IT-4328: Technical Specification

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Sway Control System – Series 2 (SCS-S2) Leading the Way in Innovative Product Development.
EditablePowerPoint Slides for Lecturers By Phil Hughes MBE and Ed Ferrett By Phil Hughes MBE and Ed Ferrett.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Overhead Cranes Considerations and Applications by Craig Pelkola Applications Engineer North American Industries Boston, Massachusetts, USA.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
R. Rinaldesi, K. Kershaw – HE Group
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
FCC layout: lifts & cranes Ingo Rühl / EN-HE FCC Infrastructure & Operation Meeting 17 December 2014.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
NEW SLIDING DOOR OPERATOR SERIES A140 AIR
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
11/04/15Asansor Istanbul April Protection against unintended car movement EN 81-1/2 A3 EN 81-1/2 A3 Wolfgang ADLDINGER Chairman – Components.
TENDERING PROCEDURE IT- 3927/EN
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
Working Platforms (Heavy Lifting Equipment) -What does a working platform dealer sell or rent? _____________________________________________________________________.
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
CRANE RELIABILITY Mechanical Faults CENF TARGET AREA - OVERHEAD CRANE Hoist (lifting movements)
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Service.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Different cable reel has a different role. Hysteresis type cable reel working principle and scope The working principle of A. Power control system is.
Design of Crane Components
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Overhead cranes consolidation in EHN1 R.Rinaldesi EN-HE.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
1 Unit 8: Part 2 - Mechanical handling NEBOSH Health & Safety Certificate.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Rosava Group Gantry Crane.
Gantry Crane Manufacturer Rosava Engineering Group.
Gantry Crane Gantry Crane  Rosava Engineering Group presents the Gantry Crane. We provide cranes.
Gantry Crane manufacturer Rosava Engineering Group Mobile ,
MODERNIZATIONS.
CORRECTIVE MAINTENANCE AND RETROFITS
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Constraints Space Load Capacity Costs Operating hours.
Handling Engineering Group
CLIC Handling Engineering Update
Updated Design of Detector Hall
EN-Handling Engineering Group
SX1 manipulation VERSION 1 Version
Who is Responsible for Overhead Crane and Hoist Operations
FCC lifts Layout, characteristics etc.
TENDERING PROCEDURE IT-3981/EN
Press “Space” to start presentation
EN-HE SPS works during EYETS
SR1 cleanroom extension
IT-4328/EN Bidders conference
Gantry Crane Manufacturer Ethiopia Rosava Group Engineering Gantry Crane Manufacturer
The advantages of going wireless
The Basics of Overhead Crane Pre-op Inspections
Order of Engineers and Architects New Lebanese Standards Related to LIFTS NL EN 81standards Habib Srour.
From AS :   Part 4— Commissioning, operation and asset management
CMS Gantry for Detector Lowering
NATIONAL LEADER IN TESTING, INSPECTION AND CERTIFICATION
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Infor EAM in the Handling Engineering Group at CERN
Unit 8: Part 2 - Mechanical handling
IT-4464/EN Bidders conference
Frank Power Ergonomist (Inspector) Health and Safety Authority
Presentation transcript:

IT-4328: Technical Specification EN-HE

IT-4328 Bidders' conference, 8th-9th November 2017 Scope of the supply Custom EOT cranes Dismantling, refurbishment and supply of EOT cranes according to our consolidation program and to cover new requests About 25 consolidation projects will be object of this contract Ever-changing consolidation program requires a flexible structure for the contract: Blanket purchase contract Definition of a price list IT-4328 Bidders' conference, 8th-9th November 2017

Price list: IT-4328_EN UPL Crane A B C D E F G Capacity [tonne] 10 20 30 40 60 80 120 Span [mm] 13000 ± 2000 16000 ± 3000 10000 ± 2000 15000 ± 2500 13000 ± 3000 14500 ± 1500 14000 ± 1500 Lifting Height [mm] 7000 ± 2000 8000 ± 2500 9000 ± 3000 7000 ± 2500 12000 ± 3000 Max hoisting speed [m/min] 12 - 15 6 - 8 4 - 5 Max cross travel speed [m/min] 8 – 10 8 - 12 8 - 10 Max long travel speed [m/min] 15 - 20 20 - 25 Installation height [mm] 8000 ± 2000 9000 ± 2500 10000 ± 3000 11000 ± 2000 IT-4328 Bidders' conference, 8th-9th November 2017

IT-4328 Bidders' conference, 8th-9th November 2017 Price list: IT-4328_EN UPL Intervention 1 Dismantling of Hoist Trolley 2 Dismantling of an EOT Crane 3 Replacement of Rails 4 Replacement of Electrical Feeding Line 5 Replacement of Frequency Converters 6 Replacement of PLC System 7 Replacement of Electrical System 8 Replacement of Long Travel Mechanisms and Conformity Works 9 New Hoist Trolley 10 New EOT Crane 11 Replacement of Hoist Mechanisms 12 Revision of Hoist Trolley Details in §§ 2.2 and 2.3 of the Technical Specification IT-4328 Bidders' conference, 8th-9th November 2017

IT-4328 Bidders' conference, 8th-9th November 2017 Price list: IT-4328_EN UPL Items A2 to G10 (basic prices) are derived combining the cranes and the possible interventions Weight factors represent the probability that an item will be actually ordered Support documents: Annex 1 (§§ 1 to 7): General Requirements for Electrical Overhead and Gantry Cranes; Annex 2: PLC Programming and Documentation Requirements; Annex 3: Radio Remote Controls Requirements; Annexes 4A-4G: Questionnaire for EOT cranes A-G; Annex 5: Risk Assessment and Reduction. Installation conditions: surface building without particular space constraints IT-4328 Bidders' conference, 8th-9th November 2017

Additional Features and Activities Price list: IT-4328_EN UPL Additional Features and Activities 1 Dismantling of operator cabin 12 Auxiliary hoist sliding on a monorail 2 Lamp maintenance platform 13 Redundancy of all motors 3 Motorized hook 14 Redundancy of hoisting motor 4 Safety zones managed by PLC 15 Cubicles in remote position 5 Safety zones managed by PLC and HMI 16 Emergency brake 6 Coupled operation 17 Double of the lifting height (with respect to the highest value of the range) 7 Camera system 18 Shaft crane (100 m of lifting height) 8 Distance-assistance system 19 Double the span (with respect to the mid-value of the range) 9 Sway reduction 20 Guide-rollers to limit EOT crane skewing 10 Anti-collision system 21 Main electrical switch 11 Auxiliary hoist fixed on trolley To be considered as PRICE INCREASE Items H1 to H21_G Details in Annex 1 § 8 IT-4328 Bidders' conference, 8th-9th November 2017

Additional Manpower and Equipment Context of Installation Price list: IT-4328_EN UPL Additional Manpower and Equipment 1 Team of two technicians (daily rate) 2 Engineer (daily rate) 3 Work planning for radiation areas (preparation work) 4 Rental of a working platform (daily rate) 5 Rental of 100 tonnes mobile crane (daily rate) 6 Rental of 50 tonnes truck crane (daily rate) 7 Rental of 20 tonnes truck crane (daily rate) Items I1 to I7 Details in § 4.7.9 of the Technical Specification Context of Installation 1 Installation in surface building with space constraints 2 Installation in underground areas 3 Installation in radiation areas Items J1 to J3 To be considered as PRICE INCREASE Site visit Annex 6 IT-4328 Bidders' conference, 8th-9th November 2017

IT-4328 Bidders' conference, 8th-9th November 2017 Ordering procedure Contractor will receive a data sheet (structure similar to one of the Annexes 4) containing the following information: Data of the crane subject to intervention Type of activity (refurbishment, replacement…) Additional features Context of installation Contractor shall present an offer based on the price list Release order will follow IT-4328 Bidders' conference, 8th-9th November 2017

IT-4328 Bidders' conference, 8th-9th November 2017 Ordering procedure Example Project type: Refurbishment with new electrical feeding line Capacity: 40 ton Span: 16.000 mm Lifting height: 22.000 mm Hoisting speed: 8 m/min Cross travel speed: 15 m/min Long travel speed: 20 m/min Installation height: 11 m Length of rails: 40 m 9.000 ± 3.000 for crane D! Standard length = 50 m! IT-4328 Bidders' conference, 8th-9th November 2017

IT-4328 Bidders' conference, 8th-9th November 2017 Ordering procedure Example Applicable items: Dismantling of hoist trolley -> D1 New hoist trolley -> D9 Replacement of electrical system -> D7 Replacement of long travel mech. and conf. works -> D8 Replacement of electrical feeding line -> D4 Double of the lifting height -> H17_D Total price = D1 + D9 + D7 + D8 + D4*40/50 + H17_D IT-4328 Bidders' conference, 8th-9th November 2017

IT-4328 Bidders' conference, 8th-9th November 2017 Ordering procedure Prices for items which are not covered shall be, as much as possible, extrapolated from the price list Negotiation before order No committment to order IT-4328 Bidders' conference, 8th-9th November 2017

Performance of the contract IT-4328 Bidders' conference, 8th-9th November 2017

Performance of the contract IT-4328 Bidders' conference, 8th-9th November 2017

Performance of the contract IT-4328 Bidders' conference, 8th-9th November 2017

Performance of the contract IT-4328 Bidders' conference, 8th-9th November 2017

Performance of the contract IT-4328 Bidders' conference, 8th-9th November 2017

Performance of the contract IT-4328 Bidders' conference, 8th-9th November 2017

Performance of the contract IT-4328 Bidders' conference, 8th-9th November 2017