Triple-GEM setup at the GIF++

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

© the Design and Technology Association Health and Safety Training Standards in Design and Technology S8HS PLANER/THICKNESSER MACHINE Specialist Extension.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
ALICE-VHMPID collaboration meeting, CERN, Technical matters. G. Bencze ALICE-Budapest meeting, p.1 Contents I.Politicsp. 2 II.Integrationp.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Gamma Irradiation Facility RFortin_ PH-DT-DI GIF Users Meeting April 30, 2009 Richard G. Fortin 1 / 10 Upgrading to a GIF++
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
ALIGNMENT OF THE NEW TRIPLETS
GSI Test Preparation Visit to GSI october 12 Installation plan agreed
TS2 preparatory meeting
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
General aspects: Optical links :
VELO-installation meeting CERN, January 17, 2006
RD51-WG X June test beam experience: useful information for October
LS2 LHC forward experiments
NA61 news and plans News from other labs/experiments
A very first look at siting issues
Cosmic Ray Tracker and Detector Control System at the GIF++
Home Safety for Seniors
Magdalena Kowalska, CERN PH-SME-IS
Resident Physics Lectures
Phase 2 R&D – Brief Introduction –
CNGS Project Overview Konrad Elsener.
Beam Dump Experiments with Photon and Electron Beams
(On Behalf of CMS Muon Group)
T-489: Induced Activity and Residual Dose Rates
LHC LUMINOSITY (RATE) MONITORS
East Hall under construction
Some of the Points Raised During my JLAB Visit
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

Triple-GEM setup at the GIF++ M. Abbas, M. Bianco, M. Gruchała, F. Fallavollita, J.A. Merlin, A. Sharma on behalf of the CMS-GEM group

Installation of new setup for triple-GEM aging test @ the GIF++ facility Preamble Goal of the tests Requirements: Space / location Time in the bunker Services Setup layout and possible interferences Installation in the bunker

Preample Triple Gem detectors already exposed in the GIF++ facility from April 2014 to beginning 2016. Aging test to validate the triple-GEM technology for the GE1/1 project. ~ 60 mC/cm2 collected in about 12 months of continuous tests Tests performed by J.A. Merlin with a dedicated setup located in the D1 position D1 Position for new triple-GEM setup already approved in Nov 16

Goal of the new tests Validate the triple-GEM technology for the ME0 detectors 240 mC/cm2 expected to be collected in the ME0 triple-GEM chambers in 10 years HL-LHC

Triple-GEM setup requirement Space: New setup has been designed and is in preparation to host the triple-GEM chambers Setup smaller and “more light” w.r.t. what has been used in 2014/2016 test Footprint reduced to about 52x52 cm from about 57x70 cm ( to fit in the actual available space) Access to the setup at least from one side, preferable from the right side, to perform weekly or biweekly test Position in the bunker D1, as in 2014/2016 test

Triple-GEM setup requirement Time: Goal is to integrate at least 240 mC/cm2, ME0 expected integrated charge (no safety factor) From the past experience about 3 years are needed to reach this value, assuming standard GIF++ duty cycle If safety factor 2 will become mandatory extension of the exposure time will be necessary No use of the beam is foreseen during these aging tests

Triple-GEM setup requirement Services: All the services needed to run the triple-GEM setup, at least for the first period are in place, (gas/HV/LowVoltage/Electronic Crate), services developed and installed for the old setup will be re-used

Setup and possible interferences To avoid (or limiting) interferences with setups actually present in the GIF++ small and light setup has been designed Foot print ~ 52x52 cm Electronics located in lower part ( No source shielding effect, the electronics will be located outside the cone of the source) Fully integrated and moveable setup to easily remove it from the bunker when needed

Setup and possible interferences ~67 cm ~50 cm Closest setup actually located at 50 cm from the fence located around the source Closest chamber at ~67 cm from the fence, not necessary to move the chamber, enough to re-adjust the feet of the setup Maybe easier to move back the setup of about 2-3 cm

Setup and possible interferences Space available behind the first actual first setup 19 cm Lead shielding actually present on the floor

Setup and possible interferences Access to the setup is needed at least from one side, for weekly measurements, preferable from the right side (looking to the source) Possible access Best Side Possible access

Installation in the bunker Due to the foreseen source maintenance, expected in the end of March, we avoid to move inside the bunker the setup during the first weeks of March Best time windows the first available day after the source maintenance and re-commissioning of the system; 31th March? Contact person for this setup will be: M. Gruchała (CERN phone number 167652) and F. Fallavollita (CERN phone number 160705) both CERN doctoral students