Review of March 2013 Proposed Pars

Slides:



Advertisements
Similar presentations
CSD for P802.1AS-REV WG Wednesday, 05 November 2014.
Advertisements

Submission doc.: IEEE /0229r1 March 2015 Jon Rosdahl, CSRSlide PAR Review March 2015 Date: Authors:
Submission doc.: IEEE 11-10/0897r0 July 2014 Jon Rosdahl, CSRSlide PAR Review – July 2014 Date: Authors:
Submission doc.: IEEE r PAR Review July 2015 Date: July 2015 Jon Rosdahl, CSRSlide 1 Authors:
Submission doc.: IEEE 11-13/0333r1 March 2013 Jon Rosdahl, CSR Technology Inc.Slide Review of March 2013 Proposed Pars Date: Authors:
PAR and CSD for P802.1Qxx WG January PAR (1) 1.1 Project Number: P802.1Qxx 1.2 Type of Document: Standard 1.3 Life Cycle: Full Use 2.1 Title:
Submission doc.: IEEE 11-14/0319r1 March 2014 Jon Rosdahl, CSRSlide Proposed PAR Review March 2014 Date: Authors:
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Submission doc.: IEEE r PAR Review July 2015 Date: July 2015 Jon Rosdahl, CSRSlide 1 Authors:
CSD for P802.1Qcj WG January Project process requirements Managed objects – Describe the plan for developing a definition of managed objects.
IEEE Std revision P802.3REV includes merge of: –IEEE Std (minus Link Aggregation) –Approved amendments 802.3an, 802.3aq, 802.3as.
1 6/3/2003 IEEE Link Security Study Group, June 2003, Ottawa, Canada Secure Frame Format PAR: 5 Criteria.
Doc.: IEEE /1220r0 Submission November 2009 Jon Rosdahl, CSRSlide 1 WG11 Comments on PARs submitted Nov 2009 Date: Authors:
Doc.: IEEE /0904r1 Submission July 2012 Jon Rosdahl (CSR)Slide Review of July 2012 Proposed Pars Date: Authors:
Doc.: IEEE /1197r0 Submission November 2009 Jon Rosdahl, CSRSlide 1 Review 802 PARS under consideration for Nov Plenary Date: Authors:
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Submission doc.: IEEE 11-14/0319r0 March 2014 Jon Rosdahl, CSRSlide Proposed PAR Review March 2014 Date: Authors:
Submission doc.: IEEE 11-13/0789r0 July 2013 Jon Rosdahl, CSR Technology Inc.Slide Review of March 2013 Proposed Pars Date: Authors:
1 IEEE interim, Orlando, Florida, March, 2008new-nfinn-fast-chains-rings-par5c-0308-v1 Fast Recovery for Chains and Rings Proposal for PAR and 5.
Doc.: IEEE /0356r0 Submission March 2009 Jon Rosdahl, CSRSlide 1 New WG PARs that WG11 must consider in March 2009 Date: Authors:
Doc.: IEEE /0860r0 Submission July 2010 Jon Rosdahl, CSRSlide 1 Comments for p New PAR – July 2010 Date: Authors:
Doc.: IEEE /0236r0 Submission November 2009 Wendong Hu, STMSlide 1 Responses to Comments on PAR Modification IEEE P Wireless RANs.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Doc.: IEEE /1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 1 Feedback received on Revision PAR Date: Authors:
PAR Review - Agenda and Meeting slides - March 2016
Comments on WUR SG PAR and CSD
China MM-Wave (CMMW) Study Group Comments on aj PAR & 5C
VHT SG Report to EC Date: Authors: November 2008 April 2007
Response to Official Comments
PAR Review - Meeting Agenda and Comment slides - Vancouver 2017
PAR Review - Meeting Agenda and Comment slides - San Antonio 2016
Review of July 2013 Proposed Pars
PAR Review - Meeting Agenda and Comment slides - July Berlin
P802.11aq Waiver request regarding IEEE RAC comments
VHT SG PAR Feedback from Individuals
PAR Review - Meeting Agenda and Comment slides - Nov Orlando
Response to Comments Received on the a PAR and CSD
Submission Title: [SGLECIM PAR & 5C comment resolution November 2010]
IEEE MEDIA INDEPENDENT HANDOVER
<month year> Denver, March 2006
Privacy Recommendation PAR Proposal
Jul 15, /15/10 07/15/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report.
Proposed text for HTSG draft PAR and 5 Criteria
Proposed text for HTSG draft PAR and 5 Criteria
January 2014 doc.: IEEE /0084r0 March 2014
Feedback received on Revision PAR
Response to Comments on P802.22b PAR and 5C
<month year> Denver, March 2006
Comments on Sub 1 GHz license-exempt operation
comments on Pending 802 PARs – July 2011
July doc.: IEEE /0997r0 July Response to Comments received on the proposed a PAR and 5C Date: Authors: Gerald.
Comments for p New PAR – July 2010
Jul 15, /15/10 07/15/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report.
Proposed work items and timeline for the LC SG
PAR Review - Meeting Agenda and Comment slides - Vancouver 2017
March 2019 doc.: IEEE /r2 March 2019
Proposed Modifications to VHT60 PAR
Proposed Modifications to VHT60 PAR
PAR Review - Agenda and Meeting slides - March 2016
Comments for Rev PAR – July 2010 Plenary
Comments for Nov 2010 EC PAR proposals.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Response to PAR and 5C Comments.
IEEE Revision Timeline
March 2012 doc.: IEEE /0368r1 March 2012
Proposed Modifications to VHT60 PAR
Comments for Rev PAR – July 2010 Plenary
TGp Motions for Tuesday
<month year> doc.: IEEE < e> <May 2011>
Response to Official Comments
PAR Review SC – Closing Report – March 2015
Presentation transcript:

802.11 Review of March 2013 Proposed Pars doc.: IEEE 802.11-13/0333r0 March 2013 802.11 Review of March 2013 Proposed Pars Date: 2013-03-18 Authors: Jon Rosdahl, CSR Technology Inc. Jon Rosdahl, CSR Technology Inc.

March 2013 doc.: IEEE 802.11-13/0333r0 March 2013 Abstract Review of 802 WG PARS submitted for review during the March 2013 Session. Jon Rosdahl, CSR Technology Inc. Jon Rosdahl, CSR Technology Inc.

PARs under consideration March 2013 doc.: IEEE 802.11-13/0333r0 March 2013 PARs under consideration 802 - Standard for Local and Metropolitan Area Networks: Overview and Architecture - PAR modification request 802.1Qcb - amendment for Frame Replication and Elimination for Reliability - PAR and 5C 802.3bm - PAR modification Request & Updated 5C 802.3bq - amendment for 40GBASE-T, PAR and 5C 802.15.4p - PAR modification Request 802.21c - PAR Extension Jon Rosdahl, CSR Technology Inc. Jon Rosdahl, CSR Technology Inc.

March 2013 doc.: IEEE 802.11-13/0333r0 March 2013 802 PAR Modification 5.2 Is the change of capitalization of “Local Area Network”, “Metropolitan Area Networks”, and Personal Area Networks” consistent with the IEEE style guide? 5.2 – If Upper case of the other “Area Networks” then “Regional Area Networks” should be upper case as well. Jon Rosdahl, CSR Technology Inc. Jon Rosdahl, CSR Technology Inc.

March 2013 802.1Qcb Suggest Change to 7.1: “IEC 62439-3 defines high-availability mechanisms in automation networks, but it is restricted to ring topologies, whereas this amendment will work on all LAN topologies.” 7.1 It appears that PRP or RSTP in IEC 62439-3 are not limited to “ring topologies”. (See tutorial at http://www.gridwiseac.org/pdfs/forum_papers10/harad apre_gi10.pdf) Can you please explain why PRP and RSTP are not suitable solutions? Does the revision of 62439-3 make a difference? Jon Rosdahl, CSR Technology Inc.

March 2013 802.1Qcb – 5C Distinct Identity: Suggest change “provides fault tolerance” with “provides link or intermediate node failure tolerance”. Suggest change in b: “fault tolerance” with “link or intermediate node failure tolerance” Economic Feasibility: Suggested replacement of c: “The installation cost of enhanced VLAN bridges and end stations is expected to be similar to existing implementations”. Jon Rosdahl, CSR Technology Inc.

March 2013 802.3bm Remove first item #5.2 from 8.1 not necessary for a PAR modification (similar to the discussion we had last November with the two PARs 802.3 submitted. This will cause confusion with the NesCom review. 5.2 Scope of Standard states that it is for “twisted pair PHY types”. If you are changing the Scope of the project, would you not want to change the scope of the resulting Standard? 5.2.b – What is Energy Efficient Ethernet (EEE) really pointing to in IEEE Std 802.3-2012? What is the real difference between this and 802.3az? Is this a marketing term? Is this a reuse of MAC functions to put the PHY to sleep? Jon Rosdahl, CSR Technology Inc.

March 2013 802.3bq 4.2 and 4.3 – Suggest that the time between 4.2 and 4.3 should be at least 6 months. (per suggested NesCom conventions) Jon Rosdahl, CSR Technology Inc.

March 2013 802.15.4p 8.1 should only include a statement of what is being changed. i.e. “2.1 – Change Title to better communicate what features are in the standard .” Or something similar. Jon Rosdahl, CSR Technology Inc.

March 2013 doc.: IEEE 802.11-13/0333r0 March 2013 802.21c Section 2. Change “The draft has now 61% approval.” to “The draft is now 61% stable”….if it has not had 75% approval, then you are not able to do a recirculation ballot, but would be still trying to pass a Sponsor Letter Ballot. Jon Rosdahl, CSR Technology Inc. Jon Rosdahl, CSR Technology Inc.