LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
February 2009 Summary of Chamonix 09 Steve Myers.
November December
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
PROJECT COMPLETION TIMELINE
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
TS, Length of YETS EYETS LIU & CONS Project
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K. Foraz, S. Prodon TS-IC TS workshop – May 2005 Underground logistics K. Foraz, S. Prodon TS-IC.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
R2E Workshop Preparations RadWG Meeting March 25 th.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Registered participants participants from outside Cern.
Closing Session Report
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
I. Bergevoet - Training preparation
Program Management Office (PMO) Design
Program Management Office (PMO) Design
CERN Construction Planning and Scheduling (LHC installation)
DISASTER MANAGEMENT.
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
Space Management and Logistics during LS2
East Hall under construction
Safety in Construction and Upgrade Phases
LHC Dipole Diode Insulation Consolidation Review (I) INTRODUCTION
Lucio Rossi Project Leader
Program Management Office (PMO)
Project Management Essentials Connecting PI to PM
Consolidation of the dipole diode insulation Technical aspects
Overview & baseline of LS2 and roadmap for CRG
East Hall under construction
Phase 3 Tollgate Review Discussion Template
Status report on the activities of TF-CS/OTA
Participative Process Reviews
Program Management Office (PMO)
Program Management Office (PMO)
introducing MICHELLE SLY
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Safety in the East Area Renovation Project
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017 Chamonix - LS2 session

2017 – CMAC recommendations Slide 23 (21-22) - Identify major scope additions as soon as possible The PLAN exercises performed during 2017 aims to decide on additional activities. This is under control, and PLAN exercises are also foreseen to be performed during LS2 Experiments have now included, in PLAN, their activities for which they will need support from infrastructure services Master schedules are being refined and will be presented in Chamonix 2018 Slide 14 : “We recommend to perform a detailed risk analysis of potential damage to the SC magnets during an extensive training campaign (as well as operation) to 7 TeV. Based on the outcome  of this analysis and the associated mitigation plan we recommend to train the LHC magnets to 7 TeV before the end of LS2, allowing a sufficient margin for the LHC machine to recover from unknown events.” : Will be treated in talk of J.-P. Tock 24/11/2017 Chamonix - LS2 session

Program (1/2) Thursday 01 Feb @ 8h30 Chair: J.-M. Jimenez Scientific secretary: K. Foraz 1. PLAN K. Foraz PLAN requests status Highlight on blocking points per facility Highlight on critical groups 2. Injector : coordination &  master schedule J. Coupard List of installation activities, risks and mitigations Installation preparation, logistics (workshops / blank assembly space / temporary and long-term storage / R and NR waste…), safety aspects… Planning: timeline, resources, coactivity, critical path for all machines 3. LHC: coordination & master schedule M.Bernardini 24/11/2017 Chamonix - LS2 session

Program (2/2) 4. Non LHC-Experiments M. Brugger Objectives and activities Critical path and risks associated Operating system needed during LS2 5. LHC experiments A. Ball Objectives and activities in each LHC experiment (incl. Foward detectors) 6.  Diodes consolidation including magnets replacement J.-P. Tock Follow-up of CMAC recommendation Objectives Technical solutions & review Schedule and organization 7. Status and plans for Inner Triplets alignment S.Lenaour LS2 session preparatory meeting in December (date not yet confirmed) 24/11/2017 Chamonix - LS2 session

Charge questions Is the objective scope of LS2 clearly defined and communicated ? Are the LS2 plans consolidated in terms of resources, organization, support teams? What is the planned contingency? 24/11/2017 Chamonix - LS2 session