Test plan of ESS HB elliptical cavity

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

Two Beam Module Thermo-mechanical tests Elena Daskalaki Alex Vamvakas Athanasios Zelios.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
The Mechatronics Design Lab Course at the University of Calgary Presented June 2, 2003.
ESE Lab Computer based Temperature Control Sid Deliwala, ESE Labs.
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Eye Detector Project Midterm Review John Robertson Roy Nguyen.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
Heat load study of cryomodule in STF
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Precipitation Type: __________________ Amount: ________________ Name_________________ Date__________ Temperature High: __________________ Low: ________________.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS Team Members: Ryan Bickham, Dennis Blosser Cody Dinkins, Todd Dutton, Rachel Shively February.
Cryolab Deployment Raul Valera Teruel Pablo Fernández López 2015/11/10.
Performed by: Ziv Landesberg Instructor:Evgeniy Kuksin המעבדה למערכות ספרתיות מהירות High speed digital systems laboratory הטכניון - מכון טכנולוגי לישראל.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Team 19 Project Br ö sel. Team Members 2/9 The Project Design Alternatives Testing Future Work Questions Team Members Nathan Leduc Electrical/Computer.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Control system at the FREIA Laboratory
Teleconf ACS – FREIA 28th March 2017
National Centre for Nuclear Research, Poland
Solid State Amplifier Development at PSI
PHYSICS PROJECT WITH A RESEACH BASIS 5c
Minimum Hardware Commissioning – Disclaimer
Spoke Cavity Power Coupler for the European Spallation Source (ESS)
ProtoDUNE SP – Slow control temperature readout setup test
RF interlocks for higher intensities (LMC 15 June)
Quench Protection Younguk Sohn
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
HO Corrector Magnets: decapole test and future plans
Test plan of ESS HB elliptical cavity
(vertical cryostat, Gersemi)
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
ESS RF Development at Uppsala University
Cryogenic C&C Scope of work
XFEL cavities and cryomodules measurements at AMTF
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
Cryogenic System Commissioning Summary Report
First High Power Test of the ESS Double Spoke Cavity package
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
SPOKE Cavities frequency preparation plan and RF control procedures
The spoke CM tests at FREIA
Teleconference ACS – FREIA 19th June 2017
How Do We Define Acceptance of a Cryomodule? - A Discussion
Bonjour. Franck Peauger. Je suis Ingénieur RF accélérateurs au SACM
Status of the ESS High Power RF Systems
Cryomodule Test Schedule
SNS PPU Cryomodule Instrumentation
Facility for Research Instrumentation and Accelerator Development
Burst Disc Review Closeout 21 May 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Test plan of ESS HB elliptical cavity Han Li On behalf of FREIA team FREIA Laboratory, Uppsala University 10th of Oct. 2017

Current progress 704 MHz SEL> Hardware: SEL box is under design and will be finished at the end of Oct. ---key people: Tord, Tor and Han Software: SEL Labview interface will be modified next week ---key people: Han and Tor Temperature sensors Temperature sensors location of interested. ---key people: Rocio, Magnus, Younguk and Han Four wire heater for power calibration Wiers extending of hearter; One current meter is need to connect in the loop. ---key people: Rocio

Current progress (cnt.) Quench detection> Simulation: cavity quench profile simulation Quech detection analog loop simulation Hardware: component order and board solder ---key people: Magnus, Tord Peterson and Han Coupler conditioning factor> FPC conditioning Source frequncy cavity frequency Warm 704.42MHz ? Cold 704.0947MHz

To do list 704 MHz Conditioning system Hardware: Validation of Interlocks ---key people: Konrad and Kjell Power limitation and interlock ---key people: Magnus, Konrad and Han Software: SEL Labview interface will be modified next week ---key people: Han and Tor Quench detection Simulation of cavity profile during MP and using this profile to test our quech detector design ---key people: Magnus and Han Pressure gauge test Find out the reason of the step-wise reading and how ti improve it? ---key people: Rocio, Konrad and Han