Super FGD - Target Design

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
THERMO-MECHANICAL TESTS ON TRACKER LADDERS (Low temperature problem on plane 1) Status Report: D.Rapin Sept 26,2012 (help from Giovanni, Franck, Mingming,...)
CERN, the 9th of Nov FEA Updates on Structures (overall ID model) University of Geneva: G. Barbier, F. Cadoux, A. Clark, D. Ferrère, M. Weber.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
FTOF – CABLE RUNS Joe Guerra. Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing.
Irfu.cea.fr ATLAS-NSW SACLAY MMM WORKSHOP SIMULATIONS OF THE MM WEDGES WITH THE LAYOUT OPTION #3B of April 2013 Patrick PONSOT & Patrick GRAFFIN.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Current ILC work at Fermilab Electrical Engineering Dept.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Comparing 2D and 3D Structural Analysis Workshop 4.2.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
Mass production and mechanical structure P. Pakhlov (ITEP)
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
Main Electronics Package
UCLA - S.Sharafat: ITER TBM Dec. ’04 DCLL ITER-TBM: Design for Accident Relevant Loading Jaafar A. El-Awady, P. Rainsberry, S. Sharafat, and N. Ghoniem,
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
ROSIER Ph End cap – TPC - LC Arrangements of detectors on the active area of the end cap (1/2) Squares, rectangles, lozenge of 300/350 mm or.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
Comparing 2D and 3D Structural Analysis Winter Semester
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Camera Motion System Requirement Design Details FEA.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
EC: 7 DISK concept Preliminary considerations
Baby-MIND Modules & Services
T2K Upgrade First look at TPC constraints (WAGASCI)
Locking mechanics.
CEA Validation tests and constraints
HCAL preliminary analysis and results
New idea for the target detector: SuperFGD
Grid Pix Field Simulations and precision needed for a module
Are there better ways to build a stave?
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Micro Vertex Detector of PANDA Strip Detector
Composite Mirror Applications, Inc
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Chamber Design and Integration RE3/1 and RE4/1
Pressure vs height (solid CPA plane)
Design of the He and HB ODU
IFR detector mechanics
HCAL Modules -First Ideas
EC Assembling with Assembly Stand of THU
HERD Tracker Layout Considerations
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
After service guide for changing PCB
Presentation transcript:

Super FGD - Target Design Design Pre optimization Design issues Envelope definitions 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications Key numbers and assumptions (to start with…) Overall target size: 2m x 1.8m x 0.6m high Assumptions for CAD and FEA: scintillator cube is 15mm Optimization is mandatory / target height (tight clearances on Z )… less tricky on X / Y Try to simplify the FEA as much as possible (cubes vs equivalent pressure) Double symmetries are considered to limit the model size (same results!) Cubes are linked by friction (3 friction factors are considered: 0/0.5/1..) 400mm 300mm Only 2 layers shown Equivalent pressure Center of target 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications Don’t look at absolute deformations… size doesn't correspond to Target! ….Only for COMPARISONS! Friction factor is 0.5 Pressure model shows ≈20% over deformations / cubes Franck Cadoux, University of Geneva 02/10/2017

Super FGD Target Design_ FEA simplifications Friction factor is 0.0 Extreme cases with friction factors (0 and 1)… negligible effects (1 to 2% difference) Friction factor is 1 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications Only 2 layers shown In case of 20 layers of cubes… We keep the 20 % difference! A simplified model (equiv. pressure on the bottom plane) can be used for global target FEA (provide 20% margin in def!) 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications Only 2 layers shown In case of 20 layers of cubes… We keep the 20 % difference! A simplified model (equiv. pressure on the bottom plane) can be used for global target FEA (provide 20% margin in def!) 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications Full target: double symmetries (2m x1.8m x 0.6m).. A quarter model! 1000mm 900mm ¼ target total weight Each panel as a SANDWICH MATERIAL (Airex + CFRP skin, see next) 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications various sorts of CORE materials AIREX core material… AIREX is OK up to 50 Mrad (guess OK for T2K…) Transparency to particles, homogeneous in 3D, unlike the honeycomb… Easy Bonding, not brittle, shock absorption…light! Used in harsh environments 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications AIREX core material… 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications Full target: double symmetries (2m x1.8m x 0.6m).. A quarter model! 3.6mm in case of 20mm core / 2mm CFRP skins (meaning < 3mm if not pressure equiv.) 4.6mm in case of 1mm CFRP skins 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Target Design_ FEA simplifications Full target: double symmetries (2m x1.8m x 0.6m).. A quarter model! 1.4mm in case of 30mm core / 2mm CFRP skins (meaning 1.1mm if not pressure equiv.) 1.7mm in case of 1mm CFRP skins Stresses will be estimated with a more detailed mechanics… 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Design & Envelope constraints Design definition (and key numbers) 3 sides / 6 to be read out by siPM + electronics (bottom part is excluded) Sci Cube size and numbers: 15mm / 134 (X) x 121(Y) x 37 (Z)…leading to 599918 cubes!! Nearly 1.8 millions 1.2mm holes (3 per cubes) 2.5 Tons of scintillating material + mechanics and electronics… 26012 channels to be read out 2 m (X) 1.8 m (Y) 0.6 m (Z) 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Design & Envelope constraints Only a few holes (for Fiber insertion) are shown … To keep CAD from scratching! Each bottom corner will be equipped with bracket (for connection to basket frame) To be optimized / envelope constraint. 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Design & Envelope constraints 3 opposite planes will apply pressure to the cube assembly (thru “FOAM”) 3 NIDA planes to provide references: - X, Y and bottom Z 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Design & Envelope constraints Constraints on NIDA frames (screws are always needed… for panels connections) 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Design & Envelope constraints NIDA panel frame (to be seriously considered…) Needed for screw inserts + load transmissions AIREX core 02/10/2017 Franck Cadoux, University of Geneva

Super FGD Design & Envelope constraints Only the male part is shown Sci Fibre insertion and locking .. Connector design to be optimized (fab + integration) Clip system to connect the female part (incl. SiPM)… alla BabyMIND Key issue: back PCB (micro coax cable connection)… 20mm is needed for female + PCB+ connector 02/10/2017 Franck Cadoux, University of Geneva