DILO’s 2017 SF6 Gas Management Seminar Best Practices Dealing with Decomposition in Gas Insulated Equipment November 16, 2017 Neil Hutchins Equipment.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

General Safety Overview and Information
HazMat/WMD Awareness Appendix slide 1 Appendix A PERSONAL PROTECTIVE EQUIPMENT.
Personal Protective Equipment (PPE)
1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
Hazardous Chemical Spill Response and Containment Program
North Carolina Department of Agriculture and Consumer Services Pesticide Section Food & Drug Protection Division.
KBR / ITI TOTAL SAFETY TASK INSTRUCTION Employee Involvement Given at Task Location Every Task Every Day Exact Location where work is done: ______________________________________________.
PCOC Safety Committee 2001 CHEMICAL SPILL CONTINGENCY PLAN PURPOSE The purpose of this contingency plan is to protect your service personnel and the environment.
6/11/ Module 3 Safe Work Practices. 6/11/ Module 3 Overview — High risk practices to avoid — Safe work practices and safe work practices toolkit.
OSHA Safety and Health Regulations Related to SPF Applications Module Three: Personal Protective Equipment.
 MIOSHA Standard for Hazardous Work in Laboratories  Methods and Observations Used to Detect the Presence or Release of a Hazardous Chemical  Permissible.
Slide 1 UNCLASSIFIED Breaker Operation Arc Flash Breakout Group EFCOG Electrical Safety Workshop – July 18, 2014.
Module 3: PPE 3.4 Cleaning, Maintenance, and Replacement of PPE Susan Harwood Grant Number SH F-23.
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
Personal Protective Equipment An Employee Awareness & Training Course
Safety Tutorial for Physical Therapist Aids Theresa Carr Utopia High School.
Incident Reporting Procedure
9/30/ Module 3 Safe Work Practices. 9/30/ Video Segment: Safe Work Practices — Think about the following points as you view the video.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Welding and Cutting for construction. Welding safety program guidelines Person responsible Accountability and enforcement Job hazard assessment Special.
Version One Naturally Occurring Radioactive Material Awareness Training Course.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Induction training – the Environment. Introduction We take our environmental responsibilities very seriously. We believe this to be in the best interests.
May 7 th,  There’s a direct link to it from the Shimizu Lab Website or go to  All personnel are responsible for.
Electrical Safety, Subpart K
Structural HQ/Records Inspection Form 110
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
Visit us at E mail: Tele:
Accident analysis One-hour training.
ETP 2161C Week #1 HV Power Circuit Breakers (Text book ref.) This course will refer to the following text book, chapter and page #. Power Line Worker:
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
Mercury is a Hazardous Material
Non-Emergency HazMat Spill Response
Mold Awareness Training
PPE Maintenance & Care.
Chapter 9 Safety Permit Systems
SAFETY COMMON MACHINE SHOP HAZARDS
Chapter 2 – Safety in Welding
Issue Entry Permit Training.
Environmental and Safety Concerns with SF6 Gas
Insulating Gas Management Program
SAFETY COMMON MACHINE SHOP HAZARDS
Electrical Safety Equipment
SF6 Gas Decomposed! Special handling practices
Circuit Breakers & Reclosers
Hazardous Spills and How to Clean up the Mess
Do’s and Don'ts of SF6Gas Handling
Overview Key diagram of 220 KV Sub station, Ablowal Cables
Personal Protective Equipment
PPE Program 29 CFR OSHA requirement for this company to have a Personal Protective Equipment Program to protect employees from exposure to.
ELECTRICAL POWER-II Electrical engineering sixth semester
Sulfur Hexafluoride (SF6) Gas Handling
EPA Lead Certification Requirements
Part 2 – Control and Protection
CHEMICAL SPILL CONTINGENCY PLAN
TxMAG presentation
Presented by Environmental Health and Safety
SWITCH GEAR AND PROTECTION(IV-1) TOPIC-CIRCUIT BREAKER
Vehicle & Equipment Maintenance/Cleaning
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
Disaster Site Worker Safety
Its strengths, your benefits
By LCdr NS Wickramasinghe BSc Hons (E & E Eng) MSc (HRM) AMIE (I) AMIE (SL) C Eng (I)
LOCKOUT/TAGOUT By: Kory Hildebrand.
69 kv arc flash burn.
Substation Equipment's
29 - HAZWOPER
Presentation transcript:

DILO’s 2017 SF6 Gas Management Seminar Best Practices Dealing with Decomposition in Gas Insulated Equipment November 16, 2017 Neil Hutchins Equipment Services Supervisor Southern Company Services Support to Alabama Power Company

Best Practices Dealing with Decomposition in Gas Insulated Equipment Neil Hutchins, Equipment Services Supervisor Southern Company Services Substation Maintenance Support Over 19 Years of experience in Transmission/Substation Maintenance Supervisor of the Southern Company Services Equipment Group Provide Support to Alabama Power Company on SF6 equipment, Purchase SF6 Breakers, Circuit Switchers and GIS, 15 kV to 500 kV Manage Alabama Power Company spare SF6 Equipment fleet Provide support to Alabama Power Company’s Substation Maintenance groups, Substation support group, Substation Construction, Safety and Training organizations Chair of the Southern Company Major Equipment Committee Member of Southern Company Breaker and Substation Maintenance Committees IEEE Senior Member Member of IEEE/PES Switchgear Committee Member of IEEE Alternative Gases to SF6 Task Force Member EPRI Substation Task Force Chapter Title

Alabama Power Company / Southern Company SF6 Best Practices Plan What (Event/operation) Who (Personnel required) When Communication (Information, Location, impacts, etc) Impact to employees, system, public, customers, etc. Training Procedure and Guidelines Equipment SF 6 Gas (Awareness and Handling) Hazards Respirator Compliance Practice Chaptier Title

Alabama Power Company / Southern Company SF6 Best Practices Personal Protective Equipment Tyvek Disposable coveralls with protective shoe covers Complete Rain Suit (Switching) Nitrile gloves Duct Tape Full-face respirator with AG/OV/P100 cartridge SCBA with auxiliary, if personnel entering area/space Personnel and Equipment Decon Defined Area for Personnel Decon Distilled Water Baking Soda Pump up sprayer(s) with Baking soda and distilled water mix HEPA Vacuum with non metallic attachments SF6 Cylinder(s) empty (Under Vacuum) SF6 Recovery and Testing Equipment Denatured alcohol Atmosphere/air monitor Chapter Title

Alabama Power Company / Southern Company SF6 Best Practices Crew members in PPE Chapter Title

Alabama Power Company / Southern Company SF6 Best Practices Clean-up Supplies Distilled Water Baking Soda Pump up sprayer with Baking soda, distilled water mix and food coloring Trash Bags ( 3 mil thickness) Rags Paper Towels Denatured Alcohol HEPA Vacuum with non metallic attachments Wind Sock (Monitor direction of the wind) Weather Forecast and impacts Barricade tape Clear assignment of duties Disposal Plan First Aid Kit AED Medical Plan (Paramedics, Hospital and location, etc) Identify Onsite and Offsite support Chapter Title

Alabama Power Company / Southern Company SF6 Best Practices Alarms Low SF6 Gas Alarm Low SF6 Gas Alarm followed by Low SF6 Trip Low SF6 Gas Alarm followed by Low SF6 Block trip Relay event records analysis What caused the breaker to operate. Fault current, breaker failure, low gas, etc.) SF6 Gas Quality analysis SO2 in PPM(V) Purity of SF6 Gas (%) PPM(V) of Moisture Breaker Information Manufacture Type Anatomy of Equipment Mechanism Energy Type Chapter Title

Alabama Power Company / Southern Company SF6 Best Practices View of Phase 2 Tank with Stationary Interrupter Assembly removed Chapter Title

Alabama Power Company / Southern Company SF6 Best Practices Bushing connection moving side on interrupter for Phase 2

Alabama Power Company / Southern Company SF6 Best Practices Stationary Arcing and Main Contact Assembly for Phase 2

Moving Arcing Contacts for Phase 2

Alabama Power Company / Southern Company SF6 Best Practices

Alabama Power Company / Southern Company SF6 Best Practices The After Event Plan Documenting id an SF6 release occurred Compliance – Documentation Removal of the Equipment Move Equipment to other site for scrapping process Scrap equipment on site Disassembling Bushings Cabinets Mechanism Hydraulic/spring mechanisms need specialize equipment to be safety and properly disassembled Remove all energy sources (Pnenmatic, Spring/spring,Nitrogen) Chapter Title

QUESTIONS ???? Thank You