0.0 Instrument Suite Name Presenter’s name

Slides:



Advertisements
Similar presentations
ISIM Integration & Test Mike Drury JWST-PRES
Advertisements

GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Critical Design Review (CDR)
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Bill Raynor Naval Research Lab
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
SPF MAG Quarterly Report – Feb 2015
Solar Probe Plus FIELDS
I&T&C Organization Chart
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Solar Probe Plus FIELDS
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
FIELDS SCM Thermal iPER
FIELDS Keith Goetz Solar Probe Plus A NASA Mission to Touch the Sun
PHI Status Report SO Cleanliness Working Group #24
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Digital Sub-System Dorothy Gordon.
Integration, Test, and Verification
Thermal Vacuum Test: Plans and Procedures
Systems Engineering Bob Goeke.
Integration and Test Organization Chart
Mechanical/Thermal Systems
GLAST Large Area Telescope
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
Presentation transcript:

0.0 Instrument Suite Name Presenter’s name Presenter’s email Solar Probe Plus A NASA Mission to Touch the Sun 17-19 May 2016

Outline Block Diagram Changes Since Mission CDR PDR/CDR RFA Status Subsystem Status Test Flow GSE (Facilities and Equipment) Product Assurance Waivers & Deviations Anomalies & PFRs SOC status Summary Backup

Instrument/Suite Name Block Diagram 1 page

Instrument/Suite Name Changes since M-CDR 1 page Give each change (recommend table below) Give reason for change and provide impact, as appropriate, on resources of mass, power, size, telemetry, cost and schedule. Include any science requirement changes or add statement at bottom that there were no science requirement changes. Changes since M-CDR Reason for Change Impact on Resources

Instrument/Suite Name PDR/CDR RFA Status Review # RFA’s # Open # Closed # Concurred Due Date I-PDR I-CDR For any open action items, detail outstanding issues and path to closure

Instrument/Suite Name Subsystem Status ~ 6 pages Drawing Release Status Hardware Build Status Include schedule for completion of flight fabrication Software Status EM Test Results FM Test Results Verification Status Include burn-down curve showing expected verification closure Include burn-down curve showing requirements to be verified at system level (if any) FPGA Resources

Instrument/Suite Name Test Flow Flow chart(s) showing plans for the FM assembly, integration, functional and environmental testing (EMI, sniff, vibration, thermal balance, thermal vacuum, etc.), and calibration Major milestones in the I&T flow with dates

Instrument/Suite Name Ground Support Equipment 1-2 pages GSE (Facilities, Equipment, Software) Include status of GSE Examples: harnessing, handling/shipping fixtures, facilities, environmental test fixtures, ground software

Instrument/Suite Name Product Assurance Open Issues Including closure plan Waivers & Deviations (include any that are known about and not yet submitted) Anomalies & PFRs Type Approved Pending Pending Specifics Withdrawn Waivers Deviations

Instrument/Suite Name SOC Status 1 page

Instrument/Suite Name Summary 1 page

Instrument/Suite Name Backup

Instrument/Suite Name Backup – Test Procedures Title Status