MicroMegas Mechanical Meeting --- Cern April 2014

Slides:



Advertisements
Similar presentations
Status of the ATLAS MM project
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
Situation with industry
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
MM detector construction One or several modules per sector considerations.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
DATABASE ARCHITECTURE PROPOSAL Fabien Jeanneau – 19 jan 2015.
Deadline for Requisitions Payment Processing Date
Update on Pavia MM mechanical prototype
Test Beam Request for the Semi-Digital Hadronic Calorimeter
new straw end plug: D=10.6 mm straws support frame Levan option
Remaining items (per module) for panel construction (mostly Fabien)
Complementary ISTC Projects #3888, 3889p
T1 status (a selection from EDR presentations)
T1 Electronic status Conclusions Electronics Cards:
Deadline for Requisitions Payment Processing Date
Mini-drawers, FE-ASIC , Integrator
10/month is the present production rate 2 FTE + sporadic contributions
FY16 Budget Build (Banner)
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
Social protection Assessment based national dialogue in Myanmar
CMS Goal of the experiment
Visual Guide to Governance & Strategy Motions Process
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Terry Cotter LO/IF Group Leader
13-block rotation schedule
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
TPC Development at Cornell
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
April May April May June July July June August Sept August
TSF Upgrade Project Overview Resources Plans and Timetable
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
Circle Chart Template Process Name.
February 2007 Note: Source:.
PCS Technical Board 27th February 2018, Vienna.
McDonald’s calendar 2007.
Perugia SuperB Workshop June 16-19, 2009
Habitat Changes and Fish Migration
East Hall under construction
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

MicroMegas Mechanical Meeting --- Cern April 2014 Fabien Jeanneau

Goals and recommendations Goals of this meeting: Proposals and options for each step of the construction process Save time for discussions Decisions Recommendations: Reduced time for “news from the labs” Targeted information from the task groups Short presentations oriented for decision process Key points reminder by Mauro at the beginning of each session

Session schedule Panel construction Mesh stretching scenarios Components and construction Al foam studies Mesh fixation Gas distribution Mesh stretching scenarios PCB alignment and interfaces Detector assembly, deformations, interconnections Infrastructure and readiness status Layout and drawings Timeline to module-0 Components procurement 14 april 15 april * Decision needed: PCB layout deadline  end of april 2014

End of 2014 February March April May June July August Sept October Thermo-mechanical Simulations and Tests (Freiburg Measurements) Aluminium Foam Studies PCB Alignment Scheme Tests Panels Construction Full size prototypes Detector Assembly End of 2014 Mesh Type and tension Mesh fixation and deformations Gas Induced deformations PCB delivery On-chamber gas distrib. Cooling system Construction manual Design for large panels Drawings of FE boards Final Design Review Constraints from Alignment Final PCB layout Construction sites readiness review Start tendering process MODULE- 0 Construction Toolings Infrastuctures