ESS RF Development at Uppsala University

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

RF Development for ESS at Uppsala University
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Test Lab Cryogenic Requirements Kirk Davis Director’s Review of Cryogenic Capacity 26 May, 2010.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
ESS Spoke Linac section RF Anders Sunesson, RF group leader Rutambhara Yogi ESS Carlos Martins ESS Roger Ruber FREIA.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ESS Linac Upgrade Dave McGinnis Chief Engineer / Accelerator Division May 27, 2014.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
High Power RF Solid State Amplifiers at FREIA
Cryomodule test stand at ESS site
Plans towards CC in the LHC a US – centric perspective
WP5 Elliptical cavities
Requirements for Efficient CW SRF Cryomodules
Uppsala Commitment to ESS and FREIA Planning
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Second SPL Collaboration Meeting, Vancouver May 2009
Accelerator Research and Innovation for European Science and Society
Chris Adolphsen Sergei Nagaitsev
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
BriXS – MariX WG 8,9 LASA December 13, 2017.
CW Operation of XFEL Modules
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
CEPC RF Power Sources System
Collaboration Board Meeting Closing Hasan Padamsee
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
First High Power Test of the ESS Double Spoke Cavity package
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Cryomodules Challenges for PERLE
CLIC Feasibility Demonstration at CTF3
The spoke CM tests at FREIA
RF introduction Anders Sunesson RF group leader
ERL Director’s Review Main Linac
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

ESS RF Development at Uppsala University Roger Ruber for the FREIA team Uppsala University

ESS-UU Collaboration 2009 ESS and UU start discussion on 704 MHz RF development proposal for ESS dedicated test facility at UU 2011 Spring: ESS-UU contract on 704 MHz RF R&D ESS changes to 14 Hz rep rate, 2.89 ms beam pulse Fall: ESS changes pulse modulator strategy delays UU test stand 2012 UU on 352 MHz RF for spoke resonators keep 704 MHz for future Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

RF Development Proposal Contribution to the Technical Design Report (WP8) design concept 352 MHz spoke source design concept RF distribution Contribution to the construction planning effort (WP19) survey test stand infrastructure and requirements study of upgrade scenarios RF systems for ESS power upgrade Development 352 MHz RF power amplifier for spoke resonators 1st prototype, test with water load and SRF spoke resonator, incl. LLRF RF system test prototype spoke cryomodule high power test with 2nd RF power amplifier and LLRF Acceptance testing spoke cryomodules for all final cryomodules before installation Development klystron pulse modulator full test incl. klystron and RF system, if available with SRF cavity Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

Timeline for Coming 5 Years Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

Objectives Validation technical design and acceptance testing of production elements RF system including power source, amplifiers, distribution and controls test with SRF cavity (Lorenz detuning, microphonics, …) Increased operation efficiency and decreased cost minor fault might create a major risk contingency in the design must ensure low beam loss operation to prevent activation of accelerator components major part of the accelerator budget must be cost, energy and resource effective for construction & operation Training of future staff participate in prototyping to prepare for operation Roger Ruber - Discussion on Studies at Test Stands ESS, 06-Feb-2012

Test Stand Matrix Roger Ruber - Discussion on Studies at Test Stands ESS, 06-Feb-2012

FREIA: Accelerator & Instrumentation R&D New facility at Uppsala University cryogenic center (LHe and LN2 distribution) RF development project for ESS training of students and staff Integrated with physics and astronomy located at Ångström laboratory new sub-department (head Tord Ekelöf) 12 staff (full and part-time) multiple funding sources Hardware 1000 m2 hall helium liquefier (>70 l/h) test cryostat test bunkers Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

FREIA Hall Design Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

FREIA Hall Internal Layout compressors RF area bunkers cryo Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

FREIA Cryogenic Infrastructure Helium liquefier 100 l/h with LN2 pre-cooling 2000 l buffer distribution box to users Interfacing dewar filling station LHe and LN2 dewars impure gas recovery from users 2K pumping station General purpose test cryostats horizontal, like HoBiCat vertical Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

RF Development Project 352 MHz RF Source development 352 MHz ~350 kW for ESS double spoke resonators possible candidate: TH781 requires test at 352 MHz and an output cavity development, 400 kW pulsed should be ok (500 kW pulsed at 200 MHz), water cooled will study DC or pulsed power supply (energy saving) test with water load, full RF system test with spoke resonator Spoke cryomodule testing build 2nd RF source full RF system test with complete cryo-module prototype than cryo-module acceptance testing during construction phase Test prototype pulse modulator with klystron load Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

Proposal for Additional Test Program Alternatives RF generation, distribution and controls test alternatives in relation to staging of beam power and energy multiple cavities per klystron, min. overhead on possible vector modulator multiple klystrons per modulator Energy efficiency and recovery higher efficiency klystrons (long long future) energy recovery from klystron/load’s cooling water Limits in cavity performance Lorenz detuning HOM couplers: multipactoring and use as BPMs multi-cavity field emission Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012

Conclusions Uppsala RF Development redefined to 352 MHz continued contribution to TDR (in WP8) design concept 352 MHz spoke RF power source + RF distribution new WP19 ”Test Stands” survey test stand + study of upgrade scenarios RF systems prototype 352 MHz source + test prototype spoke cryomodule proposal to extend with testing spoke cryomodules + development klystron modulator Uppsala FREIA project engineering for experiment hall in full swing negotiations b/w ESS and UU on contract change UU fully commited Uppsala shall … ”taking on such work with priority over work for other possible projects…” (ESS-UU contract agreement) Roger Ruber - RF Development at UU ESS TB, 08-Feb-2012