Umbrella Implementation at the ESRF and affiliation database project

Slides:



Advertisements
Similar presentations
Slide: 1 Welcome to the workshop ESRFUP-WP7 User Single Entry Point.
Advertisements

Introduction on WP7/WP9 Dominique PORTE 29/05/2008 Menu What is WP7? What is WP9? Goal of the brainstorming Introduction on WP7/WP9.
RBA Securitisation System Technical Delivery Forum
Data Catalogue Service Work Package 4. Main Objective: Deployment, Operation and Evaluation of a cataloguing service for scientific data. Why: Potential.
1 Mouse Cases M.Ellis/Y.Torun Wednesday 31 st March 2004.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Discovery Phase: where do we go from here? Co-directors contact information: Dr. Maureen Powers, Department of Cell Biology,
Natural Disaster Management Project Pakorn Apaphant Project and Application Subgroup WGISS 24 DLR, Oberpfaffenhofen, German October 15-19, 2007.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
MyOcean2 WP4.4 ACTIVITIES UPDATE MyO2 ANNUAL REVIEW,CORK, 16 APRIL 2013.
PaNdata ODI Open Data Infrastructure INFRA : Data infrastructures for e-Science PaNdata-ODI will develop, deploy and operate an Open Data Infrastructure.
CRISP 2 nd annual meeting PSI; WP 16 CRISP M van Daalen, PSI 1 Mirjam van Daalen, Heinz Weyer, Björn Abt.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
7 th Umbrella Harmonisation Meeting Zürich Airport M van Daalen, PSI 1 Retrospection Umbrella.
Slide: 1 European Affiliation Database - Version: 2.0 (26/09/2012) - Group: MIS - Website Name Address Town Country DirectorCreatedType Budget NbVisits.
CRISP WP 17 1 / 2 Proposed Metadata Catalogue Architecture Document.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
EI Colorado TA Call: State Updates,Telehealth, Bridge Training, Reports & EI Database End of Year Cleanup August 4, 2016.
Division of Vital Records Business Updates October 11, 2016
AMICI WP1 – Management, coordination and dissemination
BENCH-CAN Internal evaluation 2nd semester
Pre-planning Planning to plan (and adapt) Implementation starts Here!
Budget JRA2 Beneficiaries Description TOT Costs incl travel
Project Center Use Cases Revision 2
Updating the Regulation for the JINR Programme Advisory Committees
REACH 2018 Find your co-registrants and prepare to register jointly.
7th Umbrella Harmonisation Meeting
Status Umbrella AAI Photon / Neutron community
Project Management Processes
CRISP WP16 F2F Meeting, RAL Sep 27
Preparations for REF 2020: MDS College Assembly
Post-Completion Optional Practical Training Information
Umbrella AAI Photon / Neutron community
Kåre Vassenden, Statistics Norway Tbilisi, 6 April 2016
Pandata Service Verification
Project Center Use Cases Revision 3
SPS FPDS-NG Integration: System Administration
PaNdata ODI WP3 User Catalogue and AAI Service
Key Information Summary (KIS)
Project Center Use Cases Revision 3
Davor Kozmus, MHEST Steering Platform Meeting 29. October 2009, Zagreb
Workshop on Census Data Processing Bangkok 15th – 19th September 2008
Project Charter I want to design a project
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
22 February, ITDG/DIME Item 2 – Progress and deployment
CLIENT RELATIONSHIP MANAGEMENT KEEPING TRACK OF REQUESTS THE EASY WAY
Informal document GRE-79-04
2011 POPULATION AND HOUSING CENSUS PREPARATORY WORKS
Vanda Nunes de Lima 18th June 2009
e-Infrastructure commons Updates
Portfolio, Programme and Project
What Is VQIP? FDA required to establish a program to provide for the expedited review of food imported by voluntary participants. Eligibility is limited.
IMPROVING PUBLIC INFORMATION
21 NOVEMBER 2018 FREE STATE PROVINCE
30 JANUARY 2019 PRIVATE HEALTH ESTABLISHMENTS
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
17 JANUARY 2019 MPUMALANGA PROVINCE
28 NOVEMBER 2018 PRIVATE HEALTH ESTABLISHMENTS
FCC study – Fire collaboration WP4 Status & Update
Port Back Data Collection & Transition
5.b3 Monitoring & Reporting 2019
e-Infrastructure commons Updates
Port Back Data Collection & Transition
WP6 – EOSC integration J-F. Perrin (ILL) 15th Jan 2019
Introduction Fact-Finding Meeting Proposal Meeting
HUD’s Coordinated Entry Data & Management Guide
Informal document GRE-79-xx
Module 1.1 Overview of Master Facility Lists in Nigeria
Report on CEOS Executive Officer functions
Presentation transcript:

Umbrella Implementation at the ESRF and affiliation database project Status ZURICH - Wednesday 13 June 2012 – D. PORTE – MIS group -

TID involved in TID DAY – “Together Everyone Achieves More” Frday 8 June 2012 – D. PORTE – MIS group -

TID involved in TID DAY – “Together Everyone Achieves More” Frday 8 June 2012 – D. PORTE – MIS group -

Overlap PaNdata-ODI IT Work Packages CRISP IT Work Packages CRISP WP16 PaNdata WP3 PaNdata-ODI IT Work Packages CRISP IT Work Packages Overlap CRISP WP17 PaNdata WP4 PaNdata WP7 AAA & Affiliation Data catalogue Fast data recording Stefan Schulze Julien Savoyet Benoit Rousselle Julien Savoyet Nicola Bessone A Demonstration Presentation - Version: 0.1 (19/08/03) - Group: Demo Group -

AAA & affiliation - Status: Authentication: Prototype using a VM clone of our current SMIS system - Affiliation database: Specification - Draft already exists Implementation of the authentication with the operational SMIS system: should cost a couple of weeks (with the necessary help of PSI) Implementation of the affiliation database: Long process described later on ZURICH - Wednesday 13 June 2012 – D. PORTE – MIS group -

LAD Facility A Facility B Facility C Local User/affiliation/proposals … database User applying to carry out an experiment LAD What does an affiliation database mean in the context of a European Virtual User Office? The affiliation of people (users) using a facility for an experiment corresponds to the laboratory from which they are authorized to carry out experiments. This information gives the facility the “professional” address of the users. It also opens up the possibility make statistics. It is important to notice that users may “work” for several laboratories at any given time same. April 24th 2012 CRISP 1st Annual meeting Dominique PORTE/ESRF

EAD LAD Facility A Facility B Facility C Local User/proposals … database Common affiliation database LAD EAD Sharing the same affiliation database between facilities will help scientists a lot. The user will no longer have to register the same information several times. In addition, an affiliation record will make sure that the spelling is the same at all facilities. April 24th 2012 CRISP 1st Annual meeting Dominique PORTE/ESRF

Affiliation database: - Status What we still have to do To complete the specification: - To meet facilities ready to participate in the very first common affiliation database. Is a workshop could help for that? - To agree on a common specification - To agree on a roadmap And also - Evaluate the cost and benefits of such a database A Demonstration Presentation - Version: 0.1 (19/08/03) - Group: Demo Group -

Thanks to the pre-study and our experience at the ESRF Cost Benefits We have already updated the database schema and data => More than 6 months of work, only half of the database is now up-to-date. Duplicate entries deleted or merged. Sharing the management of entries with other facilities. A Demonstration Presentation - Version: 0.1 (19/08/03) - Group: Demo Group -

Needs adoption (at least an information) at the ESRF Executive level Political aspects: Needs adoption (at least an information) at the ESRF Executive level Needs the involvement of the ESRF User Office Potentially needs the involvement of the ESRF communication unit A Demonstration Presentation - Version: 0.1 (19/08/03) - Group: Demo Group -

Potential difficulties To agree on a common database schema (same fields, same types, same design) Having enough resources to do the job A Demonstration Presentation - Version: 0.1 (19/08/03) - Group: Demo Group -

Two progressive and sequential phases implementation - Phase 1: Setup of an Establishment database - Phase 2: Addition of general interest fields - Workshop in September/October A Demonstration Presentation - Version: 0.1 (19/08/03) - Group: Demo Group -