Interfaces Between CCS trackside and other subsystems Joint sector research and validation for the specification of the electromagnetic compatibility.

Slides:



Advertisements
Similar presentations
Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
Advertisements

Interfaces Between CCS trackside and other subsystems Joint sector research and validation for the specification of the electromagnetic compatibility.
NETLIPSE Infrastructure Project Assessment Tool Stuart Baker, Deputy Director of National Rail Projects Department for Transport, UK Zagreb, November 10,
OTM TASK FORCE EFRTC General Meeting Sofia, Markus Hofmann, EFRTC OTM Task Force Chairman Franz Messerli, UNIFE OTM Task Force Vice-Chairman.
WP3 - Proceedings Consortium Meeting, Graz (27. – ) Peter Wintersteller Iris Pein.
The European Railway Agency in development
REMOVING BURDENS – a European rail system fit for the future Thierry Breyne – European Rail Agency - Head of the Safety Unit International Railway Safety.
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
Malta’s National Action Plan for Green Public Procurement Marie-Louise Mangion Tourism and Sustainable Development Unit Parliamentary Secretariat for Tourism,
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
Overview System modelling and holistic simulation :
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
11 Satellite-based solutions for Train Control Systems European Parliament, Brussels Tuesday, 11 February 2014 Francesco Rispoli, Manager Satellite Technology.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
JRC - IRMM – 17/18 June 2008 – EAQC-WISE project workshop – Held1 The EAQC-WISE blueprint: Recommendations for a quality control system for chemical monitoring.
TSI WAGONS (321/2013) modifications BEWAG 27/04/2015.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
EurailSpeed, Milano, 08 November 2005 Joint European Research to New Concepts for Modular Trains including HST – MODTRAIN project Dr Imrich KORPANEC UIC.
Transport Rail Safety & the Railway Safety Directive Frank Jost Single European Rail Area EU Commission 1.
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
TSI WAGONS. 1. Former situation 2 Former TSI Wagons  2006/861/CE TSI with open points  each member state must check items to its national regulation.
Vehicle-Wayside Intercommunications: future EN Standard Marcos Albuquerque January 2002.
109 July 2009CER The Voice of European Railways Cross Acceptance CER Expectations ERA Seminar, Lille, Libor Lochman.
SAFETY AND INFRASTRUCTURE REQUIREMENTS FOR TEL-2 INSTALLATION IN THE LAB Paolo Magagnin (BE-BI-ML) 24 – April
SIAFI APRIL Affiliate Active Associate UIC in 2006.
Eurostat Sharing data validation services Item 5.1 of the agenda.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
HIGH SPEED RAIL ASSESSMENT NORGE
About the European Science Foundation 1. 2 ESF Member Organisations ESF is an independent association of 13 Member Organisations ● research funding organisations.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
European Women Interactive Learning GRUNDTVIG Learning Partnership PROJECT ACTIVITIES REVISION With the support of the Lifelong Learning Programme of the.
European Standard Freight Axle (ESFA) AG BEWAG -10th May 2016.
Quieter Surface Transport in Urban Areas Project Presentation.
Copyright © AEbt 2016 All Rights Reserved. AEbt Angewandte Eisenbahntechnik AEbt Angewandte Eisenbahntechnik (AEbt Applied Railway Technology) Further.
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
REMOVING BURDENS – a European rail system fit for the future
Electronic summary customs declaration for rail freight traffic with RailControl November 2010.
Europe: an open space for rolling stock?
European Rail Infrastructure Managers
NAB/RB Training Workshop In Valenciennes, April 2016
Current status of Shift2Rail
"Step by Step" Guide to implement TAF TSI
Tweet or short statement
4th Railway Package – Implementation of the Technical Pillar
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Session II: System authority for ERTMS 4RP Trackside approval
PROPOSALS ON ETCS COMPATIBILITY TESTING & RE-AUTHORIZATION
Chances for quick wins in the railway sector
Pavel Kodym Interoperability expert
Network/route compatibility
ERA Seminar Cross Acceptance Ad hoc Summary
The ERA EVORA Program Evolution of railway radio communication
European Rail Freight Association (ERFA), represents the independent rail freight sector across the whole value chain : Railway Undertakings (RUs) Wagon.
Eurostat D2 – Regional Indicators and Geographical Information
JSC Railway Research Institute
Considerations on the NRMM Technical Review
CONFORMITY ASSESSMENT GUIDELINES FOR
CYRAIL Final Conference ERA on cybersecurity
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
Integration of 1520/1524 requirements. Progress report.
Railway Conference Pardubice
Task Force on GNB 14 – 15 November
Presentation transcript:

Interfaces Between CCS trackside and other subsystems Joint sector research and validation for the specification of the electromagnetic compatibility

Sector involvement Cross acceptance Working party Collection and classification of national rules CCS TSI editing including update of the “Interfaces Between CCS trackside and other subsystems” Specification of target system EMC Working Party Contributing to the EMC target specification Projects aiming in closing the EMC open points 14/12/2010

Motivation of the sector involvement Requirements for the compatibility between vehicles and axle counters + track circuits for the authorisation of vehicles are currently an open point in the TSI CCS. As a consequence national rules have to be followed today, in some cases national rules do not exist The joint sector projects aim to a reach broad European acceptance of the new limits test specifications provide the scientific input for the closure of open points related to the vehicle/train detection interface 14/12/2010

Overview of EMC Project planning 2010: partial validation of TS 50238-2 (vehicles and track circuits in the 15kV network) 2011-?: validation of TS 50238-3 (vehicles and axle counters) 2012-2014: closure of TSI CCS open points in FP7 4th call project proposal EUREMCO 2013-2015: closure of TSI CCS open point “eddy current brake” – CTG project idea for FP7 5th call 14/12/2010

EMC phase 1 TS 50238-2 establishes new vehicles emission limits and vehicle test methods for the compatibility with track circuits funding provided by CER/EIM/UIC for the partial validation in the 15kV network Tests have been carried out by DB, SBB and ÖBB with the support of Siemens Test report expected by end of December 2010 To be included in the CCS TSI at the next revision 14/12/2010

EMC phase 2 TS 50238-3 establishes new vehicles emission limits and vehicle test methods for the compatibility with axle counters UIC applied for TEN-T co-funding for a joint validation campaign of 8 CER/EIM (UIC) members in all networks in 2011 Expected outcome: Validated list of practically relevant parameters Susceptibility limits for axle counters missing so far Validation of vehicle emission limits and vehicle test method of TS 50238-3 and proposal for improvements Proposal for the quantification of other relevant parameters Funding rejected – further strategy to be developed !!! 14/12/2010

EMC phase 3 - EUREMCO If positively approved, EUREMCO will finalise the validation of the TS 50238-2 (track circuits) for DC 1,5kV, 3kV and AC 15kV/16,7Hz, 25kV/50Hz Expected outcomes: Set of test signals to test track circuits again transients Clear definitions and specifications for the assessment of transients Limits for the characteristic parameters of transients for both vehicles and power supply (sources) and track circuits (destination) Clear understanding of the influence of the infrastructure on the conducted emissions of vehicles Transfer function from test results within the same power supply system (for track circuits). Requirements that rolling stocks will not disrupt track circuits on non-electrified lines 14/12/2010

EUREMCO: EUropean Rail ElectroMagnetic COmpatibility UNIFE applied jointly with 10 UNIFE/CER/EIM/UIC members for FP7 4th call co-funding for a project in 2012-14 Funding: €2,1m, Budget: €3,6m 14/12/2010

Remaining open point: Eddy current brake A CTG project idea which has been picked up by ERRAC in the « sector wishlist » for the FP7 5th for a joint project of UNIFE/CER/EIM/UIC members in 2013-15 Funding: open Expected outcome: Improve understanding of the interaction of the eddy current brake with the track and trackside signalling equipment Identify critical thermal, mechanic and electromagnetic parameters and its related vehicle and trackside compatibility limits Develop design, engineering and operational guidelines for new eddy current brakes and new trackside signalling equipment 14/12/2010

Conclusion Sector target – simplified vehicle autorisation through: Harmonised EMC limits, both for signalling susceptibility as well as for vehicle emissions Harmonised test method proving the vehicle conformity with the specified limits Final goal – one assessement applicable for all networks compliant with the INTERFACE document Precondition: Strong cooperation of all stakeholders: railway undertakings, infrastructure managers as well as manufacturers (both of vehicles as well as of signalling) 14/12/2010