IA 122 RECONSTRUCTION PRE-BID MEETING

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Cost Estimation System Tool
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
STA Safety Project PID #76439 December 12, 2006.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
Warwick Boulevard Townhall Meeting May 21, 2007 Thomas A. Druhot, P.E. VDOT Hampton Roads District Peninsula Area Construction Engineer.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
2nd Street Drainage and Paving Improvements
Town of Brighton, Department of Public Works
U.S. 63 Reconstruction Prebid meeting
PROJECT INFORMATION SESSION Small Business Enterprise
I-15 North Phase 4 Scoping & Project Management Assistance
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
DICKINSON AVENUE RECONSTRUCTION
107th & 110th Avenue North Public Utilities Renewal Projects
City of Bloomfield Hills
Public Information Meeting NW 100th Street Reconstruction Project
Stark St Beaver Creek Culvert Project Updates
General Tab Project, Cost Schedule, and Work Limits Roadway Character
US26: Cornelius Pass Rd -185th Ave
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
CH 42 & TH 13 Construction Update
PROJ. 566(17) LOR PID MAJOR WIDENING
1200 West Widening and Reconstruction Project
Contract 60X10 Informational Meeting Weber I-55
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Meadow Lake Boulevard Street Extension Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Metropolitan District | mndot.gov
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

IA 122 RECONSTRUCTION PRE-BID MEETING December 5, 2017 10:00 AM Nick Humpal, P.E. District 2 Design Engineer

PRESENTATION OVERVIEW IA 122 Reconstruction Concerns US 65 Sites 1 & 3 Storm Sewer Design East End Rock Excavation Utility Conflicts

IA 122 PROJECT LOCATION Monroe Avenue to Carolina Avenue

PROPOSED IMPROVEMENTS Three Projects – One Contract Grade and Replace; NHSX-122-1(18)—3H-17 Traffic Signals; NHSX-122-1(19)—3H-17 Traffic Signs; NHSX-122-1(23)—3H-17

PROPOSED IMPROVEMENTS New emergency vehicle access Reducing severity of curves on east end Reconstructing Federal & Pennsylvania On-street bike lanes Improving intersections Driveway improvements/removals Sidewalk reconstruction Improving drainage

Fire Station

Reconstructing Federal Avenue & Pennsylvania Avenue

Previously Demolished 4 Homes Previously Demolished

FEDERAL AVENUE RECONSTRUCTION Site 3 (2019) 45 Calendar Days Site 1 (2018) 45 Calendar Days

FEDERAL AVENUE (US 65) DETOUR Reconstruction Detour Route

PENNSYLVANIA AVENUE RECONSTRUCTION 2019 2018

STORM SEWER Increasing number of intakes Several new pipes Adding new outlets for drainage

NEW STORM SEWER OUTLETS

5’x5’ RCB Twin 5’x4’ RCB Utilizing existing storm Sewer mains that require Unique intake structures.

NON-STANDARD INTAKE 5 Single Open Throat 2 Double Open Throat Existing Main 5 Single Open Throat 2 Double Open Throat

ROCK EXCAVATION 3,110 CY anticipated Estimate based on old city sanitary sewer rock profiles on WB lanes Quantity double for EB lanes

UTILITY CONFLICTS Alliant Energy – Electric Alliant Energy – Gas Mostly relocated prior to project Minor coordination, not all poles will be removed Alliant Energy – Gas Coordination required for abandoned under pavement CenturyLink 48 known conflicts (Utility Bid Attachment)

UTILITY CONFLICTS Cerro Gordo County - Fiber ITC Midwest - Electric Impact to P-324 & I-324 Western Edge to assist with installation ITC Midwest - Electric Relocated Iowa Hospital Association - Fiber

UTILITY CONFLICTS Mediacom City of Mason City Working with Alliant Energy Plan to be relocated prior to project City of Mason City Water main work in plans Sanitary Sewer work in plans Lighting work in plans

CONSTRUCTION Spring of 2018 – 11/20/2018 Spring of 2019 – 11/26/2019 Temporary pavement Eastbound curves, medians at Monroe & Carolina Construct westbound lanes Construct 4-lanes, Massachusetts to Carolina Two-way traffic on eastbound lanes Spring of 2019 – 11/26/2019 Construct eastbound lanes Two-way traffic on westbound lanes

CONSTRUCTION 2018

EAST END STAGING Existing lanes left in place To provide adequate drainage.

CONSTRUCTION 2019

SCHEDULE July 2017: Utility Relocations Began September 2017: Right-of-Way Acquisition October 2017: Final Design Complete December 19, 2017: Project Letting 2018: Westbound Construction 2019: Eastbound Construction

? THANKS!