Kazakhstan-Japan Center for Human Development 2000 - 2012 1.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
HEART TRANSPLANTATION
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
1 National Center for the Training of Bank Personnel of Ukraine.
ABTC Business Training & Consultancy 1 AZERBAIJAN BANK TRAINING CENTRE Knowledge path to successful business about ABTC July 01, 2008.
Target setting for the SEE 2020 strategy Jahorina, Bosnia and Herzegovina September 11 th
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Richmond House, Liverpool (1) 26 th January 2004.
1 © GDC Group Heat Solutions. Source; House Hold budget survey (2004/2005) Irish Heating Market.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
2 |SharePoint Saturday New York City
© S Haughton more than 3?
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
1. LEED-Registered Projects, 2013 Source: U.S. Green Building Council. LEED Building Project Directory (as of 12/31/2013). Calculations by CPWR Data Center.
1 Since 25/Jun/1879 ~ First issue 29/July/ The standing position Of the newspaper in Japan 2.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
8 2.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Universität Kaiserslautern Institut für Technologie und Arbeit / Institute of Technology and Work 1 Q16) Willingness to participate in a follow-up case.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
Week 1.
Number bonds to 10,
Let’s take a 15 minute break Please be back on time.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Fourth Quarter Oklahoma Data (October-December 2011)
Weekly Attendance by Class w/e 6 th September 2013.
Presentation transcript:

Kazakhstan-Japan Center for Human Development

2 2000: Record of Discussion Signed by Japanese and Kazakhstani Gov’t Project Start 2002: Opening Ceremony 2005: Phase I Completed / Phase II Started 2010: Phase II Completed / EDP Started

3 Number of participants: 3520 Number of business courses: 155 Number of participants of business courses in Japan: 113 Major Achievements for

KJC Enterprise Development Project Project Goal: Developing the HR in Private and Contributing the Market Economy Conducting the Courses on the Subject which Japan Has Rich Experience

Specific Area 5 1. Production and Quality Control: Kaizen 2. Energy Saving and Efficiency 3. HRM based on BSC

6

Major Events 7 Kaizen Forum (November 2011) Guru of Kaizen – Mr. Imai Masaaki (author of world bestseller «Kaizen: Key to success of Japanese companies») «From Lean to Green» under the sponsorship of Japan Tabacco International (JTI) number of participants: Astana-65, Almaty -59

Kaizen Forum, Astana 8

Major events 9 «Energy Saving & Efficiency» (June-July 2012) Training of energy auditors and energy managers (Astana, Almaty) Providing energy audit on 3 enterprises Acquaintance with Japanese technologies in the field of energy saving and energy efficiency Transference of energy audit equipment to Japan Center

10

Training in Japan 11 TopicTimeQuantity Production & Quality Management 5-16 декабря 2011 г.8 Practical BC in Japan16-27 January Marketing (training of Japan Center trainers) February HRM (training of Japan Center trainers) February Energy saving & Japanese Technologies 29 Jan. -2 Feb Production & Quality Management 30 June-16 July Energy saving and и energy efficiency 30 July -10 Aug

12

Success stories of companies - participants of KJC business courses «StroyClass» Ltd improvement of production processes, reduction of construction time, improvement of appartments quality (Bricklaying increased from 3 to 5 floors in a given period of time, increasing productivity by almost 60%)

Introducing 5S at construction sites Japanese Consultant in the company 14

Application of «5S» in construction sites 15

«Before» «After» 16

Success stories of companies - participants of KJC business courses «RG Brands» JSC Reducing changeover time from 52 minutes to 5 minutes; Increase of production efficiency by 70%; Reducing staff turnover at production from 80% to 13%.

KJC Seminars in “RG Brands” JSC 18