1200Z/COLS PERMIT REVISIONS AND PATH FORWARD

Slides:



Advertisements
Similar presentations
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
Advertisements

Effective October 1, 2011 New Connecticut General Permit for the Discharge of Stormwater Associated with Industrial Activity October 5, 2010 Connecticut.
Storm Water Regulation: What’s Next? Presented to: September 30, 2014.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
Stream Monitoring in Loudoun County David Ward, Water Resources Engineer Department of Building and Development, Department of Building and Development,
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
DID YOU KNOW? – Cuyahoga River on Fire in Cleveland, Ohio – Raw wastewater spewed in the San Francisco Bay – City of Columbia Discharged Raw Wastewater.
1 Solar Update July 11, 2013 Michael E. Finn, CFO.
STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.
Texas Clean Rivers Program Nueces River Authority Texas Commission on Environmental Quality Citizens.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Health and Safety Executive Health and Safety Executive Seveso III Directive Moving from Seveso II to Seveso III Sandra Ashcroft, HSE 19 March 2013.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Oxon Run and C&O Canal TMDLs
Water Quality Planning Division Monitoring & Assessment Section Surface Water Quality Monitoring Program (SWQM)
Steps in the Hazardous Waste Permit Reissuance Process December 10, 2014.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
EMODNET CHEMISTRY June 2013 Trieste, Italy SCIENTIFIC RESEARCH FIRM GAMMA N. Machitadze.
Value Stream Mapping the Delaware Air Quality Permitting Process
Developing Final Phase II WIPs and Milestones Jim Edward EPA Deputy Director Chesapeake Bay Program Office DDOE Meeting with Federal Partners February.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
NPDES Wastewater Permitting Update 2015 NCMA Workshop Tom Belnick DWR/NPDES Permitting.
IMLA New England Regional Land Use Seminar June 21, 2012 Work Session 2. Storm Water Management James N. Katsiaficas, Esq. P.O. BOX 426 PORTLAND, MAINE.
Expanding Water Quality Assessments beyond the Realm of 'Impairments' and into a Tool Useful to Watershed Managers at the Local Level Ken Edwardson Watershed.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Implementing SB 1525: An Update Cheyenne Walsh Squire Sanders (US) LLP Government Finance Officers Association of Arizona Winter Conference Prescott, Arizona.
Ch WAC Geologic Sequestration of Carbon dioxide John Stormon Hydrogeologist Washington Department of Ecology Seattle, WA October.
ISAT 422: Environmental Management Water Regulations n "Clean Water Act (CWA)" = Water Pollution Control Act of 1972 n Amended by Clean Water Act of 1977.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Animas River Stakeholders Group January 26, 2016.
Hexavalent Chromium MCL Regulation Guidance Eric Zuniga, PE San Bernardino District SWRCB – DDW.
Connie Brower NC DENR Division of Water Resources.
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION Regulation 100 Update September 2011.
THE NEW CLEAN WATER ACT E-REPORTING RULE: WHAT ELECTRONIC DATA REPORTING AND SHARING MEAN FOR YOUR OPERATIONS By: Damien M. Schiff Principal Attorney Pacific.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
NJDEP Stormwater Program-Update
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
NPDES Electronic Reporting Rule
Water Quality Planning Division Monitoring & Assessment Section
Boatyard General Permit Stormwater System
The Nuts & Bolts of TBLL Development
STORMWATER MANAGEMENT
Proposed Bay TMDL Schedule
NPDES Electronic Reporting Rule
NH MS4 Stormwater Permit -- Guidance for NHDES related provisions
Overview of the Reissuance of 401 Water Quality General Certifications
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
Environmental Management Commission January 10, 2013
John Tinger U.S. EPA Region IX
Department of Environmental Quality
Update DG Environment 9th Noise Expert Group Meeting 30 November 2017
Water Quality Trading Advisory Committee MDA Headquarters
Spencer Bohaboy Policy Development Specialist Water Quality Policy
Water Quality Trading Advisory Committee MDA Headquarters
EPA’s Current Air Toxics Activities
EPA Region IV and ADEM NPDES Permit Coordination
Working with Agencies March 26, 2019 Kale Walch.
Preparation of the Heavy Metals Protocol Ratification by Ukraine
Water Quality Planning Division Monitoring & Assessment Section
AE Title III Status Introduction
Indiana Department of Environmental Management Office of Water Quality
Water Quality Planning Division Monitoring & Assessment Section
VPDES Industrial Stormwater General Permit
Presentation transcript:

1200Z/COLS PERMIT REVISIONS AND PATH FORWARD Michael J Pronold City of Portland February 9, 2017 Who has a permit? Who needs a permit? Draft permit was scheduled for Public Notice in January but DEQ has shared some of the proposed revisions. Had a stakeholders meeting in November. I believe most of these will be in the permit put up for public notice.

SCHEDULE 1200-COLS Permit - Expired Aug. 31, 2016 1200-COLSB Permit - Issued Nov. 3, 2016 1200-Z Permit Public Notice Tomorrow; 35 days. Public Hearing in early March Permit expires June 30, 2017 Combined permit effective July 1, 2017 Expired – administratively extended B – Can’t legally issue an expired permit Tomorrow Still on schedule for July 1

PERMIT RENEWAL SUBMITTAL No SWPCP Reviews No Public Review of Individual Sites Was/is a contentious issue with citizen groups. How can you issue a permit if you don’t know the SWPCP meets permit conditions. -No significant changes (some BMs lowered) -Would require an inspection so could delay permit renewals -Not legally obligated to.

TIER I Correction Action Response to Exceedance for Impairment Pollutants or Benchmarks. Applies even if Tier II Corrective Action was taken. Reports kept on site. No longer BER. Hopefully reduce confusion, lessen number of “reports”.

TIER II Evaluation based on second year geomean. Tier II can be triggered again. Report is part of the SWPCP. Provision for Waiver still exsits Timing of second year. If issued a permit recently that would count as your first year. (Any fraction of the year!).

PORTLAND HARBOR Not as inclusive as the slough. Was “targeted” to sites that DEQ had identified as having activities that have/could impact sediment. EPA wanted everyone to have a permit. Slough origin a lot to do with heavy construction industry.

Benchmarks Region Cu Pb Zn pH TSS O/G eColi BOD TPO4 Cascades .009 .040 .12 5.5-9.0 100 10 *406 Coastal .024 Columbia River .050 Columbia Slough .038 .060 .24 5.5-8.5 30 406ct 33 .16 Eastern Willamette Harbor .022 Willamette Valley .012

Monitoring Reinstatement of monitoring No more additional pollutants Modified impairment list eReporting

eReporting and NetDMR 2016-2017 DMR – paper 2017-2018 DMR – NetDMR (EPA Training) 2020 target date for everything else (Applications, Waivers, SWPCP, Tier I/II, etc.) Next year (17-18) all reporting will be electronic. Naming convention Training on EPA website Publically available (WA, some CA) City/DEQ coordination

OTHER ITEMS TBELs Variance Request Monitoring Waivers Notice of Termination Reporting BMs – TSS - 30 (Slough and PHarbor) based on work done by WA DOE in the Duwamish watershed. Modified benchmanrks based on GI? Cd, Cr, Ni (some sectors Hg and PCBs) – no more monitoring. No proposed BMs. Impairment - JCreek DDE, endosulfan, endrin aldehyde, lead (dissolved -0.017)) Willamette copper (0.01) lead (d), pentachlorophenol (removed) Fanno Creek (As, Cu, Fe, Pb (d), tetrachloroethylene, Th, Zn (0.04) Employee Education/MSGP Guidance on how to note no sampling, increase in GI Waivers to remain NOT conditions required to obtain a termination – past contamination. Like 1200C Reporting (Table) summarize but still throughout the permit

PATH FORWARD Permit to be Effective 07/01/17 DEQ/Agent Issue Permits with Permit Assignment Letters SWPCP Revisions If Necessary Holistic Approach Green Infra-structure Not only for the permit but for stormwater management in general. New development criteria/requirements; Stormwater as a resource; Green Infra-structure

Michael J. Pronold Environmental Program Manager City of Portland michael.pronold@portlandoregon.gov 503-823-7584