Test beam setup: status report 10/02/2009

Slides:



Advertisements
Similar presentations
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
Advertisements

1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
RD51 test SPS/H4: experimental area hazards and operational procedures (preliminary version, to be discussed with Safety Experts) Matteo Alfonsi.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
East Area Upgrade Requirements from ALICE A.Tauro.
RD51-WG VI 28/04/2009M. Alfonsi (CERN)1 RD51 common test beam: specifications and installation status Matteo Alfonsi (CERN)
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
H.TauregTechnical Forum June B and T monitoring News on B field mapping B field monitoring Temperature monitoring.
Update for muon studies Helmut Vincke. Additional dump calculations Two options were studied: Option 1: beam is bend by 2 degree towards soil and beam.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
WG7 summary 5 th RD51 Collaboration Meeting in Freiburg WG7 summary M. Alfonsi (CERN)
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Design Update Puck and Gun Magnet February 16, 2016.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Magnetized Beam LDRD: Design Tasks February 19, 2016.
N_TOF EAR-1 Simulations The “γ-flash” A. Tsinganis (CERN/NTUA), C. Guerrero (CERN), V. Vlachoudis (CERN) n_TOF Annual Collaboration Meeting Lisbon, December.
DCal-ALICE integration and installation plan and status A. Tauro.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Preliminary Design of a Magnetic Measurement System for the Detector and Production Solenoids of the Mu2e Experiment Charles Orozco University of Illinois,
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
H4 beam line for GIF Adrian Fabich, EN-EA-LE GIF users meeting, 17 th February 2016.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
The Status of the CBM Experiment
Status of the forward tracker design
Rachel Margraf Supervisor: Nikolaos Charitonidis
Heating and radiological
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
STRAW TRACKER SYSTEM CAD STATUS :
Test Beam Request for the Semi-Digital Hadronic Calorimeter
E. Noah, A. Blondel, P. Benoit, F. Cadoux, A. Dudarev, L. Nicola, H
VELO-installation meeting CERN, January 17, 2006
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
RD51-WG X June test beam experience: useful information for October
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
n_TOF “Draft” plans for YETS and LS2
DESY Test Beam Facilities - Status and Plan
G. Carboni for the Muon Group
Target and Horn status report
DAMPE Status (T9) Steadily taking data since last Thursday
Renovation of the 45-year old PS magnets
Pierre-Alexandre Thonet
CERN Testbeam facilities
MDL0L02 Dipole Field July 6, 2016.
OT Survey & Adjustment Outline: Survey technique at present
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
PS2 Injection/Extraction Layout
Updated concept of the CBM dipole magnet
Hall C SHMS & Configuration Status
Status Report and highlights from workshop II
East Hall under construction
Polarized 3He target installation
Presentation transcript:

Test beam setup: status report 10/02/2009 M. Alfonsi (CERN)

Outline Test schedule Infrastructures Magnet Mechanics inside the magnet Mechanics outside the magnet 20/01/2009 M. Alfonsi - CERN

Test beam schedule at SPSC Schedule is not final. We asked to move a bit later (June-July) the first period to avoid the overlap with Crete. It is possible that some days will be lost. Expected beam type: 150GeV/c negative pions, max 107 per spill (~10s). No dump before the area  no low muon rate for working inside 20/01/2009 M. Alfonsi - CERN

Infrastructures: cables & barracks Goliath magnet Barracks are HNA343, HNA348. Two available racks, more if required. Shorter cables (12-15m) to arrive to the zone downstream Goliath, longer (20-25m) to arrive upstream Goliath 20/01/2009 M. Alfonsi - CERN

Infrastructures: gas Fenced area below barrack Goliath magnet 4 lines 30m (stainless steel, 6/4mm outer/inner diameter). Cost ~ 800 CHF + 600 CHF for cleaning Premixed bottle or main distribution? Flammable mixture should be allowed 20/01/2009 M. Alfonsi - CERN

Goliath dipole magnet Magnet with the actual PS arrives to 1.4T Main coil (Goliath) tested last december The whole system (Goliath+David) will be tested next March: this is an opportunity to measure also the fringe field and to check the effect on the PMTs We have the field map but the file must be decoded Height = 1.06 m R = 1.70 m Front opening = 2.40 m 20/01/2009 M. Alfonsi - CERN

Support mechanics inside Goliath We may ask a borrow of the old NA57 mechanics, if suitable. If we have to do it ourself, some warnings arrive from NA57 experience: in particular if the coil current drops fast (e.g. failure), parassitic currents are induced in a metallic mechanics, pushing the setup out of the magnet 20/01/2009 M. Alfonsi - CERN

Support mechanics outside We may ask if old ALICE marble table is available as well. SPS can provide us precision rails that can move on the side our setup when we have to leave the beam line to other users 20/01/2009 M. Alfonsi - CERN

Conclusions The schedule is not yet final: overlap with Crete must be avoided Barracks, gas area, cable/pipes routing are defined. Participation in magnet test in March We can count on SPS help for mechanics, maybe we may borrow some mechanics from old H4 users 20/01/2009 M. Alfonsi - CERN