Status with crucial LSS5 kicker transmission line cables

Slides:



Advertisements
Similar presentations
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Advertisements

Compressor status AWAKE Technical Board meeting 19 May 2015.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
December 3, 20031Muon Integration Meeting B. Schmidt Introduction: The present architecture of the Muon System is based on the assumption that the maximal.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Kicker generator and controls installation in ECA5? Etienne CARLIER
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Extraction and beamline progress B.Goddard TE/ABT.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
SPSU – May 19, 2009 – Resources needed for SPS coating project– J. Bauche 1 Coating of the SPS Main Dipoles Vacuum Chambers: Resources Needed for Project.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SPS-FIRE The SPS Fire Safety Project Planning Status
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Update on the Critical Path of the PS Booster Schedule for the EYETS
BE-ICS Activities during the LS2 Period (15 min)
Francois and Lau EATM 17 July 2012
East Hall under construction
BA6 – crab cavity activities in EYETS
FCC lifts Layout, characteristics etc.
News from Integration WG
Impact of TIDVG problem on LSS5 dump design schedule
EC Activities Status for LIU September 2017
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
EC Activities Status for the LIU
BE-ICS activities for LIU Project
LIU–PLI report LIU SPS meeting.
YETS & LS2 Reminder G. Girardot 20 juin 2017.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
A very first look at siting issues
SPS activities during LS2 TE-EPC (Power Converter Group)
LIU and TE/ABT/PPE activities
Extension SR1 WP3 Electrical installations
BE-ICS work for SPS Safety Systems
SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
LIU-SPS review for BI (no BWS)
East Hall under construction
East Area Renovation Supply of control rooms b.157
SPS Planning meeting for LS2 #25 Vacuum sectors status
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Status with crucial LSS5 kicker transmission line cables Etienne CARLIER LIU-SPS Meeting 8-02-2017

- The cable length from the yellow door ECX5-LSS5 ( ) to the platform ( ) is 61m. - Cable end points in LSS5 (magnet) and ECA5 (generator) defined

Kicker transmission line cables   MKDV1 MKDV2 MKDV3 MKDH1 MKDH2 MKDH3 Cable type CLP50 4x7.0L/10.4 Diameter [mm] 31.5 48 Bending radius [m] 0.6 0.75 Weight [kg/m] 1.25 2.5 Physical length [m] 124.7 119.3 118.7 114.8 115.1 115.5 Normalised length [m] 130.0 120.0 Number of cables 78 15 Total length [m] 10140 1800 Cost per meter [EUR] 45 75 Total cost [EUR] 456300 135000

Purchase status 4x7.0L/10.4 (MKDH) – 150 kCHF CPL50 (MKDV) – 485 kCHF We hope to go for single source, replacement of existing cables. Delivery in 2017 still feasible CPL50 (MKDV) – 485 kCHF Market survey in preparation (> 200 kCHF) Delivery 2017 questionable* MKP LSS1 cable replacement as an option. FC required once option activated (before LS2) Draka was at CERN yesterday and confirmed that they have the capacity to produce the full quantity (10 km) in 3 / 4 months. Order to be placed before 07/2017 at the latest for delivery in 12/2017 * The ? is at CERN with purchase procedure (Spec committee + MS + IT).

Transmission line routing Critical area for integration Transmission line routing

Integration Transmission routing via the upper ECX5-ECA5 level as preferred option Routing via the ECX5-ECA5 ground floor level not possible due to cable bending radius and reduced space available at the level of the elevator Detailed integration study ongoing Scan ECX5-ECA5 gallery done Physical closure of ECX5-ECA5 windows after transmission line installation (closure must be air tight for protection of the shaft against smoke in case of fire)  Under discussion with SPS Fire safety project & HSE Access to the technical shaft from Level 0 via existing crinoline after closure of the 2 windows (Technical shaft is not an evacuation path)  Under study with HSE Removal of sector doors YDPS01.556=PT55 & and doors YDPS01.516=PT51  New SPS sectorisation under study (SPS Access System Project) Cable ladders integration and cable routing Under study by EN-EL

Kicker platform in ECA5

EYETS17-18 - Strategy Install kicker platform in ECA5 Cable start / additional cable length will be stored under the platform Install cable ladders from kicker platform in ECA5 up to magnet location in LSS5 Work over Christmas CERN probably required if cable available in order to be ready beginning of 2018 to start cable pulling If cable available: start pulling cable from ECA5 to LSS5 Cable pulling campaign duration ~8 weeks (2 shifts) MKDV transmission line must normally be installed first. Transmission lines will be installed on the top of the tunnel and first magnet is a MKDV (before QD.51710 ). Connectors mounting (both sides) to be scheduled during LS2 (2 x 8 weeks) If cable not available: start cable routing at the beginning of LS2 during LSS5+ de-cabling campaign (MKDV)