The ARDA Project status report

Slides:



Advertisements
Similar presentations
LHC Experiment Dashboard Main areas covered by the Experiment Dashboard: Data processing monitoring (job monitoring) Data transfer monitoring Site/service.
Advertisements

OSSE School Improvement Data Workshop Workshop #4 June 30, 2015 Office of the State Superintendent of Education.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EGEE is a project funded by the European Union under contract IST “The ARDA project: Grid analysis prototypes of the LHC experiments” Massimo.
The Preparatory Phase Proposal a first draft to be discussed.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
EGEE is a project funded by the European Union under contract IST The ARDA Project Between Grid middleware and LHC experiments Juha Herrala.
CHEP – Mumbai, February 2006 The LCG Service Challenges Focus on SC3 Re-run; Outlook for 2006 Jamie Shiers, LCG Service Manager.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
EGEE is a project funded by the European Union under contract IST “ARDA status” Dietrich Liko / CERN XXVII HTASC, 10 September
DOSAR Workshop, Sao Paulo, Brazil, September 16-17, 2005 LCG Tier 2 and DOSAR Pat Skubic OU.
David Adams ATLAS ADA, ARDA and PPDG David Adams BNL June 28, 2004 PPDG Collaboration Meeting Williams Bay, Wisconsin.
LCG LHC Computing Grid Project – LCG CERN – European Organisation for Nuclear Research Geneva, Switzerland LCG LHCC Comprehensive.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
GLite – An Outsider’s View Stephen Burke RAL. January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative!
Early Thinking on ARDA in the Applications Area Torre Wenaus, BNL/CERN LCG Applications Area Manager PEB Dec 9, 2003.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
LCG ARDA status Massimo Lamanna 1 ARDA in a nutshell ARDA is an LCG project whose main activity is to enable LHC analysis on the grid ARDA is coherently.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE Experience of using gLite for analysis of ATLAS combined test beam data A. Zalite / PNPI.
15 December 2015M. Lamanna “The ARDA project”1 The ARDA Project (meeting with the LCG referees) Massimo Lamanna CERN.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
HEP Applications within EGEE - an overview and relations with GAG F Harris (Oxford/CERN) EGEE is proposed as a project funded by the European Union under.
David Adams ATLAS ATLAS-ARDA strategy and priorities David Adams BNL October 21, 2004 ARDA Workshop.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
EGEE is a project funded by the European Union under contract IST “ARDA input for the testing coordination meeting” Massimo Lamanna CERN, 7.
Last update: 27/02/ :04 LCG Early Thinking on ARDA in the Applications Area Torre Wenaus, BNL/CERN LCG Applications Area Manager PEB Dec 9, 2003.
CERN openlab Phase 5 Preparation (Technical) Alberto Di Meglio CERN openlab CTO office.
Last update: 03/03/ :37 LCG Grid Technology Area Quarterly Status & Progress Report SC2 February 6, 2004.
EGEE is a project funded by the European Union under contract IST ARDA Project Status Massimo Lamanna ARDA Project Leader NA4/HEP Cork, 19.
ATLAS Distributed Analysis Dietrich Liko IT/GD. Overview  Some problems trying to analyze Rome data on the grid Basics Metadata Data  Activities AMI.
Site Services and Policies Summary Dirk Düllmann, CERN IT More details at
EGEE is a project funded by the European Union under contract IST “The LCG ARDA prototypes” Workshop summary Organised by ARDA and the gLite.
Organisation of HEP Applications within NA4 F Harris (Oxford/CERN) EGEE is proposed as a project funded by the European Union under contract IST
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
ALICE Physics Data Challenge ’05 and LCG Service Challenge 3 Latchezar Betev / ALICE Geneva, 6 April 2005 LCG Storage Management Workshop.
EGEE is a project funded by the European Union under contract IST “ARDA status” Massimo Lamanna / CERN LCG-SC2, 13 August
EGEE is a project funded by the European Union under contract IST “The ARDA project: status report” Massimo Lamanna LCG PEB, 1 June
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
EGEE is a project funded by the European Union under contract IST “The ARDA project” Massimo Lamanna / CERN on behalf of the LCG-ARDA project.
Process 4 Hours.
Bob Jones EGEE Technical Director
Status of Task Forces Ian Bird GDB 8 May 2003.
Regional Operations Centres Core infrastructure Centres
EGEE Middleware Activities Overview
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
Joint JRA1/JRA3/NA4 session
EGEE Review: Application Assessment of gLite
INFN-GRID Workshop Bari, October, 26, 2004
F.Carminati Geneva, February 13, 2003
N.B. Please always use EGI-InSPIRE templates!
Programme Board 6th Meeting May 2017 Craig Larlee
Savannah to Jira Migration
Thoughts on Applications Area Involvement in ARDA
Workshop Summary Dirk Duellmann.
LCG Operations Centres
LCG middleware and LHC experiments ARDA project
WP1 INERTIA Framework Requirements, Specifications and Architecture
LCG Operations Workshop, e-IRG Workshop
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Profiling in Switzerland Costs and benefits
Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002
SEAL Project Core Libraries and Services
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

The ARDA Project status report Massimo Lamanna CERN 12 September 2018 M. Lamanna “The ARDA project”

Purpose of this meeting Project plan Explain what contains and should contain Get a green light today? Rediscuss in May after the first milestone (detailed project definition) Status of the interaction with the experiment Logistics 12 September 2018 M. Lamanna “The ARDA project”

ARDA working group recommendations New service decomposition Strong influence of Alien system Role of experience, existing technology… Web service framework Interfacing to existing middleware to enable their use in the experiment frameworks Early deployment of (a series of) prototypes to ensure functionality and coherence EGEE Middleware ARDA project 12 September 2018 M. Lamanna “The ARDA project”

End-to-end prototypes Provide a fast feedback to the EGEE MW development team Avoid uncoordinated evolution of the middleware Coherence between users expectations and final product Guarantee the experiments are ready to benefit from the new MW as soon it becomes available Expose the experiments (and the community in charge of the deployment) to the current evolution of the whole system, to be prepared to use it in the best and quickest way Move forward towards new-generation real systems Prototypes should be exercised with realistic workload and conditions (experiments absolutely required for that!) No academic exercises or synthetic demonstrations A lot of work (and useful software) is involved in current experiments data challenges: this will be used as a starting point Adapt/complete/refactorise the existing: we do not need another system! Collaborative effort (not a parallel development) Commonality is not ruled out, but it should emerge and become attractive for the experiments. Anyway not imposed “from outside” Many users are absolutely required 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” Project plan One prototype per experiment Formally, the project starts April the 1st Preparation phase already started Same pattern being proposed to each experiments Interfacing to EGEE MW Direct contribution into experiment-specific “Upper Middleware” Focused dedicated effort to be added to the experiment system Not a demonstration system to be added to the experiments plans Mainstream activity Milestone Date Description 1.x.1 May 2004 E2E x prototype definition agreed with the experiment 1.x.2 August? 2004 E2E x prototype using basic EGEE middleware 1.x.3 November? 2004 E2E x prototype improved functionality 1.x December 2004 E2E prototype for experiment x, capable of analysis 2.x December 2005 E2E prototype for experiment x, capable of analysis and production 12 September 2018 M. Lamanna “The ARDA project”

ARDA Project first set up LCG: Project leader (Massimo Lamanna/CERN) 4 LCG staff (100% at CERN) matching the 4 EGEE staff 1 more staff from LCG (100% at CERN) About 3 FTEs from other sources (not always at CERN) EGEE: 4 NA4 staff (Already selected. 3 persons start on April 1st, the fourth one on May the 1st) Experiments: 4 experiments interfaces Represent the experiments in project definition, implementation and evaluation Identify and coordinate the experiment contributions analysis groups in the experiments with whom the middleware people can work to specify the services and validate the implementations “upper middleware” teams (experiment-specific MW) Users Exp.System 12 September 2018 M. Lamanna “The ARDA project”

Experiment interfaces Piergiorgio Cerello (ALICE) David Adams (ATLAS) Lucia Silvestris (CMS) Ulrik Egede (LHCb) 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” E2E prototype team ALICE A. Peters and D. Feichtinger ATLAS D. Liko and F. Orellana CMS J. Andreeva and J. Herrala LHCb A. Maier and J. Moscicki LCG B. Koblitz and M. Lamanna Russia (1 FTE? + some extra via NA4-experiments?) Taipei (2 FTEs) Assignments agreed with All people already in contact and the experiments both the team with the experiments 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” ALICE Redo the SC2003 system (clear task). On the other hand, not much discussion yet (interface just nominated). Derek Feichtinger already in contact with ALICE/Alien/Proof (before the start of the project) Ready to start as soon PDC04 finishes 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” ATLAS Unclear situation  GANGA is an important (but not essential) element, but the overall strategy has not been defined yet. DIAL and PROD systems are important and parts of ATLAS push to find a place for those in their prototype. Frederik Orellana already in contact with ALICE/Alien/Proof (before the start of the project). Unclear. Could be in delay even at the level of milestone 1.2.1 (Project definition). 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” CMS Not clear yet. Very interested to have a new RefDB in the programme of work. This could fit FNAL interests. Constructive relation with GAE. Incremental approach understood (very good relationship with the experiment interface) Juha Herrala in strong contact with the experiment. Still in the learning phase. Decision phase still going on. 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” LHCb GANGA chosen as primary system for LHCb. GANGA now provides a GUI with helper functionality (batch submission, basic job splitting, basic job merging?). Interest to continue to use DIRAC for production activities (mainly as a middleware layer). Objectives of GANGA aligned with the ARDA project (U.Egede; presentation in the last GANGA workshop) Very good contacts with the GANGA development team: Kuba Moscicki already an effective collaborator. Basically ready to go 12 September 2018 M. Lamanna “The ARDA project”

ARDA @ Regional Centres “Deployability” is a key factor of MW success A few RCs (2?) will have the responsibility to provide early RC installation for ARDA Understand “Deployability” issues Extend the ARDA test bed The ARDA test bed will be the next step after the most complex “EGEE Middleware” test bed Stress and performance tests could be ideally located in some RCs This is for experiment-specific components (e.g. a Meta Data catalogue) Leverage on RC local know how Good contacts with MSU-Dubna and Taipei Many others interested 12 September 2018 M. Lamanna “The ARDA project”

Coordination and forum activities The coordination activities would flow naturally from the fact that ARDA will be open to provide demonstration benches Since it is neither necessary nor possible that all projects could be hosted inside the ARDA experiments’ prototypes, some coordination is needed to ensure that new technologies can be exposed to the relevant community Transparent process ARDA should organise a set of regular meetings (one per quarter?) to discuss results, problems, new/alternative solutions and possibly agree on some coherent program of work. The ARDA project leader organises this activity which will be truly distributed and lead by the active partners 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” Logistics Office space Slow but moving (target = bd. 510 first floor) Maybe the space for new people before April 15th  “All” space at the end of April  Good perspective to get the whole bd. 510 first floor  Excellent collaboration and help from John Harvey (Thanks!) Contracts All are starting April the 1st but A. Maier  (Agreed as much it was possible with the previous “employers”. Experiments coordinators always in the loop) FZK persons are becoming/will be hired as CERN Fellows (J. Herrala and B. Koblitz) 12 September 2018 M. Lamanna “The ARDA project”

M. Lamanna “The ARDA project” LCG FTEs I assume that the LCG persons (former EP/SFT) are entirely in the project J. Herrala: ~100% Kuba Moscicki: hand over present activities (~10%) Discussed with Dirk (agreement to discuss in the PEB) Dirk will miss ~50% FTE for collections Kuba task requires 100% of effort D. Feichtinger and F. Orellana: Manno’s duties (~20%?) 12 September 2018 M. Lamanna “The ARDA project”