Extension SR1 WP3 Electrical installations

Slides:



Advertisements
Similar presentations
All purpose professional emergency lighting. Ceiling mounting. Beghelli Formula 65 is equipped with a symmetric reflector which makes it suitable for.
Advertisements

Basic electrical circuitry & applications
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Kitchen New sandwich prep table. Kitchen New pizza prep table.
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
Undertake basic electrical tasks
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Protective Measures (CLUES) Proper G Proper G Use F, CB and GFCI G live parts G live parts L or T P U of flexible cords P U of flexible cords C electric.
Electric Circuits.
Data Center Construction Project Updates and Experiences Gary Stiehr May 6, 2008 HEPiX Spring 2008.
Access Business Development Division ThyssenKrupp A Division of ThyssenKrupp Access Ltd Flow 2 Introduction.
1250 ca UNIFRONT SHELTER. 200 ca ca. 200 ca
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
1.To begin click: File, New, then select Design 2.Draw a circle, then use the dimension tool to set it’s size to 84 diameter or 42 radius. 3. Next draw.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Food Safety Training Course Co-financiado:. Work facilities and Equipments.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Installation of heating cables, a light and an outlet with a thermostat and two pole circuit breaker.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Electrical Circuits. In this activity you will: In this activity you will learn about two types of circuits. You will write a paragraph comparing and.
Residential Floor Plans
Circuits Series or Parallel.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
DOMESTIC ELECTRICAL CIRCUITS National Diploma Mechanical and Electrical Services Construction.
 There are 70,000 fires each year in Canada  Preventing fires will lessen the chance of injury or death  Knowing what to do in case of fire can save.
SERVICE TRAINING EXPERT ALPHASTAR 1132 © MAO-SE-TC 1132_SE_EX_Handout_EN_12_  Collision protection switch  Collision protection switch retrofit.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
Electric Wiring & Illumination
Installing Branch Circuits
EV DOMESTIC CHARGING UNIT
Light Bulb Changing Procedure
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
EV DOMESTIC CHARGING UNIT
SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/ results from the visits and new requirements.
EHN1 Extension planning
SR1 extension follow up 14-Aug-17 Marco Ciapetti.
EXTENSION ELENA = BUILDING 193 Status of integration
Technology in Architecture
Technology in Architecture
SR1 extension follow up 03-Jul-17 Marco Ciapetti.
Proposed New CMS Conference Room on first floor of SHL
SR1 cleanroom extension
Electric Circuits.
SR1 extension follow up 18-Dec-17 Marco Ciapetti.
Status with crucial LSS5 kicker transmission line cables
Smitty’s Two Minute Drill Mixed Content -05
East Hall under construction
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Replacement of outside mirror
Parallel and Series Circuits
Technology in Architecture
Technology in Architecture
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
Technology in Architecture
Objective: Develop plans for kitchen cabinets.
Floor Plans and Symbols
Circuit Diagrams and Schematics
GSI Asia I-Plus 3 End Control Pan
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
SMART-CALLER BEDEXIT-PIR INSTRUCTIONAL PRESENTATION
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Extension SR1 WP3 Electrical installations T.CHARVET (EN-EL-EIC)

Work package description EN-EL group is in charge of electrical general services : Design and study Providing cables and equipment Installation Commissioning Electrical general services included : Normal and safety lighting Electrical sockets Electrical power for HVAC systems Emergency stop buttons

Preliminary electrical works already done Grounding loop under building extension Replacement of electrical switchboard, and increasing of available electrical power Switchboard ready to incorporate new circuits for extension Removing old cables and electrical equipment Powering of temporary HVAC unit

Sockets boxes Validated positions (Height : ~ 1.40 m)

Sockets boxes - Dimensions

Sockets boxes - Dimensions Height : 226 mm Depth : 140 mm Width : 155 mm Power cable coming by the top, through cable glands

Light switches Installation height : between 1.10 and 1.20 m Example of switch could be installed (Plexo by Legrand) ; must be discussed Positions ; must be discussed together Control of the existing lighting circuits should be modified (existing clean room and extension, separated)

Other electrical equipment Safety lights ; similar of the model in existing clean room Emergency stop button ;

Cables paths Lighting circuits (normal and safety) ; over the ceiling. Sockets boxes, emergency stop, lights switches ; into the pillars covered and from ceiling or from false floor into the existing room. Cables paths plan with details, must to be drawn

Electrical power during works EN-EL has already installed an temporary electrical cubicle on right side of the extension Available power : 63A 4x32A and 4x16A sockets Several 2x16A sockets