Aileen Sullivan Director, Performance Improvement, OPG October 2017

Slides:



Advertisements
Similar presentations
INITIAL ON BOARDING COACHING
Advertisements

Comprehensive Organizational Health AssessmentMay 2012Butler Institute for Families Comprehensive Organizational Health Assessment Presented by: Robin.
Arnhem Business SchoolJ.Vinke 2005 Human Resource Management (HRM) Plan guide on developing a practical HRM plan.
08/2009 The Benefits of Mentoring. Mentoring Mentoring has evolved in the workplace to be less about bosses grooming their handpicked successors to being.
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
Aligning Academic Review and Performance Evaluation (AARPE)
2010 MBNQA WINNER: K & N MANAGEMENT – SMALL BUSINESS CATEGORY PRESENTED BY: MOORE, YAGER, TODD, PEAVY.
© 2013 Cengage Learning. All Rights Reserved. 1 Part Four: Implementing Business Ethics in a Global Economy Chapter 9: Managing and Controlling Ethics.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
A Survey of Safety Culture DOE ISM Best Practices Workshop Lettie Chilson, West Valley Nuclear Services Company DOE ISM Best Practices Workshop Lettie.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Independent Office of Evaluation IFAD’s Approach to Evaluation of Agriculture programmes Presentation at ECD Workshop, Addis Ababa, 6 November 2015.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Internal Audit Quality Assessment Guide
Every one counts Our key measures of success will be satisfied patients and staff who feel positive about their work The values of the NHS Constitution.
Today’s managers & leaders are challenged unlike any of the past generations in their roles.
Leadership Development at Bruce Power
Facilitator/Trainer: Ben Ramsey GLM Management Consulting Group, LLC
Planning for Succession
Regulatory Information Conference (RIC)
Clinical Learning Environment Review GMEC January 8, 2013
Well Trained International
Performance Management and Employee Development
PSY 302 STUDY Imagine Your Future /psy302study.com
Enbridge Presentation to the NEB Modernization Expert Panel Edmonton, AB – Mar 7, 2017.
Systems Analysis and Design in a Changing World, 4th Edition
Updating the Regulation for the JINR Programme Advisory Committees
Performance Management System
INTEGRATING STUDENT SUCCESS THROUGHOUT YOUR COLLEGE: ARE YOUR SYSTEMS, PROCESSES AND EMPLOYEES ALIGNED?
Strategic Performance Management
ORGANIZATIONAL BEHAVIOR
Board Standards and School Board Self-Assessment
SAMPLE Foster an Effective Feedback Environment
HPI Leadership and Challenges
Safety Culture Services
What is performance management?
Presented by Robert Ford
Overview – Guide to Developing Safety Improvement Plan
MGT 498 EDU Lessons in Excellence-- mgt498edu.com.
MGT 498 TUTORIAL Lessons in Excellence -- mgt498tutorial.com.
Vision Facilitation Template
1/22/2015 A partnership/collaboration from Bayer through setting up and implementing a global FSP strategy on a local level Keith Francis, Strategic.
Overview – Guide to Developing Safety Improvement Plan
2017 On the Ball Initiative On the Ball is a collaborative HSE initiative designed to refresh and re-energise HSE , with the ultimate goal of achieving.
Managing Change and Other Keys to Successful Implementation
Multi-Sectoral Nutrition Action Planning Training Module
MOSH Leading Practices Adoption System
Adult and Community Learning Services (ACLS)
Metro-North Railroad Strategic Plan
On the Horizon: Excellence in Governance
Human Resources Management: Module 2
Engagement Follow-up Resources
Southwest Junior High School CICO Handbook
5. Impact Assessment World Café: Social impact assessment
Human Resource Management
Engagement Follow-up Resources
Engaging People : Performance Monitoring
120 Day Action Plan FOR SENIOR MANAGER, CALL CENTER OPERATIONS
Human Resource Management
An Update of COSO’s Internal Control–Integrated Framework
The Hub Innovation Program Evaluation Plan
Building Leadership Capacity Difficult Discussions
Building Leadership Capacity Difficult Discussions
2007 Faculty & Staff Denison Organizational Culture Survey
CHANGE IS INEVITABLE, PROGRESS IS A CHOICE
Employee Engagement Align ~ Link ~ Connect
Developing SMART Professional Development Plans
Aligning Academic Review and Performance Evaluation (AARPE)
Director, CPF Financial Services Limited
Presentation transcript:

Aileen Sullivan Director, Performance Improvement, OPG October 2017 Successful use of Nuclear Safety Culture Assessment to improve Nuclear Refurbishment Project Aileen Sullivan Director, Performance Improvement, OPG October 2017

Darlington Refurbishment The Darlington Refurbishment Program (DRP) is a multi-year, multi-phase mega-program to enable safe and reliable operation of Darlington until ~2055 Includes the replacement or rehabilitation of life-limiting components as well as upgrades to meet regulatory requirements Refurbishment of the four units will span 112 months, to February 2026, including 40 months for Unit 2 from October 2016 to February 2020 OPG has a high level of confidence in the DRP cost estimate of $12.8B, which includes contingency, capitalized interest and escalation According to the Conference Board of Canada, the construction phase alone is expected to generate $14.9 billion in economic benefits to Ontario. At its peak, refurbishment will create 11,700 jobs per year, with an average of 8,800 annually between 2014 and 2023. It is also expected to increase household revenues in Ontario by $8.5 billion.

DRP Economic Impact

Why did we decide to assess Nuclear Safety Culture Not a regulatory, project or company requirement Important to our CEO and Project Executive Team to: determine the safety culture established before project execution began to take proactive steps to improve attributes of the culture that need addressing Identify improvements needed to onboarding and nuclear safety training for the incoming large influx of a number of new to nuclear transient workers expected from the union halls in the first 6 months set a baseline to measure safety culture 1 year into execution – after workforce has increased by more than 50% - to detect any decline and to continuously strengthen the health of the culture Provide opportunity to listen to the workforce – internal and vendors – assess health of working relationships OPEX has shown that poor safety culture could negatively impact such a project Senior leadership value the process and its insights to improve culture

NSC Assessment Method Used same assessment method that was used to assess NPP Used INPO NSC survey based on 10 traits – validated survey with reference data Modified workgroups to include construction work groups/titles 4 week survey + interviews + focus groups + document/data review Paper and electronic survey due to large vendor workforce who did not have access to computers Diverse team make-up represented workforce Analysis done by organizational psychologist Interviews and focus group - >50% front line workers; representative sample of leaders and workers from the 9 companies/groups Reviewed 81 question survey (1,997 respondents), > 750 comments, > 90 interviews, 8 field observations and ~ 1500 data points Prepared set of questions for every trait and attribute – insights scored: Positive Observation if the behaviour or employee’s belief exceeds the expected industry standard Neutral Observation if the behaviour or employee’s belief meets the industry standard Negative Observation if the behaviour or employee’s belief is perceived by the assessor as not meeting industry standard Why did you decide to use the method you chose? How did you have to change? What training did you have to carry out? Used same assessment method that was used to assess NPP – also had reference group data for other vendor companies (INPO) Leaders already trained the process – used since 2003 – follow procedure Used INPO NSC survey based on 10 traits Modified workgroups to include construction work groups/titles 4 week survey + interviews + focus groups + document/data review Paper and electronic survey due to large vendor workforce who did not have access to computers – scheduled time for vendors to complete survey Senior VP – Fleet O&M as team leader, organizational psychologist – assistant team leader, internal and external members of team, accelerate candidates (development), new and experienced team members representing vertical slice of workforce including 1 person from each of 9 companies/groups represented (ownership of and input to the results) Analysis done by organizational psychologist – insights brought to assessment team during training day to help inform the interview and focus group part of the assessment Interviews and focus group - >50% front line workers; representative sample of leaders and workers from the 9 companies/groups Prepared set of questions for every trait and attribute – insights gleaned were scored – strength, meets standard, AFI 4 week survey, 2 weeks analysis, 1 week assessment, report out draft to Refurb team on Friday, communication to staff the following week and Nuclear Executive team a few weeks later Entered into self assessment system and action tracking system

NSC Assessment Method continued Presentation Title NSC Assessment Method continued For the purposes of the NSCA methodology the following terms are used exclusively in characterizing the issues and themes: Strength – A consistently demonstrated belief, action, or process; related to the organizations values or behavior that exceeds the industry norm as established in the related INPO traits and attributes. Positive Observation – Narrowly focused behaviours or attributes that the station is doing well, and may have the opportunity to leverage on a broader scale to improve safety culture or station performance. Weakness – A consistently demonstrated belief, action, or process; related to the organizations values or behavior, that does not meet the industry norm as established in the related INPO traits and attributes and requires aggressive management attention and correction. In most station self-assessment programs, a Weakness is the equivalent to an Area For Improvement. Negative Observation – A narrowly focused issue that is confined to a small sample of the population (that is a specific work group or level in the organization) and/or may represent a potential future performance deficiency which requires management attention. Preliminary Debrief to Refurb lead team on Friday Communication to staff the following week Draft report within 30 days and final report completed within 60 days to the Nuclear Executive team Entered into self assessment system and Refurb action tracking system Communicated results face to face with regulator Got feedback from team members and completed lessons learned self assessment Finding Definitions: For the purposes of the NSCA methodology the following terms are used exclusively in characterizing the issues and themes: Strength – A consistently demonstrated belief, action, or process; related to the organizations values or behavior that exceeds the industry norm as established in the related INPO traits and attributes. Positive Observation – Narrowly focused behaviours or attributes that the station is doing well, and may have the opportunity to leverage on a broader scale to improve safety culture or station performance. Weakness – A consistently demonstrated belief, action, or process; related to the organizations values or behavior, that does not meet the industry norm as established in the related INPO traits and attributes and requires aggressive management attention and correction. In most station self-assessment programs, a Weakness is the equivalent to an Area For Improvement. Negative Observation – A narrowly focused issue that is confined to a small sample of the population (that is a specific work group or level in the organization) and/or may represent a potential future performance deficiency which requires management attention.

Success Factors and Lessons Learned 1. Communication and Engagement success 93% response rate on NSC Survey – 9 companies/groups involved in the project, 1,997 respondents – HOW? Communication plan – SPOC for each of 9 companies/groups Weekly planning team meetings Met with unions to solicit their support Face to face and written communication – why it is important to the company and the project Survey responses went to INPO – anonymous survey – confidential Written and electronic responses Scheduled time for contractors to complete written surveys – sealed in envelope and went to an independent data entry group - confidentiality agreement – input data to INPO database Regular tracking of % complete with further communications and encouragement 2. Team make-up, training, mentoring, data entry support

3. Developing SMART action plans Selected a second team of key stakeholders – those who would own the actions through implementation and representation from the assessment team – Three 1/2 day facilitated workshop Divided into 5 teams – 1 per finding Brainstormed potential actions – prioritized top 3 Presented back to larger group – challenge panel Agreed top action themes to go after Groups developed SMART actions – measurable with who, by when Presented back to larger group + team leader/host sponsor Finalized plan and presented to Refurb Executive Team Results and action plan presented to Nuclear Executive Team Actions entered into Refurb Mngt Oversight database for tracking

4. Implemented some quick wins Show the organization that they were heard (entry system, working conditions, parking, blue card (employee concerns/suggestions) Established Nuclear Projects Nuclear Safety Culture Monitoring Panel Produced a handbook on NSC traits and rolled out to all Refurb staff/Trades. Conducted Leadership Alignment workshops to build on the Nuclear Safety Culture Assessment focusing on team work, behaviours and communications between all parties. Adopted daily nuclear safety culture message (before all meetings and start of shift) – replaced construction principles with safety attributes Added nuclear safety culture module to onboarding training Produced video from CNO and added to Nuclear General Training (CBT) 5. Follow-up survey and focus groups planned for Q1 2018 along with operating station