Planning and Prioritizing At-Grade Railroad Crossings

Slides:



Advertisements
Similar presentations
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Advertisements

City of Hubbard Transportation System Plan Update April 25, 2012.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
New I-65 Interchange at Worthsville Road Welcome!.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Office of Research and Development | Office of Railroad Policy and Development Dr. John Tunna Director Office of Research & Development Office of Railroad.
2015 GDOT PowerPoint Title Page
Presented by: David Jackson & Michael Snavely, Cambridge Systematics, Inc. Robert Calix, Los Angeles County Metropolitan Transportation Authority May 9,
Detroit Intermodal Freight Terminal (DIFT) Project AASHTO SCOWT October 13, 2011.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
“ROUNDABOUTS FIRST” POLICY IN NEW YORK STATE What is it and how did it get developed?
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Freight Advisory Committee May 13th, 2013 Ashley Probart Deputy Director Freight Mobility Strategic Investment Board At-Grade Rail Crossings.
Texas Freight & Rail Studies Mark Werner, P.E. Transportation Planning & Programming Multimodal Section.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
AASHTO ANNUAL MEETING STANDING COMMITTEE ON PLANNING BILOXI, MS OCTOBER 30, 2010 Potential Changes to STAA Planning Process and Performance Measurement.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
USA Parkway Project Welcome Public Information Meeting to the
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
THE DRAFT CAMPO 2040 REGIONAL TRANSPORTATION PLAN Mobile Meeting Presentation.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
Livingston County Transportation Connectivity Plan Final Report December 2013.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
Funding Localized Initiatives Developing a Programmatic Approach to Off-system Needs AMPO Annual Conference | October 23, 2014 Paul Flavien, Broward MPO.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Oregon State Rail Plan Update
FAST Phase I is a $500 million investment to:
Chelan County Transportation Element Update
32 Transportation Midway City 2016 General Plan
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
The I-465 West Leg Reconstruction Project
Downtown Valdosta Truck Traffic Mitigation Study
Boulder Junction Town Road Improvement Project
MASTER THOROUGHFARE PLAN AND STREET DEVELOPMENT STANDARDS
North Lamar Boulevard Project
NGTA Halton Planning and Public Works Committee
GREENHOUSE GAS EMISSIONS INVENTORY
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Public Workshop #1 August 18, 2010.
Technical and Public Advisory Committee Meeting #3
Draft Transportation Element September 6, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
FHWA Bicycle and Pedestrian Program
San Mateo Countywide Transportation Plan update
Interstate Operations Study Planning + Simulation
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Hillsborough MPO School Safety Study
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Capital Improvement Plans
MPO Board Presentation
Parks Highway Reconstruction: Lucas Road to Big Lake Road
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
2045 LRTP Overview United Way of St Johns County May 10, 2019.
VT Transportation Project Selection and Project Prioritization
Presentation transcript:

Planning and Prioritizing At-Grade Railroad Crossings Kevin Murphy Skagit Council of Governments

Skagit Council of Governments (SCOG)

Today’s Presentation Analyze impacts of rail traffic on transportation system Identification of needs/issues Prioritization process Data used Going from regional needs to project level

Skagit County Rail-Crossing Study

Skagit County Railroad Overview 56 at-grade crossings in Skagit County BN Mainline 2 oil refineries Major connection to Canada

Crossing Prioritization Criteria Gate-down time Impact to emergency services Accident history Vehicle queueing ADT

Existing and Future Gate-Down Times

Key Crossing Identification List of crossings narrowed to 12 key crossings Identify mitigation strategies Grade separation ITS strategies Crossing consolidation

Priority Crossings Added to Regional Transportation Plan One included in constrained project list, two in illustrative list Not necessarily the most-impacted crossings Feasibility Proximity to other crossings

Road-Rail Conflicts in Washington State

Study Purpose Legislative Direction Evaluate the impacts of prominent road-rail conflicts Develop a corridor-based prioritization process

Statewide Rail Crossing Study

Study Objectives Understand current and future mobility, community impacts, and safety problems Understand and apply state, local, and private policy interests Develop a criteria-based prioritization process

Overview of THE prioritization PROCESS Active Rail Line Publicly Accessible At-Grade Crossing Step 1 Filtering Step 2 Sorting

Screening Process Level 1 Level 2 Less detailed Identifies higher priority crossings Intent not to miss important crossings Level 2 More detailed More specific data Prioritizes most important crossings

Key Findings The road-rail conflicts at the Top 50 at-grade crossings are substantial and there are few funding sources to address them The prioritization results point to a significant need for additional funding to address crossing improvements The database and prioritization process provide a mechanism to compare and understand the magnitude of crossing improvement needs on a statewide basis

SCOG Cook Road Corridor Study

Cook Road Corridor Study Priority from Rail Crossing Study Multiple projects included in Regional Transportation Plan Significant existing and forecast congestion

Traffic Conditions

Short-Term Solutions Intersection operations analysis Simulations Feasibility assessment Installation of signals, increased freeway ramp capacity, increased roadway capacity

Long-Term Solutions Grade separation Major tradeoffs Operational analysis concerns Property taking concerns Constructability concerns Funding concerns

Long-Term Solutions

Summary Highest-ranked crossing is not necessarily highest priority Data exists but has challenges Important to maintain the data/tool Build in flexibility in criteria System effects difficult to assess regionaly or statewide

Upcoming Work Statewide SCOG - Cook Road Prioritization of rail-crossing projects Data base refinements Input of conflicts to regional plans SCOG - Cook Road Short-Term Projects seek funding PE for Long-Term in a couple years

Resources WA Joint Transportation Committee Road-Rail Study and associated links: http://leg.wa.gov/JTC/Pages/Road-Rail-Study.aspx SCOG Rail-Crossing Study: http://scog.net/transportation/skagit-rail-crossing-study/

Questions? Contact Information Kevin Murphy Executive Director Skagit Council of Governments 204 West Montgomery Street Mount Vernon, WA 98273 360.416.7871 kevinm@scog.net www.scog.net