Control Charts for Attributes

Slides:



Advertisements
Similar presentations
Statistical Control Charts
Advertisements

© 1997 Prentice-Hall, Inc. S3 - 1 Principles of Operations Management Quality Via Statistical Process Control Chapter S3.
Operations Management Statistical Process Control Supplement 6
Quality Assurance (Quality Control)
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
[1] MA4104 Business Statistics Spring 2008, Lecture 06 Process Monitoring Using Statistical Control Charts [ Examples Class ]
Global Business Management Group
Quality Control Chapter 8- Control Charts for Attributes
Peta Kontrol (data Atribute). Peta Kontrol ( data atribute ) Attribute control charts arise when items are compared with some standard and then are.
Chapter 9- Control Charts for Attributes
Control Chart for Attributes Bahagian 1. Introduction Many quality characteristics cannot be conveniently represented numerically. In such cases, each.
Goal Sharing Team Training Statistical Resource Leaders (3) Peter Ping Liu, Ph D, PE, CQE, OCP and CSIT Professor and Coordinator of Graduate Programs.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
Module 3: Statistical Quality Control Operations Management as a Competitive Weapon.
Statistical Process Control
Control Charts for Attributes
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Copyright © 2014 by McGraw-Hill Higher Education. All rights reserved. Essentials of Business Statistics: Communicating with Numbers By Sanjiv Jaggia and.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
Control Charts for Attributes
Defects Defectives.
Other Univariate Statistical Process Monitoring and Control Techniques
Chapter 7.
Quality management: SPC III – control charts for attributes
The Bell Shaped Curve By the definition of the bell shaped curve, we expect to find certain percentages of the population between the standard deviations.
Chapter 13 Quality Control and Improvement COMPLETE BUSINESS STATISTICSby AMIR D. ACZEL & JAYAVEL SOUNDERPANDIAN 7th edition. Prepared by Lloyd Jaisingh,
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
Process Capability and SPC
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Process Capability and SPC
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Control Charts for Attributes
Chapter 10 Quality Control.
CONTROL CHART FOR QUALITY CONTROL _ X-R CHART _ X-R chart is a pair of chart consisting of a average chart (X chart) and a range chart (R chart). The X.
Statistical Process Control. An Old Story abridged from ‘Right First Time’ An entrepreneur knows of a business opportunity of supplying plastic discs.
Copyright © 2010, 2007, 2004 Pearson Education, Inc Lecture Slides Elementary Statistics Eleventh Edition and the Triola Statistics Series by.
Chapter 7. Control Charts for Attributes
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
1 Six Sigma Green Belt Introduction to Control Charts Sigma Quality Management.
Statistical Process Control Production and Process Management.
Using Minitab to construct Control Chart Part 2. SN
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
TOTAL QUALITY MANAGEMENT CONTROL CHARTS FOR VARIABLES AND ATTRIBUTES.
1 CHAPTER (7) Attributes Control Charts. 2 Introduction Data that can be classified into one of several categories or classifications is known as attribute.
Dr. Dipayan Das Assistant Professor Dept. of Textile Technology Indian Institute of Technology Delhi Phone:
STATISTICAL QUALITY CONTROL (S.Q.C.) PRESENTED BY-: NIKHIL GARG ROLL NO
Section 5 Control Charts. 4 Control Chart Applications Establish state of statistical control Monitor a process and signal when it goes out of control.
VARIABLE CONTROL CHART : Mean and Dispersion  - Chart  R - Chart  S - Chart.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
VARIABLES CONTROL CHART (X & R)
PROCESS CAPABILTY AND CONTROL CHARTS
POPULATION VERSUS SAMPLE
COMPLETE BUSINESS STATISTICS
Control Charts for Attributes
Chapter 7 Process Control.
Attribute Control Charts
X AND R CHART EXAMPLE IN-CLASS EXERCISE
10 Quality Control.
Higher National Certificate in Engineering
Process Capability.
Glossary Attributes Data Average Basic Statistical Methods Capability
Presentation transcript:

Control Charts for Attributes p chart (fraction of nonconforming items) np chart ( number of nonconforming items) c chart (number of nonconformities in some unit) u chart (number of nonconformities per unit)

The p Chart Procedure Step1. Gather the data. Select the size, frequency and number of samples. Step2. Calculate p for each sample. Step 3. Set the scale for the control chart. Step 4. Plot the p values and connect them. Step 5. Calculate p-bar, and the control limits after about 20 points have been charted. Step 6. Interpret the chart

Chart Interpretation Shifts. A shift of seven or more points to a higher or lower level could mean that something has affected the proportion defective or that the definition of what is defective has somehow changed. Trends. A run of seven or more points up or down indicates that something is causing the proportion that is defective to change in a gradual manner, poorly trained operators, different inspection criteria, or poorly controlled parts in the assembling process.

The np Chart Standard given: UCL = np0 +3np0 (1-p0) LCL = np0 - 3np0 (1-p0) No standard given: UCL = x + 3  x (1- x/n) LCL = x - 3  x (1- x/n)

The c Chart Standard given UCL = c0 + 3 c0 LCL = c0 - 3 c0 No standard given UCL = c + 3c LCL = c - 3c

The u Chart (variable unit size) u = c/k k is the number of inspection units in each sample UCL = u0 + 3 u0/k LCL = u0 - 3 u0/k