Acceptance Test Review

Slides:



Advertisements
Similar presentations
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Telecommand and Telemetry Data Dictionary Services Sergio.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
NASA CII GEO Guidelines and Database Bernie Bienstock May 21, 2013.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
Requirements Traceability Matrix
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: #
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
11-1 MAVEN PFP ICDR May 23-25, 2011 PF Flight Software Critical Design Review May , 2011 Peter R Harvey Mars Atmosphere and Volatile EvolutioN (MAVEN)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review RFAs and Recommendations Peter R. Harvey.
Acceptance Test Readiness Review
Operational Flight Software
Solar Probe Plus FIELDS Pre-AGU Science Meeting
Critical Design Review
I&T&C Organization Chart
Solar Probe Plus FIELDS
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Solar Probe Plus FIELDS
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
SPP FIELDS V1234 Thermal PSR
GLAST Large Area Telescope:
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
THEMIS FM4/FM5 INSTRUMENT SUITE
Boot Code Readiness Review
Peer Review Agenda (Suggested).
Engineering Processes
BRIAN KLATT MISSION ASSURANCE MANAGER
CubeSat vs. Science Instrument Complexity
GLAST Large Area Telescope
GLAST Large Area Telescope
PSS verification and validation
Integration & Test Instrument Operations Coordination
<Your Team # > Your Team Name Here
Presentation transcript:

Acceptance Test Review MAVEN Particles and Fields Flight Software Acceptance Test Review Peter R. Harvey

Development Status Software Products: Boot FSW (PROM) Build Plan Build1 : Support ETU DCB Test, S/C Interface tests Build2 : Updated, Built for Flight Unit PROM Operational FSW (EEPROM) Build1 : Support S/C Interface, ETU Instrument I&T Build2 : Support Storage Capabilities, Onboard Data Processing, FLT I&T Build3 : Updated, Built for Flight EEPROM Command and Telemetry Database FSW Simulations FSW Test Scripts (ETU) (CPT and LDS)

FSW Reviews/Actions Matrix showing successful completion of the following reviews: Software Requirements Review (SwRR) – Completed 4/28/2010 Software Preliminary Design Review (SwPDR) – Completed 5/12/2010 Instrument Preliminary Design Review (iPDR) – Completed 6/14/2010 Software Critical Design Review (SwCDR) – Completed 5/09/2011 Instrument Critical Design Review (iCDR) – Completed 5/23/2011 Boot FSW Software Test Readiness Review (SwATRR)- Completed 8/9/2011 Software Code Walkthru Review (SwCW)- Completed 8/26/2011 Software Fault Protection Review (SwFP)- Completed 8/26/2011 Software Test Readiness Review (SwATR)- Completed 9/30/2011 Instrument Pre Environmental Review (iPER) – Completed 5/22/2012 Operational FSW Software Code Walkthru Review (SwCW Core)- Completed 9/18/2012 Software Code Walkthru Review (SwCW Inst1 )- Completed 9/30/2012 Software Code Walkthru Review (SwCW Inst2 )- Completed10/04/2012 Software Test Readiness Review (SwATRR)- Completed 10/15/2012 Software Test Review (SwATR)- In Progress 10/29/2012 Agenda defined by MAVEN Software Management Plan, rev B format for SwATR

FSW Reviews/Actions Status of RFAs from all reviews Software Requirements Review (SwRR) – No Actions Software Preliminary Design Review (SwPDR) – 23 of 23 Rec’s Complete Instrument Preliminary Design Review (iPDR) – 1 of 1 Action Complete Software Critical Design Review (SwCDR) – 1 of 1 Action Complete Instrument Critical Design Review (iCDR) – No Actions Boot Software Test Readiness Review (SwTRR)- 15 of 15 Actions Complete Software Code Walkthru Review (SwCW)- 15 of 15 Rec’s Complete Software Fault Protection Review (SwFP)- No Actions Software Test Readiness Review (SwATR Instrument Pre Environmental Review (iPER) Operational Software Code Walkthru Review (SwCW Core) – 20 of 20 Actions Complete Software Code Walkthru Review (SwCW Inst1 )- 9 of 9 Actions Complete Software Code Walkthru Review (SwCW Inst2 )- 8 of 8 Actions Complete Software Test Readiness Review (SwATRR)- 5 of 5 Actions Complete

FSW Open Actions

Code Development Code Development & Test Summary . The payloads shall issue a safe me request and withhold aliveness if the affected instrument is unable to properly configure upon transition into a zone alert region. The payloads will withhold aliveness anytime any processor task is not operating nominally ICD2362

PFRs and SCRs

FSW Reports/Inspections Software Inspection/Peer Review Reports MAVEN_PF_FSW_031A_Inspection.pdf Software Acceptance Test Reports MAVEN_PF_FSW_032_LDS_121012.pdf MAVEN_PF_FSW_030_CPT_121031.pdf MAVEN_PF_FSW_033_VDD_V301.pdf

Requirement Verification Summary of changes to Software Requirements Specification 220 Level 5 Requirements changes (Boot & Operational Code) (There are 275 Level 5 requirements) Requirements Verification Matrix (RVM) MAVEN_PF_FSW_002_SRS_Tables.xls, L5a Column K (Boot) MAVEN_PF_FSW_002_SRS_Tables.xls, L5b Column K (Operational) Version Description Document (VDD) of the final software Product MAVEN_PF_FSW_033_VDD_V301.doc Status of Outstanding Problem Reports There is 1 outstanding Problem report against V2.6n Insufficient resources to repeat this configuration for diagnosis. Operational Code has 18 of 19 Closed SPRs

Summary SwATR Summary Operational LDS and CPT are Complete FSW Actions are Complete Operational FSW is Ready to Proceed to Flight