ATLAS Thermosiphon Electrical Distribution and Run Modes

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

Refrigerators.
Trane Variable Water Flow System
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
Geothermal Energy David McArdle. What is it? Geothermal energy - The process of extracting power from underground heat that is produced by the earth’s.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Detector Cooling Project Thermosiphon Project Status Report
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
SWIMMING POOL HEAT PUMP
By: Peter Francis Sarabosing
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Chiller control system Lukasz Zwalinski – PH/DT.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Full Scale Thermosiphon Risk Assessment Lukasz Zwalinski PH/DT/PO - Cooling.
60kW Thermosiphon control system
Michele Battistin Elena Perez Rodriguez 10 November 2010
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
D. GiugniThermosiphon Review, Oct 1st 091 Risk assessment for the thermosiphon cooling test system D. Giugni Thermosiphon Review, Oct1 st 2009.
Greenhouse Management.  List the different types of heating systems used in a greenhouse.  Describe the advantages and disadvantages of each type of.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Krzysztof Śliwa 26 August, Krzysztof Śliwa 26 August, 2015  Tests done between 7th to 25th of August 2015  Circulation in by-pass over the manifold.
A two-stage system for the future cooling system.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
Bernard Boutherin 1 Feedback after four years of operation.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Update on the PSB Cooling and Ventilation Systems
IBBelle: Status & Plans
2016 RZR xp Turbo – COOLING Hood Scoop & Air Deflector
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
- Condensate pump and feed pump trip!
Lecture Objectives: Discuss Final Project
PRIEN / PIAA Meeting April 30, 2009 Pfizer Caguas
Control Logic for ATLAS Thermosiphon chiller brine and water circuit
CERN Data Centre ‘Building 513 on the Meyrin Site’
ATLAS Thermosiphon Readiness Review 17th March 2016
Forum on Tracking Detector Mechanics - Bonn, May 2016
CRYOGENICS OPERATIONS 2008 Organized by CERN
Lecture Objectives: Answer questions related to HW 4
Desuperheater Heat Transfer Device Manufactured by Maniks
Insertable B Layer Cooling System
B. Munkhbayar BEEC/SCEA/MUST
Lecture Objectives: Discuss HW4 parts
- Condensate pump and feed pump trip!
Date: Water Cycle Words.
Presentation transcript:

ATLAS Thermosiphon Electrical Distribution and Run Modes O.Crespo-Lopez EDMS: 1159012

Two Operation Modes Normal Mode: (180kW @ -70°C) all the system is operational @ full power Warm mode: (50kW @ -20°) Could be used if normal power trip or during electrical maintenance Could be used if we loose the water system

Power sources For the thermosiphon cooling system we use UPS power: All the PLC cabinets Brine pumps Liquid heaters Dummy load heater for minimal flow Diesel power (warm mode) High temp stage of the chiller with limited power Normal power (normal mode) All the rest of the system

Electrical distribution USA15 level 2 Surface SX1 & outside

Installed power 100 kW 231 kW 237 kW 10 kW 40 kW 30 kW 15.5 kW Chiller Circuit Low Temperature Stage High Temperature Stage 100 kW Primary Water Water Circuit TS Condenser Brine Circuit 231 kW 237 kW 10 kW 40 kW 30 kW 15.5 kW 10 kW for PLC’s 72 kW 5 kW for PLC’s 24 kW power Normal Diesel in kW UPS in kW Surface 530 kW 100 kW 40 kW underground 115.5 kW - 100 kW By-pass Full power dummy load Normal power UPS power Diesel power

Normal mode 231 kW 237 kW 10 kW 40 kW 30 kW 15.5 kW 10 kW for PLC’s Chiller Circuit Low Temperature Stage High Temperature Stage Primary Water Water Circuit TS Condenser Brine Circuit 231 kW 237 kW 10 kW 40 kW 30 kW 15.5 kW 10 kW for PLC’s Used only during start-up 72 kW 5 kW for PLC’s 24 kW The chiller can provide 180kW @ -70°C By-pass Full power dummy load Normal power UPS power Diesel power

Warm mode 100 kW 100 kW 10 kW 40 kW 30 kW 10 kW for PLC’s 56 kW Chiller Circuit Low Temperature Stage High Temperature Stage 100 kW Primary Water Water Circuit TS Condenser Brine Circuit 100 kW 10 kW 40 kW 30 kW 10 kW for PLC’s 56 kW 5 kW for PLC’s The chiller can provide 50kW @ -20°C with water or air cool condenser 24 kW By-pass Full power dummy load Normal power UPS power Diesel power