last week. Designs/offers for bundle of fibers are ready  proto soon. Laser power calculated  5-10 uJ. 3 models under study. Distribution optics  few options under consideration. PIN-Diode with Corradi FEE being discussed. Working on a draft version in the coming weeks. S. Miscetti | MUSE SB meeting 15 Sep 2017