Beam Line Alignment Richard Catherall EN-STI

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

1 TTF Superconducting Quadrupole Doublet Simulation with MAFIA to compare with Measurements Michaela Marx 27 March 2006.
ECLOUD Calculations of Field Gradients During Bunch Passage Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education Electron Cloud.
Alignment and Beam Stability
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
HINS ProtonSource/LEBT Beam Measurement Meeting on HINS Beam Dynamics and Diagnostics March 13, 2009 Salah Chaurize Vic Scarpine Wai-Ming Tam.
ISOLDE Technical Report & Long Shutdown Works ISCC Meeting 28 th January 2013 Richard Catherall EN-STI.
H - injection simulations 13th October 2014 Jose L. Abelleira, Chiara Bracco.
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Nonlinear Dynamic Study of FCC-ee Pavel Piminov, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
Transformations on the Coordinate Plane: Translations and Rotations.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
June 2006LHCCWG / J. Wenninger1 Orbit response measurements and analysis J. Wenninger AB-OP Principle Software status Example from SPS ring and lines Potential.
Tuesday, 02 September 2008FFAG08, Manchester Stephan I. Tzenov1 Modeling the EMMA Lattice Stephan I. Tzenov and Bruno D. Muratori STFC Daresbury Laboratory,
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Modeled & Compiled ByR.Rajashekar Asst. Professor, Dept. of Mech. Engg., UVCE.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
Corrections for multi-pass eRHIC lattice with large chromaticity Chuyu Liu ERL workshop 2015 June 7, 2015.
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
CEPC DA due to magnets' error Sha Bai, Dengjie Xiao, Yiwei Wang, Huiping Geng, Dou Wang, Tianjian Bian, Feng Su, Jie Gao The first IHEP-BINP CEPC Accelerator.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
Wakefield effect in ATF2 Kiyoshi Kubo
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
YETS activities at ISOLDE Richard Catherall EN-STI-RBS ISOLDE Technical Coordinator 75th ISCC meeting 2 nd February 2016.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Beam Dynamics Studies of the HIE-ISOLDE Superconducting LINAC at CERN
ILC DR Lower Horizontal Emittance, preliminary study
Correlated Misalignments Studies for LCLS-II SC Linac
Orbit Response Matrix Analysis
Tolerances & Tuning of the ATF2 Final Focus Line
Status of SPARC Undulator
Benchmarking MAD, SAD and PLACET Characterization and performance of the CLIC Beam Delivery System with MAD, SAD and PLACET T. Asaka† and J. Resta López‡
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
Low Emittance Tuning Tests at the Diamond Light Source (Rutherford Labs) Dec R. Bartolini, S. Liuzzo, P. Raimondi SuperB XV Meeting Caltech, CA,
Status on Work for Splitter FS and Dilution System FS
DFS Simulations on ILC bunch compressor
ILC DR Lower Horizontal Emittance? -2
Emittance growth AT PS injection
Update on the PSB Transfer Lines
Beam Optics Set-Up at SLAC End Station A
FCC-ee Lattice with Misalignments
ISOLDE Technical Report & Long Shutdown Works
Magnetic gap calculation
G1. G1 g2 g3 g4 g5 g6 g8 g10 g11 g12 g14.
Lab 6-1-solution Step-by-step.
Orbit response measurements and analysis
Studies for TBT optics measurements in the PSB
ICFA Mini-Workshop, IHEP, 2017
Lesson 2-2 Graphing on a Coordinate Plane
SuperB Dynamic Aperture A. Bogomyagkov, E. Levichev, P
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
Optics Measurements in the PSB
Triplet corrector layout and strength specifications
CN: Graphing Horizontal and Vertical Lines
Calculate, in metres correct to one decimal place, the distance between Sally and Kate. 35° 30° 60°
Sawtooth effect in CEPC PDR/APDR
Coordinate Plane y axis x axis.
JLEIC Weekly R&D Meeting
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Integration of Detector Solenoid into the JLEIC ion collider ring
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Error Sensitivity in MEIC
Status of RCS eRHIC Injector Design
Presentation transcript:

Beam Line Alignment Richard Catherall EN-STI ISOLDE Technical Coordinator ISCC meeting 28th June 2016

ISOLDE Lines - Survey Results Measurements of November/December 2012 Isolde Lines Survey Results – meeting 15.01.2013

Isolde Lines Survey Results – meeting 15.01.2013 RESULTS – vertical plane ~ 10mm step Zavg = 437.0172m Dev: -1.5mm to +1.5mm Zavg = 437.0073m Dev: -1.8mm to +1.1mm Isolde Lines Survey Results – meeting 15.01.2013

Isolde Lines Survey Results – meeting 15.01.2013 RESULTS – vertical plane Isolde Lines Survey Results – meeting 15.01.2013

RESULTS – horizontal plane main line CA0 – CD0 Line: CA0-CB0-CC0-CD0 Bearing [g]: 351.4005 Name X [m] Y [m] Distance to line [mm] CA0_Q_E 1879.3962 2239.1236 -0.1 CA0_Q_S 1878.7661 2239.7807 -1.1 CB0_Q1_E 1877.3575 2241.2535 -0.6 CB0_Q1_S 1876.7272 2241.9131 0.1 CB0_Q2_E 1874.9036 2243.8206 1.4 CB0_Q2_S 1874.2733 2244.4785 0.9 CC0_Q1_E 1872.8599 2245.9545 0.2 CC0_Q1_S 1872.2301 2246.6140 1.2 CC0_Q2_E 1871.3751 2247.5059 0.0 CC0_Q2_S 1870.7443 2248.1640 -0.7 CD0_Q1_E 1869.3341 2249.6383 -0.3 CD0_Q1_S 1868.3920 2250.6219 -0.9 Deviation scale 500:1 Relatively to the scale along the beam Isolde Lines Survey Results – meeting 15.01.2013

RESULTS – horizontal plane bearings comparison Line Theoretical Bearing Calculated Difference Calc-Theo [g] [cc] CA0-CB0-CC0-CD0 351.4121 351.4005 -116 LA1 245.8565 245.8974 409 LA2 279.1898 279.2213 315 LA0-LA3 312.5232 312.4988 -244 LC0 312.5030 -202 RA0 390.2997 390.3080 83 RB0 390.3010 390.2699 -311 RC0-RC2-RC6 390.2941 -69 RC3 29.1899 29.1670 -229 RC4 323.6343 323.6108 -235 10cc ~ 0.16 mm/10m +409cc Theoreticl Bearing Calculated Bearing +315cc -244cc -116cc +83cc -202cc LC0

MADX simulations Distorted beam line without correction Distorted beam line with correction

MADX simulations summary The result of this study shows that the transmission of the transfer lines can be recovered by using the correction power of the available steering quadrupoles. This is a rather fortunate situation because a misalignment in the horizontal direction would have been more difficult to handle due to the fact that the horizontal apertures of the elements are smaller. After tuning for 8 hours, one could achieve a transmission from CA0 to RC4 of around 80% to 90% (at 50kV). Acceptance study of the ISOLDE beam lines with MAD-X https://edms.cern.ch/document/1688599/1 E.Rapisarda, M.A. Fraser, J. Kurcewicz, D. Voulot