UV Startup Procedure.

Slides:



Advertisements
Similar presentations
Engineer Training Machine Electrical Cabinet TJ8300 / TJ8500 Machine Electrical Cabinet (EC)
Advertisements

Engineer Training UV Lamp Head TJ8300 / TJ8500 UV Lamp Head.
RJ Mann Catalytic Monitoring Systems. RJMCMS 100 Low Cost Single Engine Monitoring System Monitors Pre and Post Catalyst Temperatures, Differential Pressure.
Engineer Training Installing the UV Lamp TJ8300 / TJ8500 Installing the UV Lamp.
Operating Functions.
CRC Technology Training November Help and How-To.
In this presentation you will:
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
DYNAPAC F1000T/W Paver Controller System
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Ladder Logic PLC Programs are made up of combinations of AND; OR; NAND; NOR; and other gates, along with timers, inputs, outputs, counters, comparators,
Engineer Training XL1500 Safety System. Engineer Training XL1500 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
Engineer Training Electrical Cabinet (EC) TJ8300 / TJ8500 Electrical Cabinet (EC)
Lecture 7: PLC: Review Questions
10 minute Activity Be ready to report back in ten minutes.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
Engineer Training Drum Heating TJ8300 / TJ8500 Drum Heating.
The First Central Emergency & Standby Lighting System Combining Storage Batteries & Generator Input 1 1.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
2-Stage Heat Pump Defrost Options Defrost options: –30, 60, 90, 120 or Auto (Infinity/Evolution only) Defrost initiate temp: 32° F Defrost terminate temp:
© 2006, ZTE Corporation. All rights reserved.   E300 Series Mini-type Integrated Universal Inverter.
COMPUTER MANAGEMENT. System start-up Before switching on a computer, make sure that all the components are properly connected. The computer must be connected.
March ) Pretreatment Tank 2) Aeration Chamber 3) Clarifier Chamber 4) Chlorinator 5) Holding Tank 6) Aerator Pump 7) Millenium Control Center 8)
Continue The information provided in this training module covers the schematic flow charts for all ovens and ranges that utilized a preheat board, Self.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
10 energy saving tips for the house. Switch off the lights when not in use.
Engineer Training Electronics Cabinet TJ8300 / TJ8500 Electronics Cabinet.
PLC Counters. Introduction We use timers to measure the elapsed time between two events. With retentive timers the “run” signal can be turned on and off.
Engineer Training UV Electrical Cabinet (1-15) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 1-15)
EU 1000i and EU 2000i SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Industrial Electronic Department Copyright of German Malaysian Institute. All rights reserved.
GET READY Questions will run automatically. Set 2 Question  0.35.
Time Management.  Time management is concerned with OS facilities and services which measure real time, and is essential to the operation of timesharing.
TECHNICAL TRAINING INVERTER-Y
Engineer Training Checking the Motor’s Rotation Direction TJ8300 / TJ8500 Checking the Motor’s Rotation Direction.
GET READY Questions will run automatically. Set 9 Question 1 How many sides does a heptagon have?
Magnum Chiller Plant Manager
Customer Driven Solutions2 Background Gearboxes with High Power –Duty Cycle Issue How to stabilize temperature? Modular cooling package for stationary.
Transmission electron microscopy (TEM)
NN-CS596S Steam Microwave Oven. NN-CS596S Oven Specification.
P.1 Book E3 Section 1.5 Energy Efficiency Labelling Scheme Standby mode Hong Kong Energy Efficiency Labelling Scheme Saving energy Check-point Energy.
18 MW TURBINE CONTROL PANEL
Electrical system : Operator station PLC display Engine under operation - Operating the unit is carried out from the Operator Station. - Two rotary switch.
2013 CHIGO Product CHIGO CMV VRF Control System.
MACHINE OPERATION.
Svara Functional overview
Comparison between L – Series / K - series
PLC Millenium II Application Notes NEUSS November 2004.
A Pilot’s Guide to Using HFDL
NEC NP-PH1000U SPECIFICATIONS FEATURES Display Technology 0.96” DMD
PLC Timers MECH 1500 Two classes of timers: Retentive Non-Retentive.
SPOC Automation and BECI- who are we?
Ratio r: 2:1 RPM: 8 t: 20:10 R: 8:16 RPM: 16 Teeth: 20 Radius: 2
Three Minute Timer Two Minute Timer One Minute Timer
ATLAS Thermosiphon Electrical Distribution and Run Modes
Competitor Information Event Contact: Christian Ball
Control Systems An Overview Computer Integrated Manufacturing
Voyager II and III – Energy Recovery Modules
Free 10 Minute Timer Use to time breaks, discussion groups, etc.
Control Systems An Overview Computer Integrated Manufacturing
Millennium touch screen Operated Profiler Series Roaster control
Loop Water Controller Overview
Digital Chart Recorder Operation
Overview of HVAC control panel
60 MINUTES REMAINING.
Making) Melody timer.
Compressor Operating Instructions
Energy Saver Toolkit Alan Choi.
Presentation transcript:

UV Startup Procedure

Enabling the On Signal to the UV Electrical Cabinet To start the UV system, enable the On signal to the UV electrical cabinet. The On signal is automatically enabled when the machine is turned On. Confidential

Cooler fans, pump and extraction fan start working automatically. Cooling On The Cooling On process starts upon enabling the “UV On” signal to the UV electrical cabinet. During this process: Cooler fans, pump and extraction fan start working automatically. The Cooling On message appears and timer T1 is incremented from 0 seconds to 2 minutes. The Extractor fan is controlled by a frequency inverter (A7 in the UV electrical cabinet), which will start at 60Hz (full speed). Confidential

Cooling On (Cont.) T1 Confidential

After the Cooling On is complete: The UV lamp starts working. Lamp Started After the Cooling On is complete: The UV lamp starts working. The extraction fan reduces its speed to 11Hz and the PLC will monitor the lamp current during the " Burn-in" stage. Once the current reaches a pre-set level (about 80A), the UV lamp switches to standby power. UV Ready signal is sent to the machine. Confidential

Lamp Started (Cont.) Confidential

UV Ready Signal Confidential

UV lamp now runs at standby power (30%) with the shutters closed. Lamp Ready UV lamp now runs at standby power (30%) with the shutters closed. The extraction fan remains at reduced speed (11Hz). The lamp current is displayed (40A). UV lamp hours are now displayed. Confidential

Lamp Ready (Cont.) Confidential

Stabilization Confidential