CBP SG Van Closing Report

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
PWG Instructions for the WG Chair At Each Meeting, the Working Group Chair shall: Show slides #2 and #3 of this presentation Advise the WG membership that:
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Siemens, Roke Manor (Recording Secretary )
Siemens, Roke Manor (Recording Secretary )
TGp Opening Date: Authors: January 2007 Month Year
11k Seattle 3 Agendas Date: Authors: September 2005
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
[ Interim Meetings 2006] Date: Authors: July 2005
11k Vancouver Ad Hoc Agenda
Instructions for the WG Chair
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGp September Opening Presentation
ADS Study Group Agenda Date: Authors: January 2005
November Opening Report
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
TGu Agenda Date: Authors: March 2006 March 2006
Siemens, Roke Manor (Recording Secretary )
TGu Agenda Date: Authors: January 2006 January 2006
Wireless Next Generation (WNG) Agenda
TGn PSMP Adhoc Group Dallas Opening report
LB73 Noise and Location Categories
March 2005 Opening Report Date: Authors: March 2005
TGy draft 2.0 with changebars from draft 1.0
TGu Ad Hoc Agenda Date: Authors: February 2007
IEEE r: Fast BSS Transition TG Agenda
November 2005 Opening Report
TGn PSMP Adhoc Group Dallas Opening report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Agenda Date: Authors: March 2007 March 2007
Siemens, Roke Manor (Recording Secretary )
July 2005 Opening Report Date: Authors: July 2005 July 2005
Report of TGv – September 2006
TGu Agenda Date: Authors: March 2006 March 2006
TGu Agenda Date: Authors: March 2006 March 2006
[place presentation subject title text here]
TGu Ad Hoc Agenda Date: Authors: April 2007 April 2007
TGu Agenda Date: Authors: January 2006 January 2006
May 2005 Opening Report Date: Authors: May 2005 May 2005
Report of TGv – September 2006
Questions to the Contention-based Protocol (CBP) Study Group
TGu Ad Hoc Agenda Date: Authors: February 2007
TGu Agenda Date: Authors: January 2007 January 2007
CBP SG Denver Closing Report
CBP SG Van Closing Report
IEEE r: Fast BSS Transition TG Agenda
IEEE r: Fast BSS Transition TG Agenda
TGu Agenda Date: Authors: March 2006 March 2006
IEEE IPR Policy Date: Authors: March 2006 March 2006
CBP SG Denver Closing Report
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
IEEE r: Fast BSS Transition TG Agenda
WNG SC Opening Report Date: Authors: Name Company Address
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Report of TGv – January 2007 DATE: January 2007 Author(s) January 2005
March 2005 Mesh Agenda Authors: February 2005 Date:
Presentation transcript:

CBP SG Van Closing Report November 2005 doc.: IEEE 802.11-05/1202r0 November 2005 CBP SG Van Closing Report Date: 2005-11-18 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

November 2005 doc.: IEEE 802.11-05/1202r0 November 2005 Abstract CBP-SG Presentations, Decisions, Motions in chronological order References Motion Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

Agenda November 2005 Contention-Based Protocol Study Group Agenda Review EC, WG comments on PAR, 5 Criteria documents Develop plans for work after Plenary closes * SG Meeting Call to Order Chair * Appointment of SG Recording Secretary Chair/All * Review of IEEE/802 and 802.11 Policies and Rules Chair MI Approve or Modify Agenda Chair/All MI Review and approve minutes of September interim meeting Chair/All II Chair’s Status Update and Review of objectives for the session Chair DT Call for Submissions, Presentations Chair DT Review of WG comments submitted to EC and draft responses All MI Review and approve minutes of teleconferences since July meeting Chair DT Presentations, discussion Chair/All DT Proposed SG/TG plans All M Motions for Working Group * Adjourn Chair * - consent agenda All agenda items are General Orders, i.e. time is not fixed, unless otherwise noted Recess and adjournment times are fixed. Peter Ecclesine, Cisco Systems

Instructions for the WG Chair November 2005 doc.: IEEE 802.11-05/1202r0 November 2005 At Each Meeting, the Working Group Chair shall: Show slides #1 and #2 of this presentation Advise the WG membership that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early disclosure of patents which may be essential for the use of standards under development is encouraged; Disclosures made of such patents may not be exhaustive of all patents that may be essential for the use of standards under development, and that neither the IEEE, the WG, nor the WG Chairman ensure the accuracy or completeness of any disclosure or whether any disclosure is of a patent that, in fact, may be essential for the use of standards under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing advice was provided and the two slides were shown; That an opportunity was provided for WG members to identify or disclose patents that the WG member believes may be essential for the use of that standard; Any responses that were given, specifically the patents and patent applications that were identified (if any) and by whom. Peter Ecclesine, Cisco Systems (Not necessary to be shown) Approved by IEEE-SA Standards Board – March 2003 (Revised March 2005) 2004) Peter Ecclesine, Cisco Systems

IEEE-SA Standards Board Bylaws on Patents in Standards November 2005 doc.: IEEE 802.11-05/1202r0 November 2005 6. Patents IEEE standards may include the known use of essential patents and patent applications provided the IEEE receives assurance from the patent holder or applicant with respect to patents whose infringement is, or in the case of patent applications, potential future infringement the applicant asserts will be, unavoidable in a compliant implementation of either mandatory or optional portions of the standard [essential patents]. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent or patent application becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either: a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement either mandatory or optional portions of the proposed IEEE standard against any person or entity complying with the standard; or b) A statement that a license for such implementation will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination. This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Slide #1 Peter Ecclesine, Cisco Systems Approved by IEEE-SA Standards Board – March 2003 (Revised March 2005) Peter Ecclesine, Cisco Systems

Inappropriate Topics for IEEE WG Meetings November 2005 doc.: IEEE 802.11-05/1202r0 Inappropriate Topics for IEEE WG Meetings November 2005 Don’t discuss the validity/essentiality of patents/patent claims Don’t discuss the cost of specific patent use Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions, or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/board/pat/index.html This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt Slide #2 Approved by IEEE-SA Standards Board – March 2003 (Revised March 2005) Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

November 2005 Wednesday morning xx Attendees, yy indicated 802.11 is primary affiliation Security of meeting space, Dot 11 attendance recording 7:30-17:30 Presentation of reference material, including minutes of Interim session Approval of minutes of Interim session 05/936r0 Discussion of 80216-05_084.pdf and Draft CBP PAR 05/565r3 and Five Criteria Draft 05/351r4 Peter Ecclesine, Cisco Systems

November 2005 Thursday morning Review and approval of teleconference minutes 24 August 05/847r1, 19 October 05/1041r0, 2 November 05/1056r0 Peter Ecclesine, Cisco Systems

References November 2005 11-05-0223-00-3650-3700-mhz-fcc-action.ppt FCC Memorandum, Opinion and Order on 3650-3700 MHz use (05-56) http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-05-56A1.pdf Cognitive Radio Report and Order (05-57) http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-05-57A1.pdf Document on FCC rules for other bands 11-05-0328-01-0000-cordination-contention-interference-resolution.doc Comments from NTIA on the 3.1-3.7GHz band and sharing with government users http://www.ntia.doc.gov/osmhome/reports/ntia99-361/ntia99-361.pdf Economic aspects of spectrum sharing. http://www.aei-brookings.org/events/page.php?id=143 Peter Ecclesine, Cisco Systems

References (continued) November 2005 References (continued) Minutes for the telecons: 11-05-0331-00-0000-cbp-sg-telecon-minutes-6-april.doc 11-05-0336-00-0000-cbp-sg-telecon-minutes-13-april.doc 11-05-0344-01-0000-cbp-sg-telecon-minutes-20-april.doc 11-05-0349-01-0000-cbp-sg-telecon-minutes-27-april.doc 11-05-0556-01-0000-cbp-sg-telecon-minutes-4-may.doc 11-05-0527-02-0000-cbp-sg-telecon-minutes-25-may.doc 11-05-0564-00-0000-cbp-sg-telecon-minutes-8-june.doc 11-05-0604-00-0000-cbp-sg-telecon-minutes-15-june.doc 11-05-0616-00-0000-cbp-sg-telecon-minutes-22-june.doc 11-05-0671-00-0000-cbp-sg-telecon-minutes-13-july.doc 11-05-0847-01-0000-cbp-sg-telecon-minutes-24-august.doc 11-05-1041-00-0000-cbp-sg-telecon-minutes-19-october.doc 11-05-1056-00-0000-cbp-sg-telecon-minutes-2-november.doc Peter Ecclesine, Cisco Systems

References (continued) November 2005 References (continued) Minutes for the Sessions 11-05-0484-00-0000-cbp-sg-cairns-may-minutes.doc 11-05-0795-01-0000-cbp-sg-sf-july-minutes.doc 11-05-0936-00-0000-cbp-sg-gg-september-minutes.doc 11-05-0340-00-0000-cbp-sg-contention-based-protocol-and-802-16-qos.ppt 11-05-0351-04-0000-CBP-SG-Five-Criteria-draft.doc 11-05-0565-03-0000-CBP-SG-draft-PAR.doc FCC Staff Report Wireless Broadband 2005.doc 11-05-1039-03-0000-cbp-sg-candidate-requirements-and-objectives.doc Peter Ecclesine, Cisco Systems

CBP SG Motion Move To Moved: Seconded: Yes - No - Abstain - November 2005 CBP SG Motion Move To Moved: Seconded: Yes - No - Abstain - Peter Ecclesine, Cisco Systems