Planning for the Demonstrator

Slides:



Advertisements
Similar presentations
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Advertisements

Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
Ingrid-Maria Gregor, EUDET EUDET: Status and Perspectives Ingrid-Maria Gregor, DESY  The EUDET initiative  EUDET activities  Joint Research Activities.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
JRA1 Status: PCMAG, Sensors and Infrastructure Tobias Haas DESY/F1 11 September 2006.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Towards the ‘final’ JRA1 DAQ Daniel Haas DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam Outline.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
David Cussans, 18 th October 2006 JRA1 Beam Telescope DAQ and Trigger.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
CSIC WP9.4 Activities Status report AIDA 2 nd Annual meeting WP9.4 Iván Vila Álvarez Instituto de Física de Cantabria.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE FACULTÉ DES SCIENCES UNIVERSITÉ DE GENÈVE EUDET JRA1 Meeting Munich October 2006 DAQ Status Emlyn Corrin.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007.
JRA1 Magnet and Test Beam Infrastructure  Superconducting Magnet (PCMAG)  Mechanics  Cooling  Telescope Simulations  Measuring DESY Tobias.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
AIDA (mini) Trigger/Timing Logic Unit (mini TLU) Introduction Status Plans Summary 21/11/2013David Cussans, AIDA WP9.3, DESY1.
14.4. Readout systems for innovative calorimeters
ILD & Test Beam DAQs session
ECAL front-end electronic status
SPF MAG Quarterly Report – Feb 2015
SCHEDULE Nov 1st - Assembly Table Complete
AIDA DAQ needs (and other issues)
Silicon Lab Bonn Physikalisches Institut Universität Bonn
10/month is the present production rate 2 FTE + sporadic contributions
C. de La Taille IN2P3/LAL Orsay
3. Februar 2006 Tobias Haas DESY
AIDA (mini) Trigger/Timing Logic Unit (mini TLU)
Slice Test Planning Schedule(s) and Milestones.
Status of CO2 Cooling tests at CERN for Pixel phase 1

SCOTT NO meeting Measurement
A Beam telescope for the EMC testbeam
Presentation transcript:

Planning for the Demonstrator Tobias Haas/DESY JRA1 Meeting 25 January 2007/Genève

Tobias Haas: Demonstrator Planning JRA1 Milestones Oct06 # Name Date Partner Description/Remarks 1 TLU 18 Oct 06 Bristol TLU working. Ship to Geneva. 2 DAQ0 Geneva Bonn+Strasbourg DAQ + TLU work together. 3 FE0 15 Jan 06 DESY 15 Populated FE board sets with sensors (limited tests) available. Ship to Ferrara, Geneva, Strasbourg. 4 EUDRB0 Ferrara EUDRB board partial functionality. Ship to Geneva 5 DAQ1 5 Mar 06 DAQ partially integrated with EUDRB 6 EUDRB1 EUDRB board tested with FE board set and sensor (no sparsification). Ship 1 full set to Geneva. 7 FE1 Strasbourg, Geneva, Ferrara, DESY FE board sets fully qualified 8 EUDRB2 2 Apr 06 2 EUDRB boards synchronized. Ship 1 set to Geneva. 9 DAQ2 30 Apr 06 DAQ fully integrated with two full FE board sets + EUDRB 10 TB0 Mechanics and TB infrastructure ready for integration 11 DEMO0 2 Jul 06 Demonstrator available 25 Jan 2007 Tobias Haas: Demonstrator Planning

Tobias Haas: Demonstrator Planning Tasks for this Meeting Review Progress Update the milestones Discuss commissioning of the demonstrator Telescope DUTs Discuss what we aim for in the final telescope 25 Jan 2007 Tobias Haas: Demonstrator Planning

Tobias Haas: Demonstrator Planning General Remarks Good progress Initially Currently in a critical phase Keep the momentum going Documentation Poor! Write up your stuff in memos Commend Daniel!!!! 25 Jan 2007 Tobias Haas: Demonstrator Planning

Remarks/Questions for Discussion

Tobias Haas: Demonstrator Planning Demonstrator Sensors What do we know about existing MIMOTel? Fe55 spectrum Double-peak structure in MIMO*3L, 20 vs 14 um Yield PCBs When will the 15 sets from DESY be avail. How many should be populated with sensors? Who needs them when? More needed? When? Milestone FE1 will slip!!! 25 Jan 2007 Tobias Haas: Demonstrator Planning

Tobias Haas: Demonstrator Planning EUDRB Ready for first integration with DAQ? Integration week in FE, when? Changes for MIMO*2 -> MIMOTEL (EUDRB/DAQ) 5 March Milestone (EUDRB1) Realistic? 25 Jan 2007 Tobias Haas: Demonstrator Planning

Tobias Haas: Demonstrator Planning DAQ Missing pieces Event class => consider LCIO format? Monitor/Logger Integration with EUDRB When? 25 Jan 2007 Tobias Haas: Demonstrator Planning

Tobias Haas: Demonstrator Planning HW and Integration Milestones 8-10 (EUDRB2, DAQ2, TB0, DEMO0) First integration with beam: Assemble at DESY and look for signals in the DESY beam Precision work at CERN 1 week parasitic + 1 week dedicated @ SPS Arguments: Avoid the MS Rate 25 Jan 2007 Tobias Haas: Demonstrator Planning

Tobias Haas: Demonstrator Planning DUT Integration Mechanical Interface DAQ Interface SW level (producer task) Trigger level (TLU) When and How? What is needed 25 Jan 2007 Tobias Haas: Demonstrator Planning

Tobias Haas: Demonstrator Planning Final Chips Discriminator vs ADC Integrated ADCs would not be available in time? Where will this device be used What precision? What rate? 25 Jan 2007 Tobias Haas: Demonstrator Planning