Mauro Morandin & Antoine Daël

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1 TRF Limited. TRF offers design, engineering, manufacturing, erection and commissioning solutions for complete or partial Balance of Plant in thermal.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Doing business with CERN Anders Unnervik 3 November 2014.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
Doing business with CERN Anders Unnervik 20 May 2014.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Closing Session Report
Purchasing Suppliers.
Camera PDR/CD1 Planning 19 September 2008
Minimum Set of Requirements for Suppliers
I. Bergevoet - Training preparation
Doing business with CERN Anders Unnervik
Minimum Set of Requirements for Suppliers
Doing business with CERN Anders Unnervik
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Installation of an Instrument on a CERN machine
CHAPTER 5 TECHNICAL ANALYSIS.
AD consolidation activities in LS2
Purchasing supplies at CERN
Ways to industry participation in CLIC 24th October, 2017
Possibility of China to collaborate and modality
Developing Information Systems
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
Chapter 18: Introduction to Assurance
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
The HL-LHC project: info day for industry
Upgrade Strategy for the Experimental Vacuum Systems
MicroMegas Mechanical Meeting --- Cern April 2014
Industrialization of previous projects
Low temperature chiller Market Survey
Fundamentals of PROCESS PLANT PIPING DESIGN
ChE 473K Plant Design R. Bruce Eldridge.
Diesel Automotive Engines
Vilijam Lajmanovski Catalyzing Market Transformation for Industrial Energy Efficiency and Accelerating Investments.
TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
Planning Quality control - Manufacturing logbook Photos Conclusions
Introduction to Projects
A Process View of the Supply Chain
Project Management Considerations
Elettra – Sincrotrone Trieste S.C.p.A.
Tasks, Responsibilities Expectations and Needs
East Hall under construction
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Mauro Morandin & Antoine Daël CERN Procurement Through functional specifications versus build-to-print Is it an important issue ? Mauro Morandin & Antoine Daël 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Outline Introduction ( Mauro) Case study 1 ( Mauro) : Power converter Case Study 2 ( Antoine) : Magnets Case Study 3 & 4( Antoine) : Collimators & HVAC Comments and potential evolutions : Mauro Comments and potential evolutions : Antoine Conclusion and next steps : Mauro & Antoine 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Is it an important question ? My answer is YES The answer to the question « are the functional specifications better or more suitable than build to print order » is not binary : Yes or No I like to rephrase the question 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Fully functional specifications Fully « build to print » ? And the question may be rephrased : case by case where to put the cursor ? 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Case Study 2 ( Antoine) : Magnets Conventional magnets and superconducting magnets In the case of conventional magnets , CERN will usually give just a principle design , interface definition with implementation constraints and requested performances WHY ? Because many companies have now the competences to design and build conventional magnets and CERN should not do what European industry can do. In the case of superconducting magnets , CERN will usually give a fully detailed design and drawings which are very close to fabrication drawings. And CERN keeps the functional responsibility WHY ? Because no company has the necessary full skil to design frontier edge magnets and some of the procurements have to be launched well in advance to meet schedule 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Where to put the cursor ? Conventional magnets : we are very close to fully functional specifications but not 100% because a preliminary design is always useful to fix all the interface details Fully functional specifications Fully « build to print » 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Where to put the cursor ? Fully functional specifications Superconducting magnets : we are on the build to print model but not 100% because the fabrication drawings , in the workshop, are always reviewed by the Company. Fully « build to print » 26/09/2017 14th ILO Forum CERN Council Chamber

Case Study 3 ( Antoine) : Collimators The procurement strategy for the new HL-LHC collimators at present involves four major contracts : the supply of raw material for the jaws’ back-stiffener, the supply of low-impedance absorbing blocks, the supply of cradles and supports, a final contract for the remaining mechanical manufacturing and assembly Additional components will be purchased using standard price inquiries or invitations to tender We can hardly imagine to procure these sophisticated and so critical equipment on the basis of functional specifications 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Where to put the cursor ? Fully functional specifications COLLIMATORS : very close to 100% Fully « build to print » 26/09/2017 14th ILO Forum CERN Council Chamber

Case Study 4 ( Antoine) : HVAC CERN’s cooling and ventilation systems consist of 4 000 heating, ventilation and air-conditioning (HVAC) installations, cooling and fluid distribution facilities, compressed-air and demineralised water production plants, fire-fighting systems, discharge pumping stations and waste-water pumping systems. This equipment is critical for safety and for the operation of the accelerators and the experiments. New large scale facilities , like ITER or ESS , are contracting “turn-key” and the scope includes operation and maintenance. This method is difficult in a existing facility but evolution may be discussed 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Where to put the cursor ? Fully functional specifications HVAC ? Fully « build to print » 26/09/2017 14th ILO Forum CERN Council Chamber

14th ILO Forum CERN Council Chamber Comments and potential evolutions : Antoine Why CERN is more often on the “Buid to print” side ? Because equipment are usually specific and highly sophisticated Because the main duty of CERN being to serve Physics by operating the accelerator chain, CERN teams need to master completely those equipment Because CERN has internally very powerful and competent engineering teams able to produce the suitable detailed designs Also present CERN good practices are consistent with the procurement rules I am personnally in favor of suitable evolutions , mainly in the procurement of conventional hardware , especially when available « from the shelf » or easy to develop in European industry 26/09/2017 14th ILO Forum CERN Council Chamber