James Ridewood BE-OP-SPS

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
Schedule IT General Schedule 9 th, September 09 Today.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
SPS Personnel Protection System Renovation Project
ABT-EC EYETS Activities 2nd reports
SPS LS1 Planning meeting (N019) 04/09/13
DRY RUNS 2015 Status and program of the Dry Runs in 2015
SPS Winter stop Planning meeting (N06) 05/01/2011
TE-MSC activities in SPS during LS2
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Injector De-cabling Project
Evolution and future of the Access safety and control systems
Saturday :12 Stable beams fill 3351 Initial luminosity
Shift instructions August 16, 2017 Antoni Aduszkiewicz
LAAWG Status Report – 15th May 2007
Instrumentation for SPS 2006 restart
Update on HW commissioning
Installations, modifications, consolidation in 2005:
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
Steps towards beam commissioning: Magnet power supplies
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS CC: Final plan for interlocking of crab cavities in SPS
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS East Extraction bump inhibit during COLDEX operation
EN-CV interventions during EYETS for PS and PSB
Summary of week 7 Hardware Commissioning:
TE-MSC activities in SPS during YETS
Tuesday 11th September LHCb dipole presently fault off
LEIR & ITE BPMs COMMISSIONING STEPS.
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
LHC Morning Meeting - G. Arduini
Week 35 – Technical Stop and Restart
Thursday 10th January 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test.
Friday 14th December - morning
Wire almost entirely through beam before BLM triggers dump
Technical Stop #4 29th August - 2nd September 2011
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
1v1.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Friday 15th February - morning
Review of hardware commissioning
HI2011 Commissioning Status
Presentation transcript:

James Ridewood BE-OP-SPS SPS restart 2016 James Ridewood BE-OP-SPS

Polarity, stability and heat tests TI2* and TI8 DSO test LHC Machine Closure and patrol DSO test chains 2,3,4,5 Polarity, stability and heat tests TI2* and TI8 DSO test LHC Deconsignation and HV tests Main power supply tests EPC and OP AUX & TT20 Power supply tests Main power supply tests EPC and OP AUX & TT20 Power supply tests

Beam to LHC Main power supplies available to OP Main power supply tests EPC and OP AUX & TT20 Power supply tests OP tests with main power supplies DSO test chain 1 OP tests with main power supplies OP tests with main power supplies Beam to SPS from PS Beam based realignment? Setup with beam Setup with beam Beam to LHC DSO test North chains

Closure All works finished for 19th February Machine should be immaculate with all waste material removed There is no cleaning campaign and this is not the job of RP or OP Machine empty at 15h latest to allow patrol Access system to be in state to pulse mains morning 22nd February All EIS to be operational and back in chain before DSO tests

What do we do? Check the chain of control of equipment from CCC software interfaces via controls middleware down to hardware Ensure that timing, references and associated functions can be loaded to each equipment and that equipment follows correctly its function Polarity checks to ensure that polarities correct and that power supplies act on correct magnets Stability checks and heat runs Ensure all mobile equipment can be moved (vac valves, beam instrumentation, etc) and is left in the correct position Verification of interlocks Simulate conditions with beam Etc, etc, etc…

Morning meetings Every weekday morning in CCC at 8h30 To discuss plans for the day and progress follow up Attendance not obligatory, however…. If you need access Need to announce delays or problems Wish to know current status

Access Possibility of access during EPC tests before 9h Between 12h30-14h After 18h All access must be requested at morning meeting with impacts prepared

Contact CCC SPS – 77500 Morning and afternoon shifts as of 19th 07h00 – 20h00 Weekends and nightshifts depending upon needs Re-commissioning coordinators Stephane.Cettour.Cave@cern.ch 165246 James.Ridewood@cern.ch 160590